Project portal · built 17 Nov 2026, 10:03 am AEST · TMD review

NEXTDC B2 - Constance St, Valley

Multiplex

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Multiplex on this project at Constance Street, Fortitude Valley, QLD. 7 Monday requests are open; the most pressing is at the TMD review stage; the current CTMP on SharePoint is Rev 15; 6 TGS suites on file (General no rev, S3 Rev 15, S4 Rev 02, S5 Rev 09…). On the permit boards: 0 permits in force and 6 in progress. Monday holds 47 requests for this job (4 new, 43 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Multiplex
Crompton job
CC05249
Location
Constance Street, Fortitude Valley, QLD
LGA / authority
City of Brisbane
Project coordinator
C.C
Latest planner · TMD
Janna · S.B
Monday project status
Amendment Approved
Deliverables
Council Road Permit, Engineering (RPEQ), Engineering Design, Footpath Permit, Noise Management Plan, Out of Hours Permit, Police Permit, RA, Site Visit, Swept Path, TGS, TA, TMP, Workzone Permit, Traffic Counts
Permits (Monday)
0 in force · 6 in progress
Last activity
17 Nov 2026
Files on SharePoint
1,561 in 424 folders

What needs attention now

  1. Needs TMD review: CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley. Required by 14 Nov 2026 (overdue). TMD: S.B · Last note (16 Nov 2026, S.B): “Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS:…”
  2. Needs TMD review: CC05249-NMP - Rev 10 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation). Required by 18 Nov 2026. TMD: S.B · Last note (16 Nov 2026, S.B): “Hi Janna, Thanks for the quick turnaround. The contingency note (11–14 December 2026, 6:30 AM – 6:30 PM and 6:30 PM – 6:30 AM) is in Section 2.2. I've been through the Rev 10 PDF…”
  3. Review comments to action: CC05249-NMP - Rev 9 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation). Required by 13 Nov 2026 (overdue). Planner: Leo Escoton · TMD: Christopher Wright · Last note (12 Nov 2026, S.B): “Hi Leo, Thanks for turning this around quickly. The main change has been carried through well. The overview, hours block and Scheduled Dates table now show Monday 7 to Thursday 10…”
  4. TMD approved, ready to issue: CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley. Required by 4 Nov 2026 (overdue). TMD: S.B · Last note (12 Nov 2026, S.B): “Hi Janna, * 20B (site inactive). Still showing "Generator 3: R29000 / Generator 2: R22500 / Generator 1: R21000 / Crane Pick-up and Slew Radius" (twice), "EXTRACT: WORK AREA", and…”
  5. Issued, waiting on client: CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle). Required by 30 Oct 2026. Planner: Leo Escoton · TMD: Christopher Wright · Last note (30 Oct 2026, Riri D.): “CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle) Aisha Waver Client review no charged as per Aisha”
  6. Issued, waiting on client: CC05249-NMP - Rev 7 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation). Required by 30 Oct 2026. Planner: Leo Escoton · TMD: Christopher Wright · Last note (30 Oct 2026, Leo Escoton): “Hi @Christopher Wright and @Riri D., for review Link: NMP Accounts: 1x NMP - Amended, added Tower Crane Installation on the NMP 1x Letter to Council 1x Letter to Residents Thank…”
  7. Issued, waiting on client: CC05249-NMP - Rev 8 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation). Required by 4 Nov 2026. Planner: Leo Escoton · TMD: Christopher Wright · Last note (2 Nov 2026, Leo Escoton): “Hi @Aisha Waver and @Riri D., for review. Link: Sharepoint - Documents - Rev 08 - All Documents Accounts: 1x NMP - Work Schedule changed (Mon - Day 1 so on..); Remove Tower Crane…”
  8. Permit in progress: OOH: Generator Installation (BCC road) is Amendment Requested. Wanted from 21 Sep 2026.
  9. Permit in progress: Footpath: Generator Installation (Footpath) is FEE PAID. Follow up 18 Nov 2026. Wanted from 20 Nov 2026.
  10. Permit in progress: Road: Daily Arrangement (BCC road) is Council Pending. Follow up 25 Nov 2026. Wanted from 10 Dec 2026.
  11. Permit in progress: Road: Tower Crane Dismantle (BCC road) is Initial Pending. Follow up 4 Dec 2026. Wanted from 20 Feb 2027.
  12. Permit in progress: OOH: Generator Installation + Tower Crane Dismantle (BCC road) is Initial Pending. Follow up 27 Nov 2026. Wanted from 30 Nov 2026.
  13. Permit in progress: Constance St - Footpath: Daily Arrangement (Footpath) is Council Pending. Follow up 28 Nov 2026. Wanted from 1 Jan 2027.

PPermits

8 permit lines on the Monday permit boards: 0 in force, 6 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
OOH: Generator Installation
Team Aisha · BCC Road Permits - Aisha
BCC roadDate SpecificIn progress
Amendment Requested
21 Sep 2026 – 27 Nov 202614 Sep 2026
Footpath: Generator Installation
Team Aisha · BCC Footpath Applications - Aisha
FootpathDate SpecificIn progress
FEE PAID
20 Nov 2026 – 15 Dec 202627 Aug 202618 Nov 202616 Oct 2026
Road: Daily Arrangement
Team Aisha · BCC Road Permits - Aisha
BCC roadOngoingIn progress
Council Pending
10 Dec 2026 – 10 Jan 202723 Oct 202625 Nov 202625 Nov 2026
Road: Tower Crane Dismantle
Team Aisha · BCC Road Permits - Aisha
BCC roadDate SpecificIn progress
Initial Pending
20 Feb 2027 – 21 Feb 202729 Sep 20264 Dec 2026
OOH: Generator Installation + Tower Crane Dismantle
Team Aisha · BCC Road Permits - Aisha
BCC roadOngoingIn progress
Initial Pending
30 Nov 2026 – 21 Mar 20274 Nov 202627 Nov 20267 Feb 2027
Constance St - Footpath: Daily Arrangement
Team Aisha · BCC Footpath Applications - Aisha
FootpathOngoingIn progress
Council Pending
1 Jan 2027 – 21 Mar 20277 Nov 202628 Nov 20267 Feb 2027
Full Road Closure :Generator Installation + Loading Dock
Team Aisha · BCC Road Permits - Aisha
BCC roadDate SpecificApproved, starts later
Done
7 Dec 2026 – 10 Dec 202611 Nov 2026
OOH: Multiple Activities
Team Aisha · BCC Road Permits - Aisha
BCC roadOngoingClosed
Waiting for Refund
11 May 2026 – 24 May 20265 Nov 2025

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 1517 Dec 202516CC05249-CTMP-R14.pdf
—TMPRev 1417 Dec 202515Barrier Design.pdfCC05249-TMP-R13.pdfCC05249-TMP-R14.pdf
—NMPRev 1016 Nov 202611Noise Management Plan - OOH Works - Rev 10.pdf
—RARev 1416 Dec 202511CC05249-RA.pdf
—Letter to residentsRev 072 Nov 20262CC05249 - Letter to Residents.pdf
GeneralTGSno rev27 Feb 20260CC05249 - S2 - NEXTDC - TGS.pdfCC05249-S3+S5-TGS.pdf
GeneralSwept pathno rev3 Aug 20260Constance St-Swept Path.pdfMULTIPLEX-CONSTANCE ST-GENERATOR INSTALLATION SWEPT PATH.pdfMisterton St Swept Paths.pdf
GeneralWorkzone planno rev3 Jun 20250WORKZONE.pdfWORKZONE_2.pdf
S3TGSRev 1517 Dec 202516CC05249-S3-1B - New TGS Constance Street Temporary Closure.pdfCC05249-S3-TGS-R15.pdf
S4TGSRev 0215 May 20253CC05249-TGS-S4-R2-Concept Plans.pdf
S5TGSRev 0927 Jan 202610CC05249-TGS-S5-R9.pdf
S6TGSRev 0318 Jul 20254CC05249-TGS-S6-R3.pdf
S8TGSRev 0616 Nov 20267CC05249-S8-TGS-R6.pdf
S8Swept pathRev 033 Aug 20262Constance St-Swept Path.pdf

03Requests on Monday

47 requests since 20 Nov 2024: 4 for new plans and 43 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC05249-NMP - Rev 10 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)AmendmentNMPRev 10TMD review
TMD Review
16 Nov 202618 Nov 2026JannaS.B
CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS8Rev 05TMD review
TMD Review
12 Nov 202614 Nov 2026John Paul EbarsabalS.B
CC05249-NMP - Rev 9 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)AmendmentNMPRev 09Review amendments
Working on it
11 Nov 202613 Nov 2026Leo EscotonChristopher Wright
CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS8Rev 04TMD approved
TMD Approved
2 Nov 20264 Nov 2026S.B
CC05249-NMP - Rev 8 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)AmendmentNMPRev 08With client
Client review
2 Nov 20264 Nov 2026Leo EscotonChristopher Wright
CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle)AmendmentNMPWith client
Client review
28 Oct 202630 Oct 2026Leo EscotonChristopher Wright
CC05249-NMP - Rev 7 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)AmendmentNMPRev 07With client
Client review
28 Oct 202630 Oct 2026Leo EscotonChristopher Wright
CC05249-NMP - Rev 6 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)AmendmentNMPRev 06Closed
No Charge
15 Oct 202617 Oct 2026
CC05249-NMP - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)AmendmentNMPRev 05Closed
No Charge
7 Oct 20269 Oct 2026
CC05249-NMP - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation) UrgentAmendmentNMPRev 04Closed
No Charge
29 Sep 20261 Oct 2026
CC05249-NMP - Rev 3 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)AmendmentNMPRev 03Closed
No Charge
11 Sep 202613 Sep 2026
CC05249-S8 - Rev 3 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS8Rev 03Invoiced
Invoiced
30 Jul 20261 Aug 2026
CC05249-S8 - Rev 2 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS8Rev 02Invoiced
Invoiced
17 Jul 202619 Jul 2026
CC05249-S8 - Rev 1 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS8Rev 01Invoiced
Invoiced
1 Jul 20263 Jul 2026
CC05249-NMP - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentNMPInvoiced
Invoiced
26 Mar 202628 Mar 2026
CC05249-S8 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS8Closed
No Charge
27 Feb 20261 Mar 2026
CC05249 - S5 - Rev 9 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS5Rev 09Invoiced
Invoiced
23 Jan 202625 Jan 2026
CC05249-S3 - Rev 15 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS3Rev 15Invoiced
Invoiced
15 Dec 202517 Dec 2025
CC05249- S3 + S5 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Version 2)AmendmentS3Invoiced
Invoiced
1 Dec 20253 Dec 2025
CC05249- S3 + S5 - Multiplex - NEXTDC - Constance St, Fortitude ValleyCouncil RFIS3Invoiced
Invoiced
25 Nov 202527 Nov 2025
CC05249-S3 - Rev 12 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS3Rev 12Invoiced
Invoiced
20 Nov 202522 Nov 2025
CC05249-S5 - Rev 6 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS5Rev 06Invoiced
Invoiced
30 Oct 20251 Nov 2025
CC05249-S3 - Rev 11 - NEXTDC - Constance St, Fortitude ValleyAmendmentS3Rev 11Invoiced
Invoiced
22 Oct 202524 Oct 2025
CC05249-S5 - Rev 5 - NEXTDC - Constance St, Fortitude ValleyAmendmentS5Rev 05Invoiced
Invoiced
22 Oct 202524 Oct 2025
CC05249-NMP - Rev 2 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentNMPRev 02Invoiced
Invoiced
28 Aug 202530 Aug 2025
CC05249-S5 - Rev 3 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS5Rev 03Invoiced
Invoiced
18 Aug 202520 Aug 2025
CC05249-S3 - Rev 9 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS3Rev 09Invoiced
Invoiced
4 Aug 20256 Aug 2025
CC05249-S5 - Rev 1 - NEXTDC - Constance St, Fortitude ValleyAmendmentS5Rev 01Closed
No Charge
30 Jul 20251 Aug 2025
CC05249-S6 - Rev 3 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS6Rev 03Invoiced
Invoiced
11 Jul 202513 Jul 2025
CC05249-S3 - Rev 8 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS3Rev 08Invoiced
Invoiced
1 Jul 20253 Jul 2025
CC05249-S6 - Rev 2 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS6Rev 02Invoiced
Invoiced
24 Jun 202525 Jun 2025
CC05249-S6 - Rev 1 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS6Rev 01Invoiced
Invoiced
19 Jun 202521 Jun 2025
CC05249-S3 - Rev 7 - Multiplex - NEXTDC - Constance St, Fortitude ValleyNew plansS3Rev 07Invoiced
Invoiced
18 Jun 202520 Jun 2025
CC05249-S5 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS5Invoiced
Invoiced
17 Jun 202519 Jun 2025
CC05249-S6 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS6Invoiced
Invoiced
16 Jun 202518 Jun 2025
CC05249-S5 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS5Invoiced
Invoiced
27 May 202529 May 2025
CC05249-S3 - Rev 6 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS3Rev 06Invoiced
Invoiced
23 May 202525 May 2025
CC05249-S3 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS3Rev 05Invoiced
Invoiced
20 May 202522 May 2025
CC05249 - Multiplex - NEXTDC - Constance St, Fortitude ValleyNew plansClosed
No Charge
30 Apr 20252 May 2025
CC05249 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentClosed
No Charge
17 Apr 202519 Apr 2025
CC05249-S4 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS4Invoiced
Invoiced
11 Apr 202513 Apr 2025
CC05249 - Multiplex - NEXTDC - Constance St, Fortitude Valley - R4AmendmentClosed
No Charge
27 Mar 202529 Mar 2025
CC05249 - Priority 2 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentInvoiced
Invoiced
18 Mar 202520 Mar 2025
CC05249-S3 - Rev 2 - Multiplex - NEXTDC - Constance St, Fortitude ValleyAmendmentS3Rev 02Invoiced
Invoiced
20 Feb 202522 Feb 2025
CC05249 - Multiplex - NEXTDC - Constance St, Fortitude ValleyClient review amendmentClosed
No Charge
16 Dec 202418 Dec 2024
CC05249-S3 - Multiplex - NEXTDC - Constance St, Fortitude ValleyNew plansS3Paid
Paid
9 Dec 202413 Dec 2024
CC05249 - Multiplex - NEXTDC - Constance St, Fortitude ValleyNew plansClosed
No charge
20 Nov 202420 Nov 2024

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • PM0400771988 · cameron.boyd@multiplex.global
  • Proj Eng0439948945 · konrad.wosny@multiplex.global
  • SiteEng0497898387 · Kaveh.batmani@multiplex.global
  • !!! INVOICING !!! Include docs when invoicing
  • !!! Invoice to Multiples Construction Pty Ltd !!!
  • !!! Invoice to Multiples Constructions Pty Ltd !!!
  • !!! Invoices - !!NEXTDCB2.Accounts@multiplex.global
  • Archive
  • Amy StedallAmy.Stedall@multiplex.global
  • CAMarco.fuentes@multiplex.global
  • Marcos HigashiMarcos.Higashi@multiplex.global
  • NEW CA Rachel Doherty0429 981 803
  • 0429 981 8030429 981 803
  • Rachel.Doherty@multiplex.globalRachel.Doherty@multiplex.global
  • SE - Marcos HigashiMarcos.Higashi@multiplex.global
  • SE Marcos HigashiMarcos.Higashi@multiplex.global
  • SM - Mark WieseMark.Wiese@multiplex.global
  • Construction Manager George Haddad0477 624 169
  • George Haddadgeorge.haddad@multiplex.global
  • Kamil SierantKamil.Sierant@multiplex.global
  • Project Engr. Kamil Sierant - 439 948 945
  • Project Engr. Kamil SierantKamil.Sierant@multiplex.global
  • Project Engr. Konrad Wosny0439 948 945
  • SM Mark Wiese0437 210 887

Crompton Concepts

  • JannaPlanner
  • S.BTMD
  • John Paul EbarsabalPlanner
  • Leo EscotonPlanner
  • Christopher WrightTMD
  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS: Rev 06 Additional Still no amended on CTMP just only TGS.

  2. Hi Janna, Thanks for the quick turnaround. The contingency note (11–14 December 2026, 6:30 AM – 6:30 PM and 6:30 PM – 6:30 AM) is in Section 2.2. I've been through the Rev 10 PDF and there are a few things to tidy before it goes to Multiplex / BCC: 1. The request isn't fully covered yet * The second half of Rosan's instruction is missing. Please add something like: "Should inclement weather affect the approved days, the Temporary Road Closures team (BCC) has agreed that the Road Closure Certificate will be updated accordingly to the contingency dates." * The Scheduled Dates table only shows 07/12 – 10/12 "Approved Permit". Please add a row: Generator installation – Constance St – Day/Night – 11/12/2026 (Fri) to 14/12/2026 (Mon) – Contingency (weather). * Hours of Work (2.2) still says Monday to Thursday only. The contingency runs Friday to Monday, including a weekend, so please update the hours to cover it. The OOH approval and resident notification will need to cover those nights too. 2. Conflicting old note * Straight after the new note there's an old one: "Monday to be contingency day should generator installation not be finalised over the weekend establishment…". This is from the earlier weekend schedule and contradicts both the Mon–Thu programme and the new 11–14 Dec contingency. Please delete it. 3. Word markup is printing in the PDF * Page 4 shows "Formatted: Body Text, Justified, Space Before: 6 pt…" and "Formatted: Check spelling and grammar". These are…

    • 16 Nov 2026, 4:09 pm · Janna

      Hi Sanju, Updated already Thanks,

  3. Hi John Paul, Thanks for the quick Rev 6, and for stepping it to a new revision. Good progress: the "Traffic controllers to alert vehicles after hours" line is gone from 20A, 19A now reads "Trucks reverse into Costin St and exit forward onto Water St; TC to hold and release traffic during each movement", 20B now has the Stabilised-Sand Setup and 25 m dimension from 18B, the 20B legend is cleaned up, and all title blocks are on Rev 6 dated 16/11. A few things are still open: 1. 20B still doesn't match 18B (Riri's note) * 20B still has STOP HERE WHEN DIRECTED (3) and 9 PREPARE TO STOP signs, which is the same as 19C. 18B has no STOP HERE signs and only 3 PREPARE TO STOP. Please delete the extra TC signs from 20B so the sign layout is the same as 18B. * The 20A manifest still lists "2 x Multi Message (TC1257 Traffic Controller Symbolic, TC1173 Prepare To Stop, TC1174 Do Not Overtake)" and "1 x Multi Message (TM1-35C Stop here when directed…)". Once 20B is fixed, please regenerate the 20A manifest so no TC signs go out for the unattended site. * 20B also has "Saturday to Monday Road and footpath closure" (from 19B). If the closure does stay in place over the weekend, that's fine, but please confirm it's meant to be on the inactive sheet. 2. 40 km/h after hours (still open) * REDUCE SPEED 40 is still on 18B and 20B, and the 18A and 20A manifests still include "TC1828 Truck Symbolic, TC1174 Do Not Overtake, TC1217 (40) Speed 40". The only reasoning on 18A/20A is "40 km/hr speed…

  4. Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS: Rev 06 Additional Regarding on the CTMP, we don't know if they need amend also.

    • 16 Nov 2026, 11:17 am · John Paul Ebarsabal

      Good day, Hi @Aisha Waver and @S.B , TGS is already updated now. Thank you.

    • 16 Nov 2026, 12:10 pm · Aisha Waver

      @S.B is this good to go? :)

  5. Plans folder: Plans - CC05249 Suite: NMP Save work here: Generator Installation > Rev 10 Project location: NEXTDC B2 - Constance St, Valley Quote: none Job request form: none Request type: Amendment Scope: NMP We need to make a condition in there for the Generator installation contingency dates - Contingency dates are 11/12-14/12, The Temporary Road Closures Team (Deborah Burden) has agreed that should inclement weather affect the approved days the Road Closure Certificate will be updated accordingly.

    • 16 Nov 2026, 1:38 pm · Janna

      Hi @Riri D. Done with this one. Thank you!

  6. Hi John Paul, Thanks for turning this around so quickly. Most of the list is closed out now. The reviewer initials are R.R on every sheet, 17B only reads "JOINS 17C", 18A no longer mentions traffic controllers after hours, the 20A risk table and bus stop table are fixed (no more "Enter Reasoning"), the loose line on 19B is gone, 20B is titled "Site Inactive", its legend no longer has the concrete pump, generators or work area, and the "Bays remain closed during the install period" note is a nice touch. A few things left: 1. 20B / 20A: TC signs on the inactive setup (Riri's note) * The 20B text still has STOP HERE WHEN DIRECTED (3) and several PREPARE TO STOP signs. Riri asked for 20B to match 18B exactly, and 18B has no STOP HERE signs. Please delete them from 20B rather than covering them. * The 20A manifest still lists "2 x Multi Message (TC1257 Traffic Controller Symbolic, TC1173 Prepare To Stop, TC1174 Do Not Overtake)" and "1 x Multi Message (TM1-35C Stop here when directed…)", plus "TC1828 Truck Symbolic … Speed 40". Please regenerate the 20A manifest from the final 20B so nothing TC-related goes out for the unattended site. * The 18B closure point has "Stabilised-Sand Setup" and a 25 m dimension that I can't find on 20B. Please check that the closure points on 20B are identical to 18B. 2. 20A reasoning (new) * 20A now reads "Work vehicles and equipment will occupy the road; detours to be provided. Traffic controllers to alert vehicles after hours." That line came off…

  7. Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS

  8. Hi John Paul, Thanks for the quick turnaround on Rev 5. Good progress: the 19B notes now show the 2 + 6 car parks taken out for the 3 days of the generator install, 20B no longer has the queue lengths, crane/generator radii or TC notes, the risk tables on 17A, 18A and 19A now say the road closure and detour are anticipated, and the title blocks are all on Rev 5 dated 13/11. A few things still need fixing before this goes back to Multiplex: 1. 20B to match 18B (Riri's note) * 20B still shows STOP HERE WHEN DIRECTED (6) and PREPARE TO STOP signs. 18B has no STOP HERE signs. As the site is unattended, please remove them from 20B rather than just covering them, so the closure matches 18B. * The 20A manifest still lists "2 x Multi Message (TC1257 Traffic Controller Symbolic, TC1173 Prepare To Stop, TC1174 Do Not Overtake)" and "1 x Multi Message (TM1-35C Stop here when directed…)". Please regenerate the 20A manifest from 20B so no TC signs go out for the inactive setup. * 18B shows a "Stabilised-Sand Setup" closure point and a 25 m dimension that I can't find on 20B. Please check the closure points are identical. * 20B legend still has Concrete Pump, Roof Generators 80T, Exclusion Zone and Work Zone, plus "EXTRACT: WORK AREA". Please drop anything not drawn on the inactive sheet. * 20B still has REDUCE SPEED 40 (twice). With no workers on site, either justify keeping 40 overnight on 20A or remove/cover it. * Title typo: "Site In Active" should be "Site Inactive". 2. 19B car park…

    • 13 Nov 2026, 5:02 pm · John Paul Ebarsabal

      Updated already mate.

  9. Hi @Aisha Waver , TGS is already updated with the same folder on Rev 05. Thank you.

    • 13 Nov 2026, 1:56 pm · Aisha Waver

      @S.B please review

  10. Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS

  11. Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * Rev 05 - TGS

  12. can we please get a TGS amendment - CC05249-S8-19B for multiplex constance. We need to exclude the carparks on the generator install. CC05249-S8-TGS-R4.pdf Plans folder: Plans - CC05249 Suite: S8 New Main Works Save work here: TGS > Rev 05 Project location: NEXTDC B2 - Constance St, Valley Quote: none Job request form: none Request type: Amendment Scope: TGS

    • 13 Nov 2026, 11:26 am · Riri D.

      @John Paul as discussed on teams, please amend TGS CC05249-S8-20B closures back to the way it was before exactly like TGS CC05249-S8-18B

  13. Hi Leo, Thanks for turning this around quickly. The main change has been carried through well. The overview, hours block and Scheduled Dates table now show Monday 7 to Thursday 10 December 2026 against the approved permit. The three old date ranges and contingency weekends are gone from the table, and the issue date is updated to 11/11/2026. A few leftovers from Rev 08 still need cleaning up, and the notification letters weren't updated. Most important first: 1. Letters to Residents and Councillor (Rev 09 folder): not updated * Both letters are still dated 28 October 2026. They still say "Generator Installation on 30 November to 4 December 2026, with contingency works from 7 December to 14 December 2026". Please change this to 7–10 December 2026, with no contingency, to match the NMP and RC-14993-4. * Both letters show "Tower Crane Installation on 5 to 6 December 2026, with a contingency weekend on 12 to 13 December". The NMP now has a Tower Crane Dismantle on 20/02/2027 with four contingency weekends. Please confirm with Riri whether the tower crane should be in this letter at all. If it stays, the activity name and dates must match the NMP. * Both letters have copy-paste text from another job. "Police, Fire or Ambulance are required to attend a property on Coronation Drive" should be Constance Street. The Residents letter also has a "HUTCHINSON BUILDERS" footer, which needs to come out. * Also: "Multiplex wish to all residents" is missing a word (should be "wish to advise…

  14. Hi Janna, * 20B (site inactive). Still showing "Generator 3: R29000 / Generator 2: R22500 / Generator 1: R21000 / Crane Pick-up and Slew Radius" (twice), "EXTRACT: WORK AREA", and Work Area / Crane Base / Concrete Pump / Roof Generators 80T in the legend. Please take these off. It also still has STOP HERE WHEN DIRECTED (6) and PREPARE TO STOP. With no TC on site after hours, please remove these, or if they're meant to stay up covered, make sure each one is clearly drawn and labelled as covered (same for the 40 and DO NOT OVERTAKE signs). * 20A manifest and reasoning. The manifest still lists TC1257 Traffic Controller Symbolic (2 + 2 + 1) and 3 x TM1-35C Stop here when directed. Please regenerate it from 20B as drawn. The selected option reasoning on 20A says "Traffic controllers are to hold and release when trucks are reversing onto site", which is the 19A wording. Please reword it for the site-inactive setup (no TC, static closure and detour only). * 18A risk table still says "1. No closure / detour anticipated during construction." Please match 19A/20A, and check 17A as well. * 17B still reads "JOINS 3C". Please delete it (17C is the right one). * Revision block. R.D is still 04/11/2026 on every sheet while the design date is 11/11/2026. Please update the Rev 4 date/description to cover this round. * CTMP:* Table 1: please add a Rev 4 "Revised By" row (last one is 31/07). * Table 2 still lists "CC05249 - S5 - CTMP - R0" to R4. Should be S8. * Table 4 change log stops at…

    • 12 Nov 2026, 11:40 am · Janna

      Hi @S.B I have updated the file accordingly based on the provided comments. Kindly refer to the folder link below. Rev 04 Thanks,

  15. Hi @Christopher Wright and @Riri D., for review. Link: Sharepoint - Documents - Rev 09 - All Documents Accounts: 1x NMP - NMP updated to reflect the approved road permit dates for the Generator Installation works from 7–10 December 2026. Thank you!

    • 11 Nov 2026, 3:01 pm · Aisha Waver

      @S.B can you please review :)

  16. Hi Rudra, * 19B/19C swept path. Following my reply above, please use Constance St-Swept Path.pdf (MP-CS-FV-01 Rev A, 03/08/2026) in the RPEQ / Generator Installation Swept Path folder. Please don't use the July Options 1-3 set or the path currently in the CTMP. On 19B/19C:* Trace the forward legs in the forward colour and the reverse leg in the reverse colour, exactly as the RPEQ sheet shows them (entry from Costin St, reverse, exit via Baxter St / Water St). * Put a TC at every H&R point on that sheet: the reversing manoeuvre and the AV left turn where it uses the opposing lane. * The RPEQ sheet notes the path encroaches the car park and the existing parking bays need to be removed or relocated. Please show those bays as closed on 19B/19C. * Replace CTMP Appendix I with this same sheet, so the TGS and CTMP match. * 20B (site inactive). With no TC on site after hours, please remove everything that only applies while we're working: the queue lengths (6 m / 22 m / 30 m / 45 m / 70 m), STOP HERE WHEN DIRECTED, PREPARE TO STOP, and the crane pick-up/slew and generator radius labels (R21000 / R22500 / R29000). Leave only the static road/footpath closure, detour and signs that actually stay up overnight. If the 40 km/h and DO NOT OVERTAKE signs stay on 20B, please show them covered. * 20A options sheet. The bus stop reasoning still says "Enter Reasoning" three times. Please fill it in the same way as 19A. * Risk table on 19A and 20A (please check 17A and 18A too) still says "No…

    • 11 Nov 2026, 1:19 pm · Aisha Waver

      can we please have this done today, I really need to get this sent to the client and application submitted. Thank you!

    • 11 Nov 2026, 1:53 pm · S.B

      @Aisha Waver Could you please ask other planner to fix these issues, @Rudra Khadka is offline today.

    • 11 Nov 2026, 2:04 pm · Riri D.

      @Janna can you review and takeover from here? We need this asap today hope you can help jump into this right away. Thanks!

    • 11 Nov 2026, 3:06 pm · Riri D.

      Rev 04

    • 11 Nov 2026, 8:11 pm · Janna

      hi @S.B hi team, Kindly check the folder Rev 04 for CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley Please reach out if there is additional info needed. Thanks! 2 x TGS Amendment (19A/B/C & 20A/B) 1 x TCMP Amendment thanks!

  17. Can we please get the NMP amended for Next DC - MPX. To match the approved road permit now, for the generator install. We currently have 3 lots of date ranges, but we need it to represent the permit we now have approved, which is 7th-10th December, no contingency weekends. Thank you! Noise Management Plan - OOH Works - Rev 08 2.pdf Plans folder: Plans - CC05249 Suite: NMP Save work here: Generator Installation > Rev 09 Project location: NEXTDC B2 - Constance St, Valley Quote: none Job request form: none Request type: Amendment Scope: NMP

  18. Hi Rudra, * Truck path colours. This is the main one. "Reverse Truck Access" and "Vehicle Path" are both red in the legend, so the red line running the full length of Costin St from past Carriage St reads as the truck reversing that whole way. Please show the forward approach in magenta up to where the truck actually starts reversing, and keep red for the reverse leg only. Give "Vehicle Path" its own colour too (or drop it if it isn't needed). * 20B (site inactive) still has the 19B setup on it: the crane and truck in the work zone, the TC notes ("walk trucks out and manage H&R", "manage the affected driveways", "manage pedestrians on St Paul Tce") and the queue lengths on Costin and Water St. There won't be TCs on site after hours, so please strip all of that out and leave only the static closure/detour that stays up. The 20A reasoning ("Traffic controllers to alert vehicles after hours") needs updating to match. * Swept path in the CTMP. The appendix still has the July Rev A options via Gregory Tce / King St / Machinery St. None of them show Riri's movement (reverse into Costin, then nose out into Water St). Please add a swept path for the actual movement, coloured the same way as the TGS, so the H&R points line up with it. * Anderson St is one way. The END ROADWORK / 50 sign on Anderson (19C) only works if Anderson runs away from Water St. If the one-way flows into Water St, that approach needs advance warning (Roadwork Ahead / Prepare to Stop) instead. * 19B has "JOINS…

  19. * Truck path colours. This is the main one. "Reverse Truck Access" and "Vehicle Path" are both red in the legend, so the red line running the full length of Costin St from past Carriage St reads as the truck reversing that whole way. Please show the forward approach in magenta up to where the truck actually starts reversing, and keep red for the reverse leg only. Give "Vehicle Path" its own colour too (or drop it if it isn't needed). * AV left turn note on 19C. Ignore my earlier comment on this one. It's at Water/Baxter, not Anderson, so it's fine. * Anderson St. The END ROADWORK / 50 sign on Anderson only works if Anderson runs away from Water St. If the one-way flows into Water St, that approach needs advance warning (Roadwork Ahead / Prepare to Stop) instead. * 20B. Confirmed on the drawing: along with the TC notes and queue lengths, the crane and truck are still drawn in the work zone. For site inactive, please take all of that out. * Clipped callout. Ignore this one too. It's hidden under the insert, so nothing shows on the printed sheet. Cheers @Rudra Khadka

  20. Hi @Aisha Waver and @Riri D., for review. Link: Sharepoint - Documents - Rev 08 - All Documents Accounts: 1x NMP - Work Schedule changed (Mon - Day 1 so on..); Remove Tower Crane Installation and move the Tower Crane Installation schedule to reflect on Tower Crane Dismantle 1x Letter to Residents 1x Letter to Councilor Note: Amended both Letter to Residents and Councilor and remove Tower Demobilisation/Dismantle so NMP and Letters are cohesive Thank you!

    • 2 Nov 2026, 3:58 pm · Aisha Waver

      @Leo Escoton - should the hours of work change, as the dates we are no requesting are essentilly monday to friday instead?

    • 2 Nov 2026, 4:05 pm · Leo Escoton

      Hi @Aisha , I've successfully updated the working hours from Friday to Monday to Monday to Friday to align with the revised work schedule. Thank you!

    • 2 Nov 2026, 4:06 pm · Aisha Waver

      thank you!

  21. Hi @S.B and @Riri, for review Link: NMP Account: 1x NMP - Added Tower Crane Demobilisation on existing NMP 1x Letter to Resident - Added Tower Crane Demobilisation 1x Letter to Councilor - Added Tower Crane Demobilisation Thank You!

    • 2 Nov 2026, 12:42 pm · Christopher Wright

      Approved again

    • 2 Nov 2026, 1:27 pm · Riri D.

      @Leo Escoton please update and move it back to Rev 08

  22. As discussed on teams, with regards to their NMP amendment—we will also need to amend the TGS as per markups above Save here: S8 New Main Works >

    • 4 Nov 2026, 11:17 am · Riri D.

      @Rudra Khadka the blue line is the trucks path. it will have to reverse up in to costin, then nose out into water st to be able to exit the site. The red dots are where we will require hold and release for this

    • 5 Nov 2026, 3:32 am · Rudra Khadka

      Hi @Aisha Waver @S.B @Riri D. Task is completed and uploaded to attached link below. Kindly let me know if this requires further adjustments. Link:https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Accounts, 1 x TGS Amendment (19B/C) 1 x TMP ( Updated 19B/C on CTMP) Thank You!

    • 9 Nov 2026, 1:22 pm · S.B

      @Rudra Khadka Implement swept path direction correctly in the tgs (forward and reverse) with colour coding for forward and reverse Reference tc position properly Anderson st is one way

    • 9 Nov 2026, 4:16 pm · Rudra Khadka

      Hi @S.B Comments are amended and uploaded to its respective folder. If this requires any further changes kindly let me know. Thank You!

    • 10 Nov 2026, 9:41 pm · Rudra Khadka

      Hi @S.B Will you please confirm the swept path direction of 19B; i see it different what we have on CTMP and what i am told to do above from Rihana. Remaining other changes are made and uploaded to its respective folder. Thank You!

    • 11 Nov 2026, 8:28 am · S.B

      @Rudra Khadka Please use the Swept path from the RPEQ Folder Generator Installation Swept Path

  23. Please amend NMP to include everything all together—generator installation, tower crane installation and dismantle. We will also require to amend their notification letter for both residents and councilor. The rest of the details will remain as is Save here: Generator Installation > Rev 03

  24. Hi @Christopher Wright and @Riri D., for review Link: NMP Accounts: 1x NMP - Amended, added Tower Crane Installation on the NMP 1x Letter to Council 1x Letter to Residents Thank you!

    • 2 Nov 2026, 10:43 am · Christopher Wright

      This appears to be GTG @Aisha Waver

  25. CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle) Aisha Waver Client review no charged as per Aisha

  26. CC05249-NMP - Rev 6 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation) Aisha Waver Client review no charged as per Aisha

  27. Sent to client Fw_ NMP - Generator Installation.eml

  28. Sent to client NMP - Tower Crane Dismantle Review.eml

  29. Hi @Christopher Wright and @Riri D., for review Link: NMP Accounts: 1x NMP - Created NMP for Tower Crane Demobilization and reflected the correct dates. Thank you!

    • 29 Oct 2026, 2:02 pm · Riri D.

      @Leo Escoton can you make sure the letters to residents and councilor are done for this too

  30. Hi @Christopher Wright and @Riri D., for review. Link: NMP Accounts: 1x NMP - Remove any references for Tower Crane and updated the Schedule. Thank you!

    • 29 Oct 2026, 11:19 am · Riri D.

      @Leo Escoton NMP amendement please - Next DC constance - Generator install can we please add the tower crane Install works. Please also change the schedule of works from friday saturday etc to day 1 day 2 etc so its not so specific

    • 29 Oct 2026, 2:02 pm · Riri D.

      @Leo Escoton can you make sure the letters to residents and councilor are done as well

  31. Hi Plans folder: Plans - CC05249 Suite: NMP Save work here: Tower Crane Dismantle > Rev 00 Project location: NEXTDC B2 - Constance St, Valley Quote: N/A Request type: New Scope: NMP Specific operations: Client mark-ups/attachments: Any specific files the planner needs to refer to?

    • 28 Oct 2026, 12:53 pm · Riri D.

      @Leo Escoton we need to create a new NMP for the tower crane dismantle for Next DC - Constance, with the attached dates

    • 29 Oct 2026, 6:56 am · Christopher Wright

      This is GTG @Aisha Waver

  32. Hi Plans folder: Plans - CC05249 Suite: Save work here: NMP > Generator Installation > Rev 07 Project location: NEXTDC B2 - Constance St, Valley Quote: N/A Request type: Amendment Scope: NMP Specific operations: Client mark-ups/attachments: Any specific files the planner needs to refer to?

    • 28 Oct 2026, 12:53 pm · Riri D.

      @Leo Escoton We need to remove the tower crane completely from this NMP. Amend the dates for the following

    • 29 Oct 2026, 6:58 am · Christopher Wright

      This is GTG @Aisha Waver

  33. No charge - Per Chelsea - Dates updated only

  34. @Riri D. GTG

  35. Hi Plans folder: Plans - CC05249 Suite: NMP Save work here: Generator Installation > Rev 06 Project location: NEXTDC B2 - Constance St, Valley Quote: N/A Request type: Amendment Scope: NMP Specific operations:Can we please get the NMP for Constance st actioned. We need to include the tower crane and miserton st works Client mark-ups/attachments: Any specific files the planner needs to refer to?

    • 15 Oct 2026, 1:25 pm · Aisha Waver

      the remaining of the email following the image from above

    • 16 Oct 2026, 10:51 am · R.R

      Hi @Aisha Waver @Christopher Wright, NMP uploaded here: Sharepoint - Documents - Rev 06 - All Documents Accounts: 1 NMP amendments

  36. Hi, Save Work Here: Plans - CC05249 > NMP > Generator Installation > Rev 05 Folder Name: NEXTDC B2 - Constance St, Valley NO CHARGE. INSTRUCTIONS: change of dates of Misterton St... Generator Install Dates:  Generator Installation Dates Activity Street Shift From To Duration Day / Night 20/11/2026 Friday 23/11/2026 Monday weekend Generator installation Constance St Day / Night 27/11/2026 Friday 30/11/2026 Monday weekend (contingency 1) Day / Night 4/12/2026 Friday 7/12/2026 Monday weekend (contingency 2) Day / Night 11/12/2026 Friday 14/12/2026 Monday weekend (contingency 3) Misterton St Loading Dock Demolition & Bulk Excavation works Dates:  Misterton St Loading Dock Demolition & Bulk Excavation Dates Activity Street Shift From To Hours Noise Level Duration Shifts Loading Dock Demolition & Bulk Excavation Misterton St Night 19/10/2026 Monday 18/12/2026 Friday 18:30 - 12:00 High level noise 4 weeks (4 active weeks, 4 contingency weeks) 20 shifts (20 contingency shifts) New activity to be added to the NMP Tower Crane Dismantle Dates:  Tower Crane Dismantle Dates Activity Street Shift From To Duration Tower Crane Dismantle Constance St Day / Night 05/12/2026 Friday 06/12/2026 Monday weekend Day / Night 12/12/2026 Friday 13/12/2026 Monday weekend (contingency 1) Schedule of works: Saturday 12:00am – 6:30am * Traffic Control set-up Constance St road closure (TGS Attached) * Borgers 500T to be unloaded off float into area off Gregory Terrace * LCL 150t & Borgers 500t crane to…

    • 8 Oct 2026, 10:42 am · B.R

      Hi @Aisha Waver, can I ask for a copy of the email? thank you!

    • 8 Oct 2026, 12:30 pm · Aisha Waver

      will try to attach it here - FW_ Approved Permits – CC05249 - Multiplex - NextDC - Constance St, Fortitude Valley (OOH_ Generator Installation).eml

    • 8 Oct 2026, 8:08 pm · B.R

      Hi @Christopher Wright, This is uploaded and for review. Thank you! NMP - Noise Management Plan - OOH Works - Rev 05.pdf Account: 1xNMP Amendment

    • 9 Oct 2026, 6:19 am · Christopher Wright

      This is GTG

    • 9 Oct 2026, 2:37 pm · Aisha Waver

      will send to client myself

  37. The dates may be changing again. So please hold off on the amendment request.

  38. Hi @A.A and @Riri D. for review CC05249 Accounts: 1x NMP Changes: Updated the Generator Installation and Loading Dock Demolition OOH schedules as instructed. Thank you!

    • 30 Sep 2026, 10:57 am · K.R

      @Leo Escoton this has not been updated per the new schedule in the email chain. Please update the schedule only. Can you please advise if you made any other changes?

    • 30 Sep 2026, 11:15 am · Leo Escoton

      Hi @K.R ! I must've uploaded the wrong file but everything's good now, the new and amended version of the file has been uploaded. Thank you!

  39. Hi @Leo, Pls see instructions below. Main Project Folder: NEXTDC B2 - Constance St, Valley Save work here: NMP > Rev 04 Instructions as provided: "urgent noise management plan amendment. Very simple. if you could copy and paste the update schedule from the email below. Revise up the noise management plan, no other wording needs to be changed. We need to update the attached version. Need this done as soon as possible please." Email: FW Approved Permits – CC05249 - Multiplex - NextDC - Constance St, Fortitude Valley (OOH Generator Installation)_4807.eml File: Noise Management Plan - OOH Works_1123.pdf Any questions, kindly liaise with @Riri D. thanks thanks ~ clint

    • 29 Sep 2026, 10:30 am · Riri D.

      @Leo Escoton please message or mentioned me once done. THanks!

  40. Hi Plans folder: CC05249 - NMP Suite: Save work here: NMP > Generator Installation > Rev 03 Project location: NEXTDC B2 - Constance St, Valley Quote: N/A Request type: Amendment Scope: NMP Specific operations: Please amend the dates as per email Client mark-ups/attachments: Generator Install _ Misterton St Loading Dock Permit Application Dates.eml

    • 11 Sep 2026, 11:10 am · Riri D.

      @B.R just update the current activity to the new one

    • 11 Sep 2026, 2:11 pm · B.R

      Hi @A.A, This is uploaded and for review. Thank you! Folder Link: Generator Installation > Rev 03 NMP - Noise Management Plan - OOH Works - Rev 03.pdf Account: 1xNMP Amendment

    • 15 Sep 2026, 10:16 am · Riri D.

      @B.R could you please check and see if the same details for their activities A007083310 Decision Notice.pdf Generator Install _ Misterton St Loading Dock Permit Application Dates.eml NMP.pdf RE_ Approved Permits – CC05249 - Multiplex - NextDC - Constance St, Fortitude Valley (OOH_ Generator Installation).eml

    • 15 Sep 2026, 10:42 am · B.R

      Hi @Riri D., upon checking the email. the approved hours is outdated and is based on the previous dates. The latest should be the below which is reflected on NMP Rev3

    • 18 Sep 2026, 11:30 am · Riri D.

      @Christopher Wright could you please assist in reviewing this? Thanks!

    • 18 Sep 2026, 12:25 pm · Christopher Wright

      This appears to be GTG @C.C

  41. Please invoice @Sandy @Permits 4xTGS amendment (CC05249-S8-17B, CC05249-S8-18B, CC05249-S8-19B, CC05249-S8-20B) 1x TMP amendment

    • 9 Sep 2026, 9:28 am · Permits

      Invoice Sent to Client (IV0025206)- Karein (0909) Re_ RE_ Generator Install Swept Path.eml

06Every file and folder

1,561 files in 424 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved