Brisbane Airport
Dowells
What's new
- 1 Sep 2026, 1:55 pmPermits on CC03916-S2 - Rev 4 - Brisbane Airport - Material Lay Down: Plans sent by Patrick - Lexi ** Hi Adam, Please see attached. TGS 4B amended to accommodate new truck movements Re_ TGS update - New Version needed for truck to turn around.eml
Crompton Concepts prepares the traffic management for Dowells on this project. No Monday request is open right now; the latest one closed recently; 6 TGS suites on file (General no rev, S1 Rev 02, S2 Rev 04, S3 Rev 00…). Monday holds 3 requests for this job (0 new, 3 amendments); all of them are on this page. Every file opens straight from SharePoint.
- Client
- Dowells
- Crompton job
- CC03628 · CC03916
- Location
- Brisbane Airport
- LGA / authority
- —
- Project coordinator
- —
- Latest planner · TMD
- —
- Monday project status
- —
- Deliverables
- —
- Permits (Monday)
- None on the permit boards
- Last activity
- 1 Sep 2026
- Files on SharePoint
- 108 in 44 folders
What needs attention now
- Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
Nothing filed for this yet.
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
Nothing filed for this yet.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- MSGTGS update - New Version needed for truck to turn around25 Aug 2026
- EMLFW LL-GCOR-022831 Materials handling updated TGS ACNXREF_9lDR3wXiqeD7XIrzoOoW10uiDCf_1 Jul 2026
- MSGTGS needed - Brisbane Airport - Generator Delivery12 Feb 2025
- MSGFW_ URGENT!! _EXT__FW_ LL-GCOR-004284_ Re_ TGS updates following site meeting 21_5_24 ACNXREF_gpFP3Hn3GchRJvWWjUdulB_24 Jun 2024
- MSGFW_ LL-GCOR-004284_ Re_ TGS updates following site meeting 21_5_24 ACNXREF_gpFP3Hn3GchRJvWWjUdulB_24 Jun 2024
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | NMP | no rev | 14 Feb 2024 | 0 | Equipment noise levels.pdf |
| General | TGS | no rev | 18 Mar 2024 | 0 | 240315 Material Handling zone line marking and TGS, swept path.df.pdfCC03916-TGS-S1.pdfTGS Check List.pdf |
| S1 | TGS | Rev 02 | 27 Feb 2024 | 1 | CC03916-TGS-S1-Rev2.pdf |
| S2 | TGS | Rev 04 | 25 Aug 2026 | 5 | CC03916-TGS-S2-Rev 04-Brisbane Airport.pdf |
| S3 | TGS | Rev 00 | 21 Mar 2024 | 1 | CC03916-TGS-S3.pdf |
| S5 | TGS | Rev 03 | 26 Jun 2024 | 4 | CC03916-S5-TGS-Rev 3.pdf |
| S6 | TGS | Rev 00 | 12 Feb 2025 | 1 | CC03916-S6-TGS-Rev 0.pdf |
03Requests on Monday
2 job numbers are treated as one project here (CC03628, CC03916): Monday requests name them together or they share a folder. 3 requests since 26 Jun 2026: 0 for new plans and 3 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC03628-S1 - Rev 01 - Dowells - Hibiscus St- Brisbane Airport | Amendment | S1 | Rev 01 | Closed No Charge | 25 Aug 2026 | 27 Aug 2026 | ||
| CC03916-S2 - Rev 4 - Brisbane Airport - Material Lay Down | Amendment | S2 | Rev 04 | Invoiced Invoiced | 24 Aug 2026 | 26 Aug 2026 | ||
| CC03916 - S2 - Rev 3 - Brisbane Airport | Amendment | S2 | Rev 03 | Invoiced Invoiced | 26 Jun 2026 | 28 Jun 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- adam@dowells.com.auadam@dowells.com.au
05Update log
Monday updates and replies on this project's requests, newest first.
- 1 Sep 2026, 1:55 pm · Permits · CC03916-S2 - Rev 4 - Brisbane Airport - Material Lay Down
Plans sent by Patrick - Lexi ** Hi Adam, Please see attached. TGS 4B amended to accommodate new truck movements Re_ TGS update - New Version needed for truck to turn around.eml
- 1 Sep 2026, 1:56 pm · Permits
1 TGS AMENDMENT INV IV0025008 Invoice IV0025008 - Re_ TGS update - New Version needed for truck to turn around.eml
- 1 Sep 2026, 1:56 pm · Permits
06Every file and folder
108 files in 44 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|