Mackay Hospital Stage 2
United Personnel
What's new
- No Monday updates or file changes in the last two weeks.
Crompton Concepts prepares the traffic management for United Personnel on this project. No Monday request is open right now; the latest one closed recently; the current TMP on SharePoint is Rev 07; 1 TGS suite on file (S4 Rev 05). On the permit boards: 1 permit in force and 0 in progress. Every file opens straight from SharePoint.
- Client
- United Personnel
- Crompton job
- CC03887
- Location
- Mackay Hospital Stage 2
- LGA / authority
- —
- Project coordinator
- —
- Latest planner · TMD
- —
- Monday project status
- —
- Deliverables
- —
- Permits (Monday)
- 1 in force · 0 in progress
- Last activity
- 29 Apr 2026
- Files on SharePoint
- 141 in 51 folders
What needs attention now
- Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.
PPermits
1 permit line on the Monday permit boards: 1 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| United/WATPAC – Mackay Base Hospital Expansion Project – Melanie Team Neil · Various Regional Councils - Neil | Regional council | Ongoing | In force Done | 16 Feb 2024 – 30 Apr 2027 | 19 Feb 2024 | 18 Mar 2027 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFTMP-CC03887-REV07-Mackay Base Hospital.pdfTMP Rev 07 · 7 May 2025
- PDFTraffic Management Plan - Update Comments.pdfTMP Rev 07 · 7 May 2025
- PDFTree dropping.pdf4 Sep 2024
- PDFRoad closure sequence Phase 1.pdf4 Sep 2024
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- MSGMark comments Mackay Hospital TGS United changes Urgent23 Jul 2025
- MSGRe_ Mackay Hospital TGS United changes Urgent23 Jul 2025
- MSGMackay Hospital Road Sweep30 Jun 2025
- MSGMackay Hospital TGS update25 Jun 2025
- MSGRe_ Mackay Hospital TGS update25 Jun 2025
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | TMP | Rev 07 | 7 May 2025 | 2 | TMP-CC03887-REV07-Mackay Base Hospital.pdfTraffic Management Plan - Update Comments.pdf |
| General | Swept path | no rev | 3 Jul 2025 | 0 | 240912_STAGE 2_Swept Path Check.pdfCC04613 - SP - Mackay Hospital Swept Path_Diversion - Certified.pdfCC04613 - SP - Mackay Hospital Swept Path_Diversion.pdfCC04613 - SP2 - Mackay Hospital Swept Path_V3 - Certified.pdfStage 2 Setup with Swept Path Check.pdf |
| S4 | TGS | Rev 05 | 25 Jul 2025 | 6 | CC03887-TGS-S4-Rev05-Mackay Base Hospital, West Mackay.pdf |
03Requests on Monday
0 requests since : 0 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- PMmbrady@besixwatpac.com
- PM - Michael Brady0460 921 447
- Project Engineer - Darrian Dempsey0422850131
- Project Engineerddempsey@besixwatpac.com
05Update log
Monday updates and replies on this project's requests, newest first.
No Monday updates on this project's requests since late August.
06Every file and folder
141 files in 51 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|