Scape Tribune St
McNab
What's new
- 16 Nov 2026, 3:47 pmS.B on CC05649-S3 - Rev 11 - McNab - Scape Tribune St: Hi Marie, Thanks, quick turnaround on this one. The Rev 11 cover note ("TGS amend for Road Work Ahead, Pedestrian Signs and Aftercare – 11 – 16/11/2026") is in, the title blocks are all at Rev 11 / 16/11, and on 2B, 3B, 4B, 12B and 15B the pedestrian…
- 16 Nov 20264 files saved on SharePoint: CC05649-S3-TGS-Rev11.tcp, CC05649-S3-TGS-Rev11.pdf, Daily Arrangement Aftercare mark up - Scape.png, McNab - Scape Tribune St.xlsx
- 16 Nov 2026, 10:13 amRiri D. on CC05649-S3 - Rev 11 - McNab - Scape Tribune St: TGS: CC05649-S3-2B, 3B, 4B, 12B, 15B to be amended as per below Amend all long term signage to be in line with CC05649-S3-4B (Rev 6) which shows: * RWA / Workman / Arrow on each side street * On Each Approach it will be RWA / Workman / DNO This sign has been…
- 14 Nov 20264 files saved on SharePoint: Invoice IV0025973.pdf, Invoice IV0025973.pdf, Letter to Residents - 43 Scape Tribune St - Concrete Pours.pdf, Letter to Residents - 43 Scape Tribune St - Concrete Pours1.pdf
- 13 Nov 202617 files saved on SharePoint: CC05649-NMP-Scape Tribune St - External Water Works.pdf, CC05649-S7-TGS-Rev11.pdf, Re_ 149 Merivale St Southbank - 26-PNT-88924 - 1.pdf, BCC Approval Package (Council File Reference_ A006395607).pdf and 13 more
- 12 Nov 2026, 5:15 pmEthan Mathews on CC05649-S7 - Rev 11 - McNab - Scape Tribune St: @Riri D. / @Permits / @Lexi R ACCOUNTS - No Charge as per Ethan
Crompton Concepts prepares the traffic management for McNab on this project at Scape Tribune St, South Brisbane, QLD. 3 Monday requests are open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 05; 5 TGS suites on file (S1 Rev 02, S2 Rev 06, S3 Rev 11, S5 Rev 00…). On the permit boards: 2 permits in force and 4 in progress. Monday holds 29 requests for this job (1 new, 28 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- Folder3. Plans - CC05649
- MondayCC05649-S3 - Rev 11 - McNab - Scape Tribune St
- MondayCC05649 - NMP - Rev 1 - McNab - Scape Tribune St (Concrete Pours)
- MondayCC05649- NMP - McNab - Scape Tribune St (External Water Works)
- Client
- McNab
- Crompton job
- CC05649
- Location
- Scape Tribune St, South Brisbane, QLD
- LGA / authority
- City of Brisbane
- Project coordinator
- C.C
- Latest planner · TMD
- Marie Est · Christopher Wright
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- 2 in force · 4 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 1,232 in 282 folders
What needs attention now
- Review comments to action: CC05649-S3 - Rev 11 - McNab - Scape Tribune St. Required by 18 Nov 2026. Planner: Marie Est · TMD: Christopher Wright · Last note (16 Nov 2026, S.B): “Hi Marie, Thanks, quick turnaround on this one. The Rev 11 cover note ("TGS amend for Road Work Ahead, Pedestrian Signs and Aftercare – 11 – 16/11/2026") is in, the title blocks…”
- Urgent TMD approved, ready to issue: CC05649- NMP - McNab - Scape Tribune St (External Water Works). Required by 13 Nov 2026 (overdue). Planner: Leo Escoton · Last note (12 Nov 2026, Leo Escoton): “Hi @Christopher Wright and @Riri D., for review Link: Sharepoint - Documents - External Water Works - All Documents Accounts: 1x NMP – Created Noise Management Plan for Tower…”
- TMD approved, ready to issue: CC05649 - NMP - Rev 1 - McNab - Scape Tribune St (Concrete Pours). Required by 14 Nov 2026 (overdue). Planner: Leo Escoton · Last note (12 Nov 2026, Leo Escoton): “Hi @Christopher Wright and @Riri D., for review. Link: Sharepoint - Documents - Rev 01 - All Documents Account: 1x NMP = Amended the Project Specific Conditions, including the…”
- Permit in progress: OOH: Water Connection Works (BCC road) is Initial Pending. Follow up 18 Nov 2026. Wanted from 23 Nov 2026.
- Permit in progress: Road: Daily Arrangement (BCC road) is Council Pending. Follow up 21 Dec 2026. Wanted from 25 Dec 2026.
- Permit in progress: Early Works (Footpath) is Fee Quote/Notice to Pay Received / Sent. Follow up 18 Nov 2026. Wanted from 23 Oct 2026.
- Permit in progress: OOH: Concrete Pours (BCC road) is Initial Pending. Follow up 23 Nov 2026. Wanted from 3 Dec 2026.
PPermits
11 permit lines on the Monday permit boards: 2 in force, 4 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| OOH: Water Connection Works Team Ethan · BCC Road Permits - Ethan | BCC road | Date Specific | In progress Initial Pending | 23 Nov 2026 – 30 Nov 2026 | 13 Nov 2026 | 18 Nov 2026 | ||
| Road: Daily Arrangement Team Ethan · BCC Road Permits - Ethan | BCC road | Ongoing | In progress Council Pending | 25 Dec 2026 – 25 Jan 2027 | 30 Oct 2026 | 21 Dec 2026 | 21 Dec 2026 | |
| Early Works Team Ethan · BCC Footpath Applications - Ethan | Footpath | Ongoing | In progress Fee Quote/Notice to Pay Received / Sent | 23 Oct 2026 – 31 Jan 2027 | 4 Nov 2026 | 18 Nov 2026 | 19 Nov 2026 | |
| OOH: Concrete Pours Team Ethan · BCC Road Permits - Ethan | BCC road | Date Specific | In progress Initial Pending | 3 Dec 2026 – 31 Mar 2027 | 13 Nov 2026 | 23 Nov 2026 | 16 Nov 2026 | |
| Footpath: Water Connection Works Team Ethan · BCC Footpath Applications - Ethan | Footpath | Date Specific | In force Done | 2 Nov 2026 – 30 Nov 2026 | 30 Oct 2026 | |||
| Workzone: 30m Team Ethan · BCC Road Permits - Ethan | BCC road | Ongoing | In force Done | 17 Sep 2026 – 31 Dec 2026 | 18 Sep 2026 | |||
| Prelodgement Meeting Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name | CMP / LONO | Done | ||||||
| CMP Application (Early Works) Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name | CMP / LONO | Done | ||||||
| CMP Application (Main Works) Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name | CMP / LONO | Done | ||||||
| Prestart Meeting (Early Works) Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name | CMP / LONO | Done | ||||||
| Prestart Meeting (Main Works) Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name | CMP / LONO | Done |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLRE JL - 4368 - Barrier Fence Review - Tribune St12 Nov 2026
- EMLRe_ 149 Merivale St Southbank - 26-PNT-88924 - 11 Nov 2026
- EMLA007130143 - 41 TRIBUNE ST SOUTH BRISBANE QLD 4101 - Updated Fee Quote (id7317672)4 Nov 2026
- EMLA007135446 - 41 TRIBUNE ST SOUTH BRISBANE QLD 4101 - Footways Permit (id-7310196)30 Oct 2026
- EMLQuote for installation and purchase - 41 Tribune Street, South Brisbane29 Oct 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 05 | 23 Apr 2026 | 5 | CC05649-S2-CTMP-Early Works-Rev05.pdf |
| — | TMP | Rev 06 | 11 May 2026 | 2 | CC05649-S2-TMP-Early Works-Rev06.pdf |
| — | NMP | Rev 01 | 13 Nov 2026 | 2 | CC05649-NMP-Scape Tribune St - Concrete Pours.pdf |
| — | RA | Rev 01 | 8 Jan 2026 | 2 | Risk Assessment - Barrier design- 41 Tribune St_1 1.pdf |
| — | Letter to residents | no rev | 14 Nov 2026 | 0 | Letter to Residents - 43 Scape Tribune St - Concrete Pours.pdfLetter to Residents - 43 Scape Tribune St - Water Connection Works.pdfLetter to Residents - 43 Scape Tribune St.pdf |
| General | Workzone plan | no rev | 18 Sep 2026 | 0 | Workzone Cert RC-15438-1.pdf |
| S1 | TGS | Rev 02 | 10 Jul 2026 | 2 | CC05649-S1-TGS-Rev02.pdf |
| S2 | TGS | Rev 06 | 11 May 2026 | 3 | CC05649-S2-TGS-Rev06.pdf |
| S3 | TGS | Rev 11 | 16 Nov 2026 | 12 | CC05649-S3-TGS-Rev11.pdf |
| S5 | TGS | Rev 00 | 14 Apr 2026 | 1 | CC05649-S5-TGS-Rev00.pdf |
| S7 | TGS | Rev 11 | 13 Nov 2026 | 3 | CC05649-S7-TGS-Rev11.pdf |
03Requests on Monday
29 requests since 12 May 2025: 1 for new plans and 28 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC05649-S3 - Rev 11 - McNab - Scape Tribune St | Amendment | S3 | Rev 11 | Review amendments Internal Amendments | 16 Nov 2026 | 18 Nov 2026 | Marie Est | Christopher Wright |
| CC05649 - NMP - Rev 1 - McNab - Scape Tribune St (Concrete Pours) | Amendment | NMP | Rev 01 | TMD approved TMD Approved | 12 Nov 2026 | 14 Nov 2026 | Leo Escoton | |
| CC05649- NMP - McNab - Scape Tribune St (External Water Works) Urgent | Amendment | NMP | TMD approved TMD Approved | 11 Nov 2026 | 13 Nov 2026 | Leo Escoton | ||
| CC05649-S7 - Rev 11 - McNab - Scape Tribune St | Amendment | S7 | Rev 11 | Closed No Charge | 2 Nov 2026 | 4 Nov 2026 | ||
| CC05649-S7 - Rev 10 - McNab - Scape Tribune St | Amendment | S7 | Rev 10 | Invoiced Invoiced | 13 Oct 2026 | 15 Oct 2026 | ||
| CC05649-S3 - Rev 10 - McNab - Scape Tribune St | Amendment | S3 | Rev 10 | Invoiced Invoiced | 25 Sep 2026 | 27 Sep 2026 | ||
| CC05649 - NMP - McNab - Scape Tribune St (Concrete Pours) | Amendment | NMP | Invoiced Invoiced | 14 Sep 2026 | 16 Sep 2026 | |||
| CC05649-S3 - Rev 9 - McNab - Scape Tribune St | Amendment | S3 | Rev 09 | Invoiced Invoiced | 24 Aug 2026 | 26 Aug 2026 | ||
| CC05649-S3 - Rev 8 - McNab - Scape Tribune St | Amendment | S3 | Rev 08 | Invoiced Invoiced | 14 Aug 2026 | 16 Aug 2026 | ||
| CC05649-NMP - McNab - Scape Tribune St | Amendment | NMP | Invoiced Invoiced | 2 Jun 2026 | 4 Jun 2026 | |||
| CC05649-S3 - McNab - Scape Tribune St | Amendment | S3 | Closed No Charge | 20 May 2026 | 22 May 2026 | |||
| CC05649-S2 - Rev 6 - McNab - Scape Tribune St | Council RFI | S2 | Rev 06 | Closed No Charge | 11 May 2026 | 13 May 2026 | ||
| CC05649-S2 - Rev 5 - McNab - Scape Tribune St | Amendment | S2 | Rev 05 | Invoiced Invoiced | 22 Apr 2026 | 24 Apr 2026 | ||
| CC05649-S3 - Rev 5 - McNab - Scape Tribune St | Amendment | S3 | Rev 05 | Invoiced Invoiced | 17 Apr 2026 | 19 Apr 2026 | ||
| CC05649-S5 - McNab - Scape Tribune St | Amendment | S5 | Closed No Charge | 9 Apr 2026 | 11 Apr 2026 | |||
| CC05649-S2 - Rev 3 - McNab - Scape Tribune St | Amendment | S2 | Rev 03 | Closed No Charge | 18 Mar 2026 | 20 Mar 2026 | ||
| CC05649-S3- Rev 4 - McNab - Scape Tribune St | Amendment | S3 | Rev 04 | Invoiced Invoiced | 16 Mar 2026 | 18 Mar 2026 | ||
| CC05649-S2 - Rev 2 - McNab - Scape Tribune St | Amendment | S2 | Rev 02 | Closed No Charge | 4 Mar 2026 | 6 Mar 2026 | ||
| CC05649 - S1 + S2 - McNab - Scape Tribune St | Amendment | S1 | Invoiced Invoiced | 23 Feb 2026 | 25 Feb 2026 | |||
| CC05649-S3 - Rev 3 - McNab - Scape Tribune St | Amendment | S3 | Rev 03 | Invoiced Invoiced | 17 Feb 2026 | 19 Feb 2026 | ||
| CC05649-S1 - Rev 2 - McNab - Scape Tribune St | Amendment | S1 | Rev 02 | Invoiced Invoiced | 5 Feb 2026 | 7 Feb 2026 | ||
| CC05649-S3 - Rev 2 - McNab - Scape Tribune St | Amendment | S3 | Rev 02 | Invoiced Invoiced | 30 Jan 2026 | 1 Feb 2026 | ||
| CC05649-S1 & S2 - McNab - Scape Tribune St | Amendment | S1 | Invoiced Invoiced | 30 Jan 2026 | 1 Feb 2026 | |||
| CC05649-S3 - Rev 1 - McNab - Scape Tribune St | Amendment | S3 | Rev 01 | Invoiced Invoiced | 18 Dec 2025 | 20 Dec 2025 | ||
| CC05649-S1 & S2 - Rev 1 - McNab - Scape Tribune St | Amendment | S1 | Rev 01 | Invoiced Invoiced | 17 Dec 2025 | 19 Dec 2025 | ||
| CC05649-S3 - McNab - Scape Tribune St | Amendment | S3 | Invoiced Invoiced | 10 Dec 2025 | 12 Dec 2025 | |||
| CC05649-S2 - McNab - Scape Tribune St | Amendment | S2 | Not proceeding Not proceeding | 9 Dec 2025 | 11 Dec 2025 | |||
| CC05649-S1 - McNab - Scape Tribune St | Amendment | S1 | Invoiced Invoiced | 3 Dec 2025 | 5 Dec 2025 | |||
| CC05649 - McNab - Scape Tribune St | New plans | Invoiced Invoiced | 12 May 2025 | 14 May 2025 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- 1. Archived
- CA Adam Read0421 409 053 · adam.read@mcnab.net.au
- CA James Preston0407 698 799
- CA Email Address
- CA Phone Number
- Name - PM
- Name - SM
- Phone no
- Safetyian.mcaway@mcnab.net.au
- CA Aiden Watson0427 595 963
- 0427 595 9630427 595 963
- Aiden.Watson@mcnab.net.auAiden.Watson@mcnab.net.au
- PM Gerard Harris0448 124 205
- PM Email Address
- PM Phone Number
- Storm.Sandilands@mcnab.net.auStorm.Sandilands@mcnab.net.au
Crompton Concepts
- Marie EstPlanner
- Christopher WrightTMD
- Leo EscotonPlanner
- C.CProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 3:47 pm · S.B · CC05649-S3 - Rev 11 - McNab - Scape Tribune St
Hi Marie, Thanks, quick turnaround on this one. The Rev 11 cover note ("TGS amend for Road Work Ahead, Pedestrian Signs and Aftercare – 11 – 16/11/2026") is in, the title blocks are all at Rev 11 / 16/11, and on 2B, 3B, 4B, 12B and 15B the pedestrian long-term sign now reads FOOTPATH CLOSED AHEAD / USE OTHER FOOTPATH / PEDESTRIANS (arrow) rather than "AT SIGNALS". A few things to check: 1. Long-term signs on the other sheets * 6B, 7B and 14B still show the old "AT SIGNALS" plate. Long-term signs are the same on site whatever sheet is running, so if the installed sign is the Pedestrians/arrow version, please update those three as well. Otherwise the crew will see two different versions of the same sign across the deck. * The same applies to the RWA / Workman / Arrow (side streets) and RWA / Workman / DNO (approaches) sets. Please make sure 6B, 7B and 14B carry the same long-term sets as 4B, not just the five sheets listed in the request. 2. 13B Aftercare * Please add a 1.8 m dimension from the solid hoarding to the new fence line, and a note that pedestrians walk through on the slab and the fence closes off any access behind the barrier. That's the key part of the client's request, and I can't see it called out in the text. * The secondary pedestrian detour on the other side of Tribune St: please confirm it's drawn, with FOOTPATH CLOSED / USE OTHER FOOTPATH signs at the crossing points on both ends, and a kerb ramp / safe crossing location shown. * 13B still has several…
- 16 Nov 2026, 10:13 am · Riri D. · CC05649-S3 - Rev 11 - McNab - Scape Tribune St
TGS: CC05649-S3-2B, 3B, 4B, 12B, 15B to be amended as per below Amend all long term signage to be in line with CC05649-S3-4B (Rev 6) which shows: * RWA / Workman / Arrow on each side street * On Each Approach it will be RWA / Workman / DNO This sign has been installed with a Ped Left Arrow, instead of "At Signals", please change: TGS: CC05649-S3-13B (Aftercare) - Please amend as per below: * Amend To add secondary Ped Detour to other side of Tribune St * Amend the fencing to be 1.8m wide from the site boundary and for Peds to be able to walk through the fencing and remove ability of movement behind the barrier (Site want to create a walkway on the slab that is 1.8m wide from their solid hoarding on the boundary of site outwards. * Adjust signage where applicable Please have the Amended TGS's saved here below: Plans folder: 3. Plans - CC05649 Suite: S3 - Main Works Save work here: TGS > Rev 11 Project location: Scape Tribune St Quote: none Job request form: none Request type: Amendment Scope: TGS
- 16 Nov 2026, 1:06 pm · Marie Est
Hello @Christopher Wright, The TGS S3 has already been amended and uploaded to the folder. Please review it at your convenience. * 1x TGS Amendment - CC05649-S3-2B, 3B, 4B, 12B, 15B (RWA signs and Ped Sign) - CC05649-S3-13B (Aftercare - additional detour and remove diversion) Link: TGS - Rev 11
- 16 Nov 2026, 1:06 pm · Marie Est
- 12 Nov 2026, 5:15 pm · Ethan Mathews · CC05649-S7 - Rev 11 - McNab - Scape Tribune St
@Riri D. / @Permits / @Lexi R ACCOUNTS - No Charge as per Ethan
- 12 Nov 2026, 4:33 pm · Leo Escoton · CC05649 - NMP - Rev 1 - McNab - Scape Tribune St (Concrete Pours)
Hi @Christopher Wright and @Riri D., for review. Link: Sharepoint - Documents - Rev 01 - All Documents Account: 1x NMP = Amended the Project Specific Conditions, including the approved hours of work and the concrete pour schedule (16 scheduled dates with a 5:00 AM start). Thank you!
- 13 Nov 2026, 1:46 pm · D.B
TMD Approved
- 13 Nov 2026, 1:46 pm · D.B
- 12 Nov 2026, 1:53 pm · Leo Escoton · CC05649- NMP - McNab - Scape Tribune St (External Water Works)
Hi @Christopher Wright and @Riri D., for review Link: Sharepoint - Documents - External Water Works - All Documents Accounts: 1x NMP – Created Noise Management Plan for Tower Crane Installation and Sewer Connection Works at Scape Tribune Street, including project-specific work details and schedules. Thank you!
- 13 Nov 2026, 12:04 pm · Riri D.
@Leo Escoton please remove tower crane from the water works NMP
- 13 Nov 2026, 12:25 pm · Leo Escoton
Hi @Riri D., already removed Tower Crane Installation from NMP. Thank you!
- 13 Nov 2026, 2:08 pm · Leo Escoton
Hi @Riri D. @Christopher Wright, I can't seem to upload the word file on Sharepoint as their is an ongoing issue with Microsoft right now. However, I was able to send Rih the items on Teams. Thank you!
- 13 Nov 2026, 2:09 pm · D.B
@Leo Escoton, please disregard the NMP, currently working on the current one
- 13 Nov 2026, 12:04 pm · Riri D.
- 12 Nov 2026, 1:22 pm · Riri D. · CC05649 - NMP - Rev 1 - McNab - Scape Tribune St (Concrete Pours)
Can get the NMP for Concrete pours amended to have the below included Plans folder: 3. Plans - CC05649 Suite: NMP Save work here: Concrete Pours > Rev 01 Project location: Scape Tribune St Quote: none Job request form: none Request type: Amendment Scope: NMP
- 11 Nov 2026, 3:13 pm · Riri D. · CC05649- NMP - McNab - Scape Tribune St (External Water Works)
NMP Amendment for their external water works to include the attached Aidens email from site: These works will start on the 23rd of November between 12:30am and 4:30am and will be completed using the attached TGS's and they would like 24th, 25th and 26th as a contingency period Can we please also include in the NMP a section that includes the correspondence UniLodge and Urban Utilities as per the attached. Please save the files below: Main Folder Link: Scape Tribune St NMP: External Water Works Docs: CC05649-S7-TGS-Rev11.pdf Re_ 149 Merivale St Southbank - 26-PNT-88924 - .eml
- 2 Nov 2026, 4:47 pm · Ethan Mathews · CC05649-S7 - Rev 11 - McNab - Scape Tribune St
@Riri D. I have shown @K.G this amendment and been advised GTG - Changing to "TMD Approved" and sending to client now.
- 2 Nov 2026, 2:27 pm · Riri D. · CC05649-S7 - Rev 11 - McNab - Scape Tribune St
Please move the barrier board back and footpath closed sign slightly back and amend the Ped detour to be able to show peds going across the road under the bridge and back around the other side of Tribune St. Please also make this clear here that the pedestrians cannot travel past site side footpath and will need to go into the live lane under hold and release with TC assisting managing vehicles from the lane way and holding traffic for them to detour into the live lane under hold and release on site side: 3. Plans - CC05649 Save here: S7 - One off Activities > Rev 11
- 2 Nov 2026, 3:52 pm · Janna
hi @Riri D. Kindly check the folder Rev 11 for CC05649-S7 - Rev 11 - McNab - Scape Tribune St. Please reach out if there is additional info needed. Thanks! 1 x TGS Pedestrian Detour Amendment
- 2 Nov 2026, 3:52 pm · Janna
- 29 Oct 2026, 1:09 pm · Sandy · CC05649-S3 - Rev 10 - McNab - Scape Tribune St
✓ IV0025765 - draft waiting for approval (2910)
- 2 Nov 2026, 5:20 pm · Riri D.
invoice to client
- 2 Nov 2026, 6:04 pm · Riri D.
Scape Tribune - Harmonise TGS.eml
- 2 Nov 2026, 5:20 pm · Riri D.
- 29 Oct 2026, 1:02 pm · Sandy · CC05649-S7 - Rev 10 - McNab - Scape Tribune St
✓ Invoice IV0025763 - draft waiting for approval (2910)
- 2 Nov 2026, 5:12 pm · Riri D.
invoice to client
- 2 Nov 2026, 6:07 pm · Riri D.
Re_ Scape 2 - Water Connection - TGS UPDATE.eml
- 2 Nov 2026, 5:12 pm · Riri D.
- 29 Oct 2026, 9:01 am · Ethan Mathews · CC05649-S7 - Rev 10 - McNab - Scape Tribune St
@Riri D. / @Permits / @Lexi R - ACCOUNTS: To be invoiced as per below Accounts: 4xTGS Add'l - CC05649-S7-12A/B - External Service Works - Northbound Closure (Site Active) - CC05649-S7-13A/13B - External Service Works - Northbound Closure (Site Inactive) - CC05649-S7-14A/14B - External Service Works - Northbound Closure (Site Active) - CC05649-S7-15A/15B - External Service Works - Northbound Closure (Site Inactive)
- 29 Oct 2026, 8:52 am · Ethan Mathews · CC05649-S3 - Rev 10 - McNab - Scape Tribune St
@Permits / @Lexi R / @Riri D. - To be invoiced: x2 TGS: CC05649-S3-14A/14B - Harmonisation Plan 1: Road Closure (CC05649-S7-10B) and Parking Lane Closure (CC05649-S6-16B) CC05649-S3-15A/15B - Harmonisation Plan 2: Road Closure (CC05649-S7-10B) and Shuttle Flow (CC05649-S6-17B)
- 19 Oct 2026, 10:12 am · K.R · CC05649 - NMP - McNab - Scape Tribune St (Concrete Pours)
Invoice per quote
- 21 Oct 2026, 6:54 pm · Permits
Invoice sent to client - Iris (211026) IV0025658 Invoice IV0025658 for CC05649 - NMP - McNab - Scape Tribune St (Concrete Pours).eml
- 21 Oct 2026, 6:54 pm · Permits
- 16 Oct 2026, 4:40 pm · A.A · CC05649-S7 - Rev 10 - McNab - Scape Tribune St
@Riri D. GTG
- 15 Oct 2026, 9:34 am · Riri D. · CC05649-S7 - Rev 10 - McNab - Scape Tribune St
Plans sent to client - Re_ Scape 2 - Water Connection - TGS UPDATE.eml
- 15 Oct 2026, 3:56 pm · Riri D.
amended plans sent to client Re_ Scape 2 - Water Connection - TGS UPDATE.eml
- 15 Oct 2026, 3:56 pm · Riri D.
- 13 Oct 2026, 9:17 am · Sandy · CC05649-S7 - Rev 10 - McNab - Scape Tribune St
Hi Plans folder: 3. Plans - CC05649 Suite: S7 - One off Activities Save work here: TGS > Rev 10 Project location: Scape Tribune St Quote: QU5701 Request type: Amendment Scope: TGS Specific operations: We will need to put together x4 New TGS (x2 Site Active and x2 Site Inactive). Please see attached correspondence and accepted quote to refer to with info for the TGS requirements. TGS to amend: TGS number Client mark-ups/attachments: Any specific files the planner needs to refer to? Quote QU5701 - External Water Works Planning Estimate.pdfExternal Water Works Correspondence.pdf
- 13 Oct 2026, 1:53 pm · B.R
Hi @Ethan Mathews, can you confirm if the waterworks will be limited to this area only based on the markup. Thank you!
- 13 Oct 2026, 2:40 pm · Riri D.
@B.R
- 13 Oct 2026, 2:45 pm · Riri D.
@B.R
- 14 Oct 2026, 10:38 am · B.R
Hi @S.B, This is uploaded and for review. Thank you! Folder Link: Rev 10 TGS - CC05649-S7-TGS-Rev10.pdf Accounts: 4xTGS Add'l - CC05649-S7-12A/B - External Service Works - Northbound Closure (Site Active) - CC05649-S7-13A/13B - External Service Works - Northbound Closure (Site Inactive) - CC05649-S7-14A/14B - External Service Works - Northbound Closure (Site Active) - CC05649-S7-15A/15B - External Service Works - Northbound Closure (Site Inactive)
- 15 Oct 2026, 1:55 pm · Riri D.
@B.R Delete out 11A/11B to avoid confusion. We’ll look to get pedestrians back onto the footpath before the intersection – Crompton have installed a permanent sign in the kerb ramp where your temp ramp is showing. Please update and then good enough to go in.
- 15 Oct 2026, 3:15 pm · B.R
HI @S.B, This is re-uploaded. let me know if there are any changes needed. Thank you! - Deleted TGS 11A/B - TGS 14A/B - Temporary Ramp removed on the intersection.
- 13 Oct 2026, 1:53 pm · B.R
- 25 Sep 2026, 3:55 pm · Permits · CC05649-S3 - Rev 10 - McNab - Scape Tribune St
Hi @Y.B Please save work here: S3 - Main Works > Rev 10 Project folder: Scape Tribune St @Ethan Mathews will add details. Thank you - Shaz
- 25 Sep 2026, 4:06 pm · Riri D.
@Y.B The tgs for scape McNab in one off arrangements is a road closure of Colchester to be harmonised with a parking lane closure on tribune and another one with a 2 lnae closure on tribune with a shuttle flow Those parking lane and 2 lane closure have been designed in the prior to barrier installation suite
- 29 Sep 2026, 1:18 pm · Y.B
Hi @Christopher Wright, I've added 2x additional TGS in the suite. Please let me know if any changes are required. Thank you! 2x Additonal TGS (Hamonisation plans from S6 and S7) 1. CC05649-S3-14A/14B - Harmonisation Plan 1: Road Closure (CC05649-S7-10B) and Parking Lane Closure (CC05649-S6-16B) 2. CC05649-S3-15A/15B - Harmonisation Plan 2: Road Closure (CC05649-S7-10B) and Shuttle Flow (CC05649-S6-17B) REV 10: Sharepoint - Documents - Rev 10 - All Documents TGS Reference S6: Sharepoint - Documents - S6 - Plans prior to Barrier - All Documents S7: Sharepoint - Documents - S7 - One off Activities - All Documents
- 29 Sep 2026, 1:43 pm · Christopher Wright
This is GTG
- 25 Sep 2026, 4:06 pm · Riri D.
- 14 Sep 2026, 2:42 pm · Permits · CC05649-S3 - Rev 9 - McNab - Scape Tribune St
✓ Invoice IV0025262 (14 Sep) - Clint 1x Addt'l TGS Invoice IV0025262 from Crompton Concepts for S3- Rev 8 and Rev 9 - McNab - Scape Tribune St.eml
- 14 Sep 2026, 2:42 pm · Permits · CC05649-S3 - Rev 8 - McNab - Scape Tribune St
✓ Invoice IV0025262 (14 Sep) - Clint 2x Addt'l TGS Invoice IV0025262 from Crompton Concepts for S3- Rev 8 and Rev 9 - McNab - Scape Tribune St.eml
- 14 Sep 2026, 9:07 am · Sandy · CC05649 - NMP - McNab - Scape Tribune St (Concrete Pours)
Hi Plans folder: Plans - CC05649 Suite: NMP Save work here: NMP > Concrete Pours Project location: Scape Tribune St Quote: QU5566 Request type: New Scope: NMP Specific operations: to be completed for concrete pours early start of 4:30 am Client mark-ups/attachments: Quote QU5566 (1).pdf Re_ Quote - OOH Permit for concrete pours - Scape.eml
- 14 Sep 2026, 3:57 pm · R.R
Hi @Sandy @C.C , May I request the following info: 1. What is the schedule for the concrete pours? (Date) 2. I’ve listed the tools typically used during concrete pouring. Could you please confirm if these are the tools required and advise if any additional equipment will be needed? (WIP) file uploaded here: Sharepoint - Documents - WIP - All Documents
- 14 Sep 2026, 5:30 pm · Riri D.
@R.R I have asked the site for this and will update you one they replied back
- 15 Sep 2026, 9:13 am · Riri D.
@R.R Hi Rihana, If we have an early concrete pour in will involve the following only * Plug in pump – i.e. truck with hopper and pump connected to concrete line pump. * Concrete truck – when pouring * Concrete vibrator * Person hoist – electric * Satellite pump from top of jump – electric It will be mainly the set up with pump arriving, connection of line and then the use of the hoist to get men up. Concrete would be called and will vary arriving on site between 6.00am and 6.30am and would start pump shortly after it arrival. ------------------------------ Hi Rihana, Following on from Matt’s email, we don’t have dates at this stage. We are planning ahead given it takes 6-8 weeks to get approval so we have a permit available over summer if we need it. RE_ Quote - OOH Permit for concrete pours - Scape.eml
- 15 Sep 2026, 12:38 pm · R.R
Hi @A.A @C.C , NMP for concrete pours uploaded here: Sharepoint - Documents - Concrete Pours - All Documents Thank you. Accounts: 1x NMP
- 18 Sep 2026, 11:31 am · Riri D.
@Christopher Wright could you please assist in reviewing this? Thanks!
- 23 Sep 2026, 12:49 pm · Christopher Wright
This appears to be GTG
- 14 Sep 2026, 3:57 pm · R.R
- 10 Sep 2026, 7:15 pm · Riri D. · CC05649-S3 - Rev 9 - McNab - Scape Tribune St
Chelsea team catch up 10-09-26.pdf Invoice along with S3- Rev 8 1xAdd'l TGS CC05649-S3-17A/17B - Concrete Pouring - Shuttle Flow
- 10 Sep 2026, 7:14 pm · Riri D. · CC05649-S3 - Rev 8 - McNab - Scape Tribune St
Chelsea team catch up 10-09-26.pdf Invoice along with S3- Rev 9 2xAdd'l TGS (S3-Rev08-14A/B & S3-Rev08-15A/B)
06Every file and folder
1,232 files in 282 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|