ONDE - 10-12 Churchill St, Coolangatta - Devloper - Levvel

Rawcorp

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Rawcorp on this project. 1 Monday request is open; the most pressing is at the TMD review stage; the current CTMP on SharePoint is Rev 17; 3 TGS suites on file (S1 Rev 06, S2 Rev 01, S3 Rev 04). On the permit boards: 2 permits in force and 1 in progress. Monday holds 9 requests for this job (1 new, 8 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Rawcorp
Crompton job
CC03845
Location
ONDE - 10-12 Churchill St, Coolangatta - Devloper - Levvel
LGA / authority
—
Project coordinator
—
Latest planner · TMD
J.G · K.G, A.A
Monday project status
—
Deliverables
—
Permits (Monday)
2 in force · 1 in progress
Last activity
17 Nov 2026
Files on SharePoint
688 in 171 folders

What needs attention now

  1. Urgent Needs TMD review: CC03845-S3 - Rev 4 - Rawcorp - Levvel- 10-12 Churchill Coolangatta. Required by 23 Oct 2026 (overdue). TMD: K.G, A.A · Last note (17 Nov 2026, J.G): “Hi @Ethanand @K.G, TGS has been updated with additional amendments, an updated manifest, and the CTMP. Please let me know if any changes are needed. Thank you TGS: Rev 04 CTMP:…”
  2. Permit in progress: Levell – Concrete Pour (Gold Coast) is Initial Pending. Follow up 2 Dec 2026. Wanted from 9 Dec 2026.

PPermits

3 permit lines on the Monday permit boards: 2 in force, 1 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Levell – Concrete Pour
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificIn progress
Initial Pending
9 Dec 2026 – 11 Dec 202611 Nov 20262 Dec 2026
Levell – Medium Impact
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingIn force
Done
12 Oct 2026 – 26 Jan 20271 Oct 202615 Dec 2026
Levell – Operational
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingIn force
Done
28 Oct 2026 – 28 Jan 202712 Oct 202617 Dec 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

9 requests since 13 Dec 2024: 1 for new plans and 8 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC03845-S3 - Rev 4 - Rawcorp - Levvel- 10-12 Churchill Coolangatta UrgentAmendmentS3Rev 04TMD review
TMD Review
21 Oct 202623 Oct 2026J.GK.G, A.A
CC03845-S4 - Rev 2 - Workzone Plan - 10-12 Churchill St - RawcorpCouncil RFIS4Rev 02Invoiced
Invoiced
18 Jun 202620 Jun 2026
CC03845 - S3 - Rev 3 - 10-12 Churchill Street CoolangattaCouncil RFIS3Rev 03Closed
No Charge
16 Dec 202518 Dec 2025
CC03845-S3 - R2 & TMP Rev 15 - Rawcorp - 10-12 Churchill St, CoolangattaCouncil RFIS3Rev 15Closed
No Charge
9 Dec 202511 Dec 2025
CC03845-S1 - Rev 4 - RawCorp - 10-12 Churchill St, CoolangattaCouncil RFIS1Rev 04Invoiced
Invoiced
21 Oct 202523 Oct 2025
CC03845-S3 - Rev 3 - Levvel- 10-12 Churchill Coolangatta (TMP Rev 12)AmendmentS3Rev 03Closed
No Charge
27 Aug 202529 Aug 2025
CC03845 - Levvel- 10-12 Churchill Coolangatta - Work Zone PlanAmendmentInvoiced
Invoiced
6 Feb 202523 May 2025
CC03845 - Levvel- 10-12 Churchill CoolangattaAmendmentClosed
No Charge
21 Jan 202519 Jun 2025
CC03845 - Levvel- 10-12 Churchill CoolangattaNew plansInvoiced
Invoiced
13 Dec 20241 Jan 1970

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • ! Please ensure Duncan is kept across all updated TGS's and TMP !
  • 1. Archive
  • All TC invoices are sent to Rawcorpadmin@rawcorp.com.au
  • Matt Kent (CA)0434 970 634
  • Matt0434970634
  • SM Mick ramseymickr@rawcorp.com.au
  • 1. Invoices only to with Duncan CCdAccounts@rawcorp.com.au
  • Duncan Kay (Contracts Administrator)duncan@rawcorp.com.au
  • Kevin Chen (Contracts Administrator)kevin@rawcorp.com.au
  • Mick Ramsey (Site Manager)0412 205 191
  • Project Manager Ben Dalgleish0415 202 723 · ben@levvel.com.au
  • Ben0415202723
  • Robbie Kowplos (Construction Manager)0439 999 954
  • Robbie0439999954

Crompton Concepts

  • J.GPlanner
  • K.GTMD
  • A.ATMD

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi @Ethanand @K.G, TGS has been updated with additional amendments, an updated manifest, and the CTMP. Please let me know if any changes are needed. Thank you TGS: Rev 04 CTMP: Rev17

  2. Hi @Ethan and @Christopher, This is now for review. Please note that I've not gone through the entire amendment request to save time. @R.R managed to complete the revisions required for the TGS and TMP. She sent me the final documents and just asked me to compile the TMP and its appendices because it is loading really slow on her end. She completed everything before clocking out today. If there are comments or changes needed, please let me know and I'll get to it. Thanks! Accounts: 9xAdd'l TGS (CC03845-S3-TGS-R4-19B to 27B) 1xTMP Amendment (CC03845-CTMP-Rev17) Links: TGS: Rev 04 CTMP: Rev17

    • 12 Nov 2026, 6:04 pm · Riri D.

      @C.R could you please help amend the following * Update the manifest so it accurately reflects all the TGSs. * Update the TGS table so it matches the final TGS numbers and descriptions. * Please amend the TMP to include the use of Porta-booms Please prioritise this as a matter of urgency, as we need to send it back to the client. Thank you! @Ethan Mathews fyi

    • 13 Nov 2026, 8:26 am · C.R

      Hi, @Riri D.. Will do. Can you please let me know if this is urgent or not? As I still have 2 allocations that I am working on and will only get to this after those 2. Thanks.

    • 13 Nov 2026, 10:08 am · Ethan Mathews

      @C.R Hi Cleo, this is very urgent please.

    • 13 Nov 2026, 10:16 am · C.R

      @Ethan Mathews I also have 2 allocations that are pretty urget for Andy and Kerri. Can you please coordinate with them as these are also high prio projects.

    • 13 Nov 2026, 10:17 am · C.R

      @Ethan, Is it possible to have this reallocated to a free planner because I still have ongoing jobs that I need to attend to?

    • 13 Nov 2026, 10:29 am · C.R

      Hi @Riri D. , as advised on Teams, please be mindful with allocations and planner's availability especially for urgent projects. Can we have this reallocated to an available planner as soon as possible? Thanks.

  3. Hi @R.R, can I please have the below to complete for Rawcorp once you're done with the Lylo amendments: Please amend S3 as per the below info from Kelly: "CC03845-S3-10B – All frontages operating together This plan currently shows all frontages operating at the same time. It should be split into separate plans covering the following scenarios: * Miles Street operating on its own* • Hold and release should not be required, unless you see a need for it. * Winston Street operating on its own* • Hold and release in Winston Street only. * • Recommendation: Porta-Booms, due to limited sight lines and the difficulty of manning side streets. * Churchill Street operating on its own* • TCs conducting hold and release in Churchill Street only. This reflects what was happening on the day of the audit. * Recommendation: Porta-Booms, due to limited sight lines and the difficulty of manning side streets. * Churchill and Winston Streets operating concurrently (Miles Street not active)* • Hold and release in Winston and Churchill Streets only. * • Recommendation: Porta-Booms, due to limited sight lines and the difficulty of manning side streets. —————————— CC03845-S3-15B – Lane closures and work zones When I arrived on Friday, there was a lane closure on Winston Street with TCs short-legged into Winston, and a work zone partially active in Churchill Street. While this arrangement is approved in principle under the LONO, we do not currently have a TGS that reflects it. I recommend developing…

    • 22 Oct 2026, 5:50 am · R.R

      Hi @Ethan Mathews , please see progress here: Sharepoint - Documents - WIP - All Documents . I have a few questions about the amendment requirements. Please Teams me when you're available. I'll be online from 10:00 AM (QLD time). Thank you.

    • 23 Oct 2026, 9:16 am · R.R

      Hi @Ethan Mathews Plans and TMP uploaded here. Thanks @C.R for taking over of the rest 🥰 I'll be offline for the rest of the day. Thank you! TGS: Sharepoint - Rev 04 - All Documents TMP: Sharepoint - Rev17 - All Documents

    • 23 Oct 2026, 9:57 am · Ethan Mathews

      Hi @C.R /@R.R just adding below the amendment info below for this request: TGS: CC03845-S3-1B (DELETE) TGS: CC03845-S3-2B (DELETE) TGS: CC03845-S3-3B (DELETE) TGS: CC03845-S3-4B (DELETE) TGS: CC03845-S3-5B (DELETE) TGS: CC03845-S3-6B (DELETE) TGS: CC03845-S3-7B (DELETE) TGS: CC03845-S3-8B (UPDATE): Please amend as below: Please add cones on opposite side of road to remove parking and add a note: Cones/bollards placed on opposite side of Winston St to enforce WHS standards for minimum exclusion zones required when lifting double height panels. Amend to show the workzone dotted yellow lines on all frontages approved in the LONO as per the approved measurements As per site inspection report, a conflict has been identified southbound on Miles St that a long term 40 sign has been installed on approach to a regulatory 50 sign, please adjust accordingly so no conflict in reduction of…

    • 23 Oct 2026, 10:05 am · C.R

      Hi @Ethan, are these the same details relayed to Reina or are these new comments?

    • 3 Nov 2026, 4:55 pm · Ethan Mathews

      @C.R @Riri D. Hi Team, just a heads up that @K.G will be completing some amendments to these TGS's tonight as she is heading to site tomorrow to go through the changes with Site.