← All projectsCC04004
Project portal · built 17 Nov 2026, 10:03 am AEST · Review amendments

Kennards Meadowbrook

Total Construction

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Total Construction on this project. 1 Monday request is open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 08; 3 TGS suites on file (General no rev, S1 Rev 11, S2 Rev 01). On the permit boards: 0 permits in force and 1 in progress. Monday holds 3 requests for this job (1 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Total Construction
Crompton job
CC04004
Location
Kennards Meadowbrook
LGA / authority
—
Project coordinator
—
Latest planner · TMD
Janna · Christopher Wright
Monday project status
—
Deliverables
—
Permits (Monday)
0 in force · 1 in progress
Last activity
16 Nov 2026
Files on SharePoint
574 in 174 folders

What needs attention now

  1. Review comments to action: CC04004-S2 - Rev 1 - Total Constructions - Kennards Meadowbrook. Required by 13 Nov 2026 (overdue). Planner: Janna · TMD: Christopher Wright · Last note (16 Nov 2026, S.B): “Hi Janna, Thanks for the update. On 1C the header now shows 50/60/70 km/h, the END ROADWORK plates suit each exit, 1A has TC (Including Breaks): 2, there's a note timing truck…”
  2. Permit in progress: LCC (Road) (Regional council) is FEE PAID. Follow up 13 Nov 2026. Wanted from 15 Oct 2026.

PPermits

1 permit line on the Monday permit boards: 0 in force, 1 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
LCC (Road)
Team Mackenzy · Various Regional Councils - Mackenzy
Regional councilOngoingIn progress
FEE PAID
15 Oct 2026 – 15 Jul 202728 Oct 202613 Nov 20263 Jun 2027

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 087 Jul 20255CC04004-Rev08-CTMP-Kennards Meadowbrook.pdf
—TMPRev 115 Dec 202512CC04004-Rev11-TMP-Kennards Meadowbrook.pdf
—RARev 063 Jun 20246Risk Assessment.pdf
GeneralTGSno rev22 Sep 20250TGS 4B Signage Markup.pdfTGS S1-4B.pdf
GeneralSwept pathno rev4 Nov 20260Kennards Meadowbrook-CROSSOVER SWEPT PATH (3).pdf
S1TGSRev 1117 Nov 202512CC04004-S1-Rev11-TGS-Kennards Meadowbrook.pdf
S2TGSRev 0113 Nov 20262CC04004-S2-TGS-Rev01-KSS Meadowbrook Stage 2.pdf
S2Swept pathRev 0113 Nov 20261Kennards Meadowbrook-CROSSOVER SWEPT PATH.pdf

03Requests on Monday

3 requests since 17 Nov 2025: 1 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC04004-S2 - Rev 1 - Total Constructions - Kennards MeadowbrookAmendmentS2Rev 01Review amendments
Working on it
11 Nov 202613 Nov 2026JannaChristopher Wright
CC04004 - S2 - Total Constructions - Kennards MeadowbrookNew plansS2Invoiced
Invoiced
29 Sep 20261 Oct 2026
CC04004-S1 - Rev 11 - Total Constructions - Kennards MeadowbrookEmergency / safetyS1Rev 11Invoiced
Invoiced
17 Nov 202519 Nov 2025

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • !! Archive and Updates !!
  • CA - Chris​​​​ Faure‑Field0435 069 478
  • CAcfaure@totalconstruction.com.au
  • !!! invoicesclaims@totalconstruction.com.au
  • Casey AgnewCaseyA@totalconstruction.com.au
  • PM - Tim​​​​ Witham0422 554 160
  • PMtimw@totalconstruction.com.au

Crompton Concepts

  • JannaPlanner
  • Christopher WrightTMD

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi Janna, Thanks for the update. On 1C the header now shows 50/60/70 km/h, the END ROADWORK plates suit each exit, 1A has TC (Including Breaks): 2, there's a note timing truck exits to the red signal, a "no H&R during nominated peak periods" note, and the TC managing pedestrians during truck entry/exit. The swept path is now in the CTMP as Appendix C. The main council questions still aren't answered, though, and the CTMP still contradicts the TGS: 1. Layout direction (Mackenzy's comment, 11/11) * Mackenzy asked for the inset fence arrangement as the main access, with H&R only as a fallback. 1C still shows H&R as the site-active setup and doesn't show the inset fence line. Suggest 1C = inset fence / drive-in drive-out (no holding), and a separate alternative sheet (e.g. 1D) = H&R, off-peak only. That way council sees we're trying to avoid holding traffic. 2. Council's swept path request (not answered yet) * Appendix C is still TC-ER-MD-01 Rev A (03/11), the existing-crossover check with no power poles, gully pit or repositioned fence. Council specifically asked for a swept path supporting the fence repositioning with that infrastructure shown. Please get the updated version(s) from Mackenzy / the swept path team and reference the drawing number on 1C. 3. Queue / hold times (not answered yet) * 0B Traffic Impact Assessment is blank, and 1C now shows a single "44 m Queue Length" (it was 70 m / 75 m in the earlier version) with no calc behind it. Please add: the council traffic…

  2. hi @S.B Kindly check the folder Rev 01 for CC04004-S2 - Rev 1 - Total Constructions - Kennards Meadowbrook Please reach out if there is additional info needed. Thanks! 1 x TGS Amendment (1C & 2C) 1 x TMP Amendment (Swept Path)

  3. Hi Janna, Thanks for turning this around so fast. The H&R layout on 1C is clear: both approaches have advance warning, a PREPARE TO STOP / STOP HERE WHEN DIRECTED sequence and queue-length callouts. The revision history on 0A ("Hold and Release for the Truck Turning", Rev 1, 11/11/2026) and the updated design date are good too. The aftercare (2C) is rightly left alone. Before this goes back to council there are a few things to tidy, most of them coming straight from what council asked for: 1. Council's queue/hold-time request isn't answered yet * Council specifically asked us to review hold times and queue lengths against their traffic counts because of queueing back to the signalised intersection. 1C shows "70 m Queue Length" and "75 m Queue Length", but I can't see where those come from, and I couldn't find the traffic counts in the folder or on monday. Can you get the counts from Riri or the client and add a short queue calc to the plan or the TMP: peak and off-peak volume, max hold time (e.g. per truck movement) and resulting queue? Please also show the distance from the hold points to the signalised intersection so council can see the queue doesn't reach it. * Add a note on 1C covering the peak-hour position the client accepted: H&R not to operate during the nominated peak periods (insert the times once council confirms), with trucks reverting to the Stage 1 crossover access during those times, and a max hold time for the TC. This is what's most likely to get it…

  4. Amendments needed to CC04004 - S2 - Total Constructions - Kennards Meadowbrook Would need this be the latest Friday * In regards to the boundary fence being repositioned to allow a better turning circle for trucks, Council has concerns regarding the existing infrastructure (ie power poles and gully pit) and the ability for the trucks to negotiate movements. Council requests a swept path analysis be provided supporting any proposals. * The hold and release raises concerns with traffic queueing back to the signalised intersection. Please see attached traffic counts for the Traffic Management Designer to review hold times and queue lengths. Consideration should be taken on direction of holds to enable truck ingress and egress whilst having minimal impacts on the surrounding road network. It should be noted hold and release may be restricted to outside of peak times. We can accept this maybe limited during peak times however we have good understanding of these times from our time constructing stage 1 . If this is key to the approval, we can revert to stage 1 cross over access during the nominated peak times. Our majority of works is conducted between 6am and 1pm however we are confident that the inset fence strategy allows us to immediately allow traffic to pull up off the road and not cause queuing. There is also ample space off the road once inside site so again we don’t believe this to be a problem, even in peak times Plans folder: Plans CC04004 Suite: S2 Save work here: TGS…

    • 11 Nov 2026, 2:24 pm · Janna

      hi team, Kindly check the folder for CC04004-S2 - Rev 1 - Total Constructions - Kennards Meadowbrook Please reach out if there is additional info needed. Thanks! 1 x TGS Amendment for additional Hold and Release for the Truck Turning hi @Mackenzy Moller can i ask for the assistance of sweptpath for this one thanks!

    • 12 Nov 2026, 8:56 am · Mackenzy Moller

      @Janna Please reach out to Sanju for the swept path But the TGS you have provided is not at all what is required, once you speak with Sanju the Fence needs to be moved etc, please re read the below ( hold & release needs to be an option we want to try and avoid it but need to have a TGS to show it ) * In regards to the boundary fence being repositioned to allow a better turning circle for trucks, Council has concerns regarding the existing infrastructure (ie power poles and gully pit) and the ability for the trucks to negotiate movements. Council requests a swept path analysis be provided supporting any proposals. Reviewing this onsite today I don’t believe there will be a problem with turning circles with the inset fence suggested. Please draft up a couple of versions of sweep paths considering this. * The hold and release raises concerns with traffic queueing back to the signalised…

  5. IV0025496 (071026) 2xTGS 1xTMP 1xRA Invoice IV0025496 - CC04004 - LCC - Total Constructions - Kennards Meadowbrook (Road).eml

  6. 6 Oct 2026, 2:22 pm · Mackenzy Moller · CC04004 - S2 - Total Constructions - Kennards Meadowbrook

    @KB.R Could you please fix the amendments from the client - if this could be done as soon as possible that would be amazing @Riri D.

    • 6 Oct 2026, 2:47 pm · KB.R

      Hi @Mackenzy Moller, I've uploaded the amended TGS and TMP following client's comments. Thanks.

    • 7 Oct 2026, 7:50 am · Christopher Wright

      This is GTG.

  7. 1 Oct 2026, 12:10 pm · Mackenzy Moller · CC04004 - S2 - Total Constructions - Kennards Meadowbrook

    @Sandy Just a heads up Client needs this by Tuesday next week at the latest, can we make sure it is ready to go then please 😄

  8. Hi @A.A @Mackenzy Moller, For CC04004 - S2 - Total Constructions - Kennards Meadowbrook, I've completed the plans as described. As per Mackenzy, this is treated basically as new plans, and as per quote, a minor TMP is required for this. Hence, I've created an S2 TMP for this one, in which I've created a folder on SharePoint. Accounts: 2xTGS 1xTMP 1xRA Link: TGS: Rev 00 TMP: Rev00 It is now available for review. Thank you!

  9. Hi Plans folder: Plans CC04004 Suite: S2 Save work here: TGS > TGS > Rev 00 Project location: Kennards Meadowbrook Quote: QU-5666 Request type: New Scope: TGS Specific operations: TGS to amend: TGS number Client mark-ups/attachments: Any specific files the planner needs to refer to? Site MobPlan.pdfRE_ TMP - KSS Meadowbrook Stage 2 .eml Quote QU5666.pdf

    • 29 Sep 2026, 2:31 pm · Riri D.

      @KB.R please teams @Mackenzy he would like to go over things prior

    • 29 Sep 2026, 2:42 pm · KB.R

      @Riri D. Dropped her a message. Thanks, @Riri D.

    • 30 Sep 2026, 9:40 am · Mackenzy Moller

      @Riri D. For this Project could i have a new folder created under Total Construction - Kennard Meadowbrook Stage 2 ( i would like to keep the projects sperate)

    • 2 Oct 2026, 12:36 pm · Christopher Wright

      This is GTG

06Every file and folder

574 files in 174 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved