61 Garfield Tce
Kaicon - Frank Developments
What's new
- 10 Nov 20264 files saved on SharePoint: GCC App DA-1078834.pdf, CC03556-S1-TGS-Rev15 SB Lane Closure.pdf, Appendix M - Letter to Residents.pdf, Appendix M - Letter to Residents.docx
- 6 Nov 20261 file saved on SharePoint: GCC App DA-1077658.pdf
- 29 Oct 2026, 10:24 amPermits on CC03556-S1 - Rev 21 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe: Hi Plans folder: Plans-CC03556 Suite: S1 Save work here: KAICON - 61 GARFIELD TERRACE 1 X NEW TGS AND TMP AMENDMENT - HAS PERMITS PENDING TGS > Rev 21 Project location: 61 Garfield Tce Job request saved in folder Attachment: Job Request_Watermarked.pdf Thank…
- 25 Sep 2026, 3:07 pmPermits on CC03556-S1 - Rev 20 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe: IV0025394 sent to client - Shaz 25.09 1x tmpa 1x amendpa Re_ Re_ MIRA Crane Dismantle.eml
- 25 Sep 2026, 8:36 amK.R on CC03556-S1 - Rev 20 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe: Invoicing Notes: 1 x TMP amendment to include Oceanway Gantry Removal and Tower Crane Removal Information 1 x TGS Amendment to add minor updates to 2 TGS for these works.
- 23 Sep 2026, 10:16 amPermits on CC03556-S1 - Rev 20 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe: CTMP Rev 20 sent to client - Kerri 2309 Re_ MIRA Crane Dismantle.eml
Crompton Concepts prepares the traffic management for Kaicon - Frank Developments on this project. 1 Monday request is open; the most pressing is at the with client stage; the current CTMP on SharePoint is Rev 20; 2 TGS suites on file (S1 Rev 15, S2 Rev 20). On the permit boards: 0 permits in force and 4 in progress. Monday holds 14 requests for this job (0 new, 14 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans-CC03556
- MondayCC03556-S1 - Rev 21 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe
- Client
- Kaicon - Frank Developments
- Crompton job
- CC03556
- Location
- 61 Garfield Tce
- LGA / authority
- —
- Project coordinator
- —
- Latest planner · TMD
- Christine Vilador · Christopher Wright
- Monday project status
- —
- Deliverables
- —
- Permits (Monday)
- 0 in force · 4 in progress
- Last activity
- 11 Nov 2026
- Files on SharePoint
- 755 in 144 folders
What needs attention now
- Urgent Issued, waiting on client: CC03556-S1 - Rev 21 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe. Required by 31 Oct 2026. Planner: Christine Vilador · TMD: Christopher Wright · Last note (29 Oct 2026, Permits): “Hi Plans folder: Plans-CC03556 Suite: S1 Save work here: KAICON - 61 GARFIELD TERRACE 1 X NEW TGS AND TMP AMENDMENT - HAS PERMITS PENDING TGS > Rev 21 Project location: 61…”
- Permit in progress: Crane Dismantle (Gold Coast) is Initial Pending. Follow up 13 Nov 2026. Wanted from 14 Dec 2026.
- Permit in progress: Low Impact Operational Permit – Submit under United Portal (Gold Coast) is Council Pending. Follow up 20 Nov 2026. Wanted from 5 Dec 2026.
- Permit in progress: Gantry Occupation – Submit under United Portal (Gold Coast) is Council Pending. Follow up 23 Nov 2026. Wanted from 11 Dec 2026.
- Permit in progress: Oceanway Gantry Removal (Gold Coast) is Council Pending. Follow up 24 Nov 2026. Wanted from 1 Dec 2026.
PPermits
4 permit lines on the Monday permit boards: 0 in force, 4 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| Crane Dismantle Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Date Specific | In progress Initial Pending | 14 Dec 2026 – 21 Jan 2027 | 24 Sep 2026 | 13 Nov 2026 | ||
| Low Impact Operational Permit – Submit under United Portal Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Ongoing | In progress Council Pending | 5 Dec 2026 – 31 Jan 2027 | 6 Nov 2026 | 20 Nov 2026 | 20 Dec 2026 | |
| Gantry Occupation – Submit under United Portal Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Ongoing | In progress Council Pending | 11 Dec 2026 – 31 Jan 2027 | 9 Nov 2026 | 23 Nov 2026 | 20 Dec 2026 | |
| Oceanway Gantry Removal Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Date Specific | In progress Council Pending | 1 Dec 2026 – 31 Jan 2027 | 10 Nov 2026 | 24 Nov 2026 | 20 Dec 2026 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC03556-S1-CTMP-Rev20.pdfCTMP Rev 20 · 22 Sep 2026
- PDFJ23-24 Mira - Piling Programme - Rev0 VS Forecast Feb 21, 2024.pdf22 Feb 2024
- PDF2023 12 20 - Construction Management Plan Rev 3 PDF.pdf1 Feb 2024
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 20 | 22 Sep 2026 | 4 | CC03556-S1-CTMP-Rev20.pdf |
| — | TMP | Rev 21 | 29 Oct 2026 | 8 | CC03556-S1-TMP-Rev21.pdf |
| — | RA | Rev 20 | 21 Sep 2026 | 2 | Appendix F - Desktop Risk Assessment.pdf |
| — | Letter to residents | Rev 20 | 21 Sep 2026 | 2 | Appendix M - Letter to Residents - Conduit & Energex Pit Works.pdf |
| S1 | TGS | Rev 15 | 10 Nov 2026 | 8 | CC03556-S1-TGS-Rev15 SB Lane Closure.pdfCC03556-S1-TGS-Rev15.pdf |
| S2 | TGS | Rev 20 | 21 Sep 2026 | 2 | Appendix G - CC03556-S2-TGS.pdf |
03Requests on Monday
14 requests since 23 Sep 2024: 0 for new plans and 14 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- ! Invoices to be sent to accountsaccounts@kaicon.com.au
- Senior CA - Kylie Reynolds0447 735 185
Crompton Concepts
- Christine ViladorPlanner
- Christopher WrightTMD
05Update log
Monday updates and replies on this project's requests, newest first.
- 29 Oct 2026, 10:24 am · Permits · CC03556-S1 - Rev 21 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe
Hi Plans folder: Plans-CC03556 Suite: S1 Save work here: KAICON - 61 GARFIELD TERRACE 1 X NEW TGS AND TMP AMENDMENT - HAS PERMITS PENDING TGS > Rev 21 Project location: 61 Garfield Tce Job request saved in folder Attachment: Job Request_Watermarked.pdf Thank you! 🧡Kim
- 29 Oct 2026, 5:30 pm · Christine Vilador
@S.B for TMD review. 1x Additional TGS CC03556-S1-Rev15-20A/B/C - Tower Crane Dismantling Setup 1x TMP Amendment - CC03556-TMP-Rev21, updated Section 8.4.3.3 to incorporate the revised tower crane dismantling arrangements, TGS schedule. Folder Link - Rev 21
- 2 Nov 2026, 11:12 am · Christopher Wright
This is GTG @K.R
- 3 Nov 2026, 11:32 am · K.R
Sent to client to review.
- 29 Oct 2026, 5:30 pm · Christine Vilador
- 25 Sep 2026, 3:07 pm · Permits · CC03556-S1 - Rev 20 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe
IV0025394 sent to client - Shaz 25.09 1x tmpa 1x amendpa Re_ Re_ MIRA Crane Dismantle.eml
- 25 Sep 2026, 8:36 am · K.R · CC03556-S1 - Rev 20 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe
Invoicing Notes: 1 x TMP amendment to include Oceanway Gantry Removal and Tower Crane Removal Information 1 x TGS Amendment to add minor updates to 2 TGS for these works.
- 23 Sep 2026, 10:16 am · Permits · CC03556-S1 - Rev 20 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe
CTMP Rev 20 sent to client - Kerri 2309 Re_ MIRA Crane Dismantle.eml
- 21 Sep 2026, 2:01 pm · KB.R · CC03556-S1 - Rev 20 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe
Hi @K.R @Christopher Wright, For CC03556-S1 - Rev 20 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe, I've amended following the instructions provided here. I've amended TGS 15A and had amended the title blocks of 6A and 15A to consider the proposed scope of works. I've reflected also the changes noted in the document, as well as additional instructions provided by Kerri. It is now available for review. Accounts: 2xTGS Amendment 1xTMP Amendment Link: Rev 20
- 21 Sep 2026, 10:06 am · Permits · CC03556-S1 - Rev 20 - Kaicon Pty Ltd/Frank Developments - 61 Garfield Tce Northcliffe
Hi @KB.R Please save work here: Plans-CC03556 > Rev 20 Please see instructions here: Two Closure Reqirements.docx @K.R will add additional info. Thank you - Shaz
- 21 Sep 2026, 10:21 am · K.R
@KB.R you may need to amend the TGS for the Oceanway closure as the Garfield Frontage shows Closed on the current version. Could you please update VMS sheet and letter to residents x 2 VMS - Road Conduit Works.xlsx CC03556 - Letter to Residents - Conduit & Energex Pit Works.docx let me know if you need any other information.
- 22 Sep 2026, 9:58 am · Christopher Wright
This appears to be GTG @K.R
- 22 Sep 2026, 3:02 pm · K.R
@KB.R
- 22 Sep 2026, 3:44 pm · KB.R
Hi @K.R, I've amended the noted changes you've listed down here. It is all uploaded on SharePoint. Let me know if there are further comments I wasn't able to address, if there are any. Thank you!
- 21 Sep 2026, 10:21 am · K.R
06Every file and folder
755 files in 144 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|