← All projectsCC03805 · CC06249
Project portal · built 17 Nov 2026, 10:03 am AEST · Recently active

BAC DTB

Dowells

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Dowells on this project at Aero Rd, Brisbane, QLD. No Monday request is open right now; the latest one closed recently; the current TMP on SharePoint is Rev 01; 36 TGS suites on file (General Rev 02, S1 Rev 02, S10 Rev 02, S11 Rev 01…). Monday holds 17 requests for this job (0 new, 17 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Dowells
Crompton job
CC03805 · CC06249
Location
Aero Rd, Brisbane, QLD
LGA / authority
City of Brisbane
Project coordinator
K.R
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS
Permits (Monday)
None on the permit boards
Last activity
3 Nov 2026
Files on SharePoint
314 in 123 folders

What needs attention now

  1. Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—TMPRev 017 Nov 202311. TMP - 10651 Satellite Road Electricals rev 01.pdf
GeneralTGSRev 0230 Jun 20261Contam Investigation Pack for TGS Rev02.pdfProposed TGS Truck routes.pdfTGS mark up CBS barrier removal.pdf
S1TGSRev 022 Jul 20263CC06127-S1-TGS-Rev 02- Erica Cct N Loading Dock.pdf
S10TGSRev 0226 Nov 20243CC03805-S10-TGS-Rev 02.pdfTGS - single lane closure - north canopy.pdf
S11TGSRev 015 Jul 20242CC03805-S11-REV01-TGS.pdf
S12TGSno rev7 Sep 20240CC03805-S12-TGS.pdf
S13TGSRev 028 Nov 20242CC03805-S13-TGS-Rev 2.pdf
S14TGSno rev19 Sep 20240CC03805-S14-TGS- Erica Cct Closure.pdf
S15TGSRev 021 Apr 20263CC03805-S15-TGS-Rev 02.pdf
S16TGSno rev19 Sep 20240CC03805-S16-TGS-South Canopy.pdf
S17TGSno rev12 Nov 20240CC03805-S17-TGS-D30 HV Pit.pdf
S18TGSRev 0218 Nov 20253CC03805-S18-TGS-Rev 02.pdf
S19TGSno rev19 Dec 20240CC03805-S19-TGS-Cable Pulling.pdfCC03805-S19-TGS-R1.pdf
S2TGSRev 029 Nov 20232CC03805-S2-TGS-REV 2.pdf
S20TGSRev 0324 Oct 20264CC03805-S20-Rev03-TGS- Bribie Way Barrier Removal.pdf
S21TGSRev 0028 Feb 20251CC03805-S21-TGS-Northern Bag Hall.pdf
S22TGSRev 083 Jun 20259CC03805-S22-Rev 8- TGS.pdf
S23TGSno rev1 May 20250CC03805-S23-TGS-MacLeay Way, Brisbane Airport.pdf
S24TGSno rev2 May 20250CC03805-S24-TGS-Bribie Way.pdf
S25TGSno rev28 Jan 20260CC03805-S25-TGS-Macleay Way, Brisbane Airport-test.pdfCC03805-S25-TGS-Macleay Way, Brisbane Airport.pdf
S26TGSno rev21 Aug 20250CC03805-S26-TGS- Brisbane Airport.pdf
S27TGSno rev11 Oct 20250CC03805-S27-TGS-Airside Setup.pdf
S28TGSRev 0122 Oct 20251CC03805-S28-TGS-Rev01- N Pet Area.pdf
S29TGSRev 038 Nov 20254CC03805-S29-TGS-Rev 03-Ghania St.pdf
S3TGSRev 021 Apr 20262CC03805-S3-TGS - Barrier Install CBS Establishment.pdfCC03805-S3-TGS -Rev 02.pdf
S30TGSno rev26 Feb 20260CC03805-S30-TGS-N Temp Screening Removal.pdf
S31TGSRev 0017 Apr 20261CC03805-S31-TGS-Rev 00.pdf
S32TGSRev 0020 Apr 20261CC03805-S32-TGS-Rev 00.pdf
S33TGSRev 008 May 20261CC03805-S33-TGS-Rev 00.pdf
S34TGSRev 0021 May 20261CC03805-S34-TGS-Rev 00.pdf
S35TGSRev 0015 Sep 20261CC03805-S35-TGS-Rev00.pdf
S4TGSRev 0230 Jan 20242CC03805-S4-TGS-REV 2.pdf
S5TGSRev 0626 Jun 20241CC03805-S5-TGS-Rev 6.pdf
S6TGSRev 0013 May 20241CC03805-S6-REV00-TGS.pdf
S7TGSRev 0518 Oct 20246CC03805-S7-TGS-Rev 5.pdf
S8TGSRev 0426 Nov 20245CC03805-S8-TGS-Rev 4.pdf
S9TGSRev 0223 Jan 20263CC03805-S9-REV02-TGS.pdf

03Requests on Monday

2 job numbers are treated as one project here (CC03805, CC06249): Monday requests name them together or they share a folder. 17 requests since 26 Jul 2024: 0 for new plans and 17 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC03805-S20 - Rev 2 - Dowells - BAC DTBAmendmentS20Rev 02Invoiced
Invoiced
16 Oct 202618 Oct 2026
CC03805 -S35 - Dowells - BAC DTB (Airside Lane Closure)AmendmentS35Invoiced
Invoiced
20 Sep 202622 Sep 2026
CC03805 -S35 - Rev 1 - Dowells - BAC DTB (Airside Lane Closure)AmendmentS35Rev 01Closed
No Charge
15 Sep 202617 Sep 2026
CC06249/CC03805 - S33 - Rev 0 - BAC DTBAmendmentS33Rev 00Invoiced
Invoiced
27 May 202629 May 2026
CC06249/CC03805 - S34 - Rev 0 - BAC DTBAmendmentS34Rev 00Invoiced
Invoiced
20 May 202622 May 2026
CC03805 - S31 - Rev 0 - Dowells - BAC DTB - AirtrainAmendmentS31Rev 00Invoiced
Invoiced
17 Apr 202619 Apr 2026
CC03805 - S32 - Rev 0 - Dowells - BAC DTB - Pit 5AmendmentS32Rev 00Invoiced
Invoiced
17 Apr 202619 Apr 2026
CC03805 - S15 - Rev 2 - Dowells - BAC DTBAmendmentS15Rev 02Closed
No Charge
31 Mar 20262 Apr 2026
CC03805 - S3 - Rev 2 - Dowells - BAC DTBAmendmentS3Rev 02Invoiced
Invoiced
31 Mar 20262 Apr 2026
CC03805 - S15 - Rev 1 - Dowells - BAC DTBAmendmentS15Rev 01Invoiced
Invoiced
30 Mar 20261 Apr 2026
CC03805 - S30 - Rev 0 - Dowells - BAC DTBAmendmentS30Rev 00Invoiced
Invoiced
2 Mar 20264 Mar 2026
CC03805 - S9 - Rev 2 - Dowells - BAC DTBAmendmentS9Rev 02Closed
No Charge
23 Jan 202625 Jan 2026
CC03805-S22 - Rev 1 - Dowells - Brisbane AirportAmendmentS22Rev 01Closed
No Charge
2 May 20254 May 2025
CC03805 - S4 - R0 - Dowells - Brisbane AirportAmendmentS4Paid
Paid
2 May 20254 May 2025
CC03805 - S23 - R0 - Dowells - Brisbane AirportAmendmentS23Paid
Paid
1 May 20253 May 2025
CC03805 - Dowells - Brisbane AirportAmendmentPaid
Paid
29 Apr 20251 May 2025
CC03805-S19 - Rev 1 - Dowells - BACAmendmentS19Rev 01Paid
Paid
26 Jul 202428 Jul 2024

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 3 Nov 2026, 12:46 pm · Permits · CC03805-S20 - Rev 2 - Dowells - BAC DTB

    1 TGS AMENDMENT INV IV0025721 Invoice IV0025721 - Re barrier removal TGS update .eml

  2. 17 Oct 2026, 4:53 am · P.P · CC03805-S20 - Rev 2 - Dowells - BAC DTB

    @K.R minor amendments to TGS. Basically changed scope of works to barrier removal and removed cranes from TGS. Signage layout stays the same. Sent to client R2

    • 23 Oct 2026, 10:30 am · Riri D.

      @P.P Hi Pat, Minor amendment for this one please mate. When you have time. See comments, they won’t need to make the U Turn down the bottom and would be looking to bring the trucks and semis down from the top road location they have marked up.CC03805-S20-Rev02-TGS- Bribie Way Barrier Removal.pdf

    • 24 Oct 2026, 11:08 am · P.P

      @Riri D. @K.R Minor TGS amendments. Hold & release removed, truck route updated, signage updated to reflect. Rev 03

  3. 16 Oct 2026, 1:11 pm · Permits · CC03805-S20 - Rev 2 - Dowells - BAC DTB

    Hi Pat, They are looking to amend this old TGS, see attached previous TGS we have from setting up cranes on Bribie way. They are looking to see if they can update this TGS to show that we are still closing the road, but are not setting up fixed cranes, they will be putting a Franna down at material handling for the removal of concrete barriers (Clouded). Can we look to remove / include and signs for this set up as required? FW_ barrier removal TGS update .msg CC03805-S20-Rev01-TGS-Brisbane Airport Franna.pdf Thanks Iris (161026)

  4. 1 TGS NEW INV IV0025314 Invoice IV0025314 - Re BAC Domestic airport TGS new one needed..eml

  5. Created this Monday line for invoicing purposes only - Lexi Link: S35- Airside Lane Closure

  6. @K.R non-billable amendment. Removed extra TC from setup. Kept under Rev 00 as amendment was more internal in nature Rev 00

  7. Hi @P.P, Plans folder: Plans - CC03805 Suite: S35- Airside Lane Closure Save work here: TGS > Rev 01 Project location: BAC DTB Quote: none Request type TGS Amendment Hi Patrick, Thanks for getting this over, I double checked with the site team and they don’t need the TC at the entrance of the baggage haul as its part of their works. No need for the TC here, please remove. RE_ BAC Domestic airport TGS new one needed..eml Thanks. Iris (150926)

06Every file and folder

314 files in 123 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved