← All projectsCC05917
Project portal · built 17 Nov 2026, 10:03 am AEST · Permit in progress We supply traffic control

The Base Robina, Robina Drive

Kane Construction

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Kane Construction on this project at The Base, Robina, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 10; 3 TGS suites on file (S0 Rev 01, S1 Rev 08, S2 Rev 03). On the permit boards: 2 permits in force and 2 in progress. Monday holds 12 requests for this job (0 new, 12 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Kane Construction
Crompton job
CC05917
Location
The Base, Robina, QLD
LGA / authority
City of Gold Coast
Project coordinator
C.C
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS, Swept Path
Permits (Monday)
2 in force · 2 in progress
Last activity
16 Nov 2026
Files on SharePoint
406 in 122 folders

What needs attention now

  1. Permit in progress: Pot Holing Works (Gold Coast) is Initial Pending. Follow up 27 Nov 2026. Wanted from 30 Nov 2026.
  2. Permit in progress: CMP Application (CMP / LONO) is Council Pending.

PPermits

6 permit lines on the Monday permit boards: 2 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Pot Holing Works
Team Declan · Gold Coast Permits - Dec
Gold CoastDate SpecificIn progress
Initial Pending
30 Nov 2026 – 15 Dec 20269 Nov 202627 Nov 2026
CMP Application
Team Declan · BCC CMP Lodgement / GCC LONO Lodgement - Dec · matched by name
CMP / LONODate SpecificIn progress
Council Pending
Low Impact Daily Operational Permit
Team Declan · Gold Coast Permits - Dec
Gold CoastOngoingIn force
Done
20 Oct 2026 – 19 Jan 202716 Oct 20268 Dec 2026
Medium Impact Daily Operational Permit
Team Declan · Gold Coast Permits - Dec
Gold CoastOngoingIn force
Done
20 Oct 2026 – 19 Jan 202723 Oct 20268 Dec 2026
LONO Application
Team Declan · BCC CMP Lodgement / GCC LONO Lodgement - Dec · matched by name
CMP / LONODate Specific
Done
Footpath Reconstruction
Team Declan · Gold Coast Permits - Dec
FootpathDate SpecificExpired
Done
27 Oct 2026 – 6 Nov 202623 Oct 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

12 requests since 1 Sep 2025: 0 for new plans and 12 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC05917-S1 - Rev 7 - Kane Constructions - The Base Robina, Robina DriveAmendmentS1Rev 07Closed
No Charge
6 Nov 20268 Nov 2026
CC05917-S1 - Rev 6 - Kane Constructions - The Base Robina, Robina DriveAmendmentS1Rev 06Closed
No Charge
27 Oct 202629 Oct 2026
CC05917-S1 - Rev 5 - Kane Constructions - The Base Robina, Robina DriveAmendmentS1Rev 05Closed
No Charge
1 Oct 20263 Oct 2026
CC05917-S1 - Rev 4 - Kane Constructions - The Base Robina, Robina DriveAmendmentS1Rev 04Invoiced
Invoiced
13 Aug 202615 Aug 2026
CC05917-S1+S2 - Kane Constructions - The Base Robina, Robina DriveCouncil RFIS1Closed
No Charge
8 May 202610 May 2026
CC05917-S1 - Rev 3 - Kane Constructions - The Base Robina, Robina DriveAmendmentS1Rev 03Closed
No Charge
8 Apr 202610 Apr 2026
CC05917-S1 - Rev 2 - Kane Constructions - The Base Robina, Robina DriveCouncil RFIS1Rev 02Closed
No Charge
10 Mar 202612 Mar 2026
CC05917-S2 - Rev 1 - Kane Constructions - The Base Robina, Robina DriveAmendmentS2Rev 01Invoiced
Invoiced
10 Mar 202612 Mar 2026
CC05917-S1 - Kane Constructions - The Base Robina, Robina DriveCouncil RFIS1Closed
No Charge
12 Feb 202614 Feb 2026
CC05917-S2 - Kane Constructions - The Base Robina, Robina DriveAmendmentS2Invoiced
Invoiced
10 Feb 202612 Feb 2026
CC05917-S1 - Kane Constructions - The Base Robina, Robina DriveAmendmentS1Invoiced
Invoiced
1 Dec 20253 Dec 2025
CC05917 -Concept plans - Rev 1 - Kane Constructions - The Base Robina, Robina DriveAmendmentRev 01Invoiced
Invoiced
1 Sep 20253 Sep 2025

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • !! Archived
  • !! Archive and Updates !!
  • CA George Tarabay0468 948 795
  • CA Email Address
  • CA Phone Number
  • PM Luke Driscoll0459 145 362
  • PM Email Address
  • PM Phone Number
  • SM George Tarabay0468 948 795
  • SM Email Address
  • SM Phone Number
  • ACCOUNTSaccountsqld@kane.com.au
  • CA Sheldon Van Rensburgsvrensburg@kane.com.au
  • PM James Macdonald0457 838 944
  • Projc. Engr. Name - Email
  • Projc. Engr. Name - Phone Number
  • SM Ryan Woods0447 605 941
  • Sheldon Van Rensburgsvrensburg@kane.com.au
  • Site Engr. Name - Email
  • Site Engr. Name - Phone Number
  • WHS Luke Whippy0487 227 020
  • WHS Email Address
  • WHS Phone Number
  • ldriscoll@kane.com.auldriscoll@kane.com.au

Crompton Concepts

  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi Rudra, TMP 8.9 vs 12B: * Footpath. 12B closes the footpath (Footpath Closed / Use Other Footpath on both ends), but Table 45 says "footpath will not be affected" for every option. The summary also says pedestrians stay under the gantry and get held for large deliveries. That's the daily arrangement wording. Please rewrite Table 45 and the summary for the footpath closure that's actually on 12B. * Table 44. Both shoulder closure ("sufficient width on verge") and lane closure are marked Adopted. It's a lane closure on 12B, so only that should be adopted. "Short term: not practical" also doesn't really fit potholing, which is usually short term. Please give a proper reason either way. * Table 42. "5 to 10 deliveries per day", frequency "Daily" and vehicles "TBA" are copied over. For potholing it should be the vac truck plus support vehicle, date specific. Leave the dates TBA until Kane confirms. * Table 43. End of queue says "Yes" then "N/A". Pick one. * Table 43 to 45 captions still say "Daily Arrangement". Change them to Potholing Works. 12B: * There's an ERW with a 60 plate, but the map only shows 50 and 70 zones. Please check which approach that's on and correct it. * Title says "Robin Town Centre Drive". Missing the "a". * Designer on 12B shows Kerby. If you drew it, put your name on it. @Rudra Khadka @D.B

  2. no charge

  3. Plans folder: Plans - CC05917 Suite: S1 Save work here: TGS > Rev 07 TMP > Rev 10 Project location: The Base Robina, Robina Drive Quote: QU5793 Job request form: none Request type: Additional TGS and TMP amendment Scope: TGS & TMP Please also see the attached quote for a TGS required for the potholing works Quote QU5793.pdf Fw_ Pot Holing Works.eml

    • 6 Nov 2026, 6:58 pm · Rudra Khadka

      Hi @D.B @Christopher Wright Task is completed and uploaded to its respective folder. Link: TGS > Rev 07 TMP > Rev 10 Accounts, 1 x Additional TGS ( CC05917-S1-12A/B) 1 x TMP ( Updated 12B on CTMP) Thank You!

    • 9 Nov 2026, 5:41 pm · D.B

      Hi @Rudra Khadka Can you please update the TMP to reflect all the new information included in the TGSs? There seems to be some information on the TGSs that hasn't been incorporated into the TMP for all the TGS's in the set.

    • 9 Nov 2026, 5:41 pm · D.B

      what you did looks perfect, the TMP just doesn't line up correctly with the TGS

    • 9 Nov 2026, 7:37 pm · Rudra Khadka

      Hi @D.B Changes are made on TMP as per TGS. It looks like the previous planner didn't reflect the changes on TMP. Mainly TGS are double checked and updated on TMP and is uploaded to its respective folder. Kindly, let me know if it requires further changes. Thank You!

    • 12 Nov 2026, 12:39 pm · Rudra Khadka

      Hi @S.B Corrections are made as per above and uploaded to its respective folder. Thank You!

  4. Hi team! Please save work here: Plans - CC05917 TGS > Rev 06 TMP > Rev 09 Suite: S1 Project folder: The Base Robina, Robina Drive Thanks, Iris (271026)

    • 27 Oct 2026, 5:57 pm · Riri D.

      @D.B please add in the details for the allocation

    • 28 Oct 2026, 2:52 pm · Marie Est

      Hello team, may I have more information in this revision? Thanks.

    • 29 Oct 2026, 9:20 am · D.B

      Hi @Marie Est please action the below amendment we are going to get engineering but following Aarons diagram below. we are changing 3B & 4B. from this long taper to the below taper please action both the TMP and TGS

    • 29 Oct 2026, 10:48 am · Marie Est

      Hello @D.B and @Riri D. , may I have a word file document of TMP? I can't seem to access it. Thanks. - This is all good.

    • 29 Oct 2026, 12:21 pm · Marie Est

      Hello @Christopher Wright, The TMP and TGS S1 has already been amended and uploaded to the folder. Please review it at your convenience. * 1x TGS Amendment on S1 - CC05917-S1-3B and 4B - (Rev 6) - Shorten the taper used and applied the 200m rule. * 1x TMP Amendment on CC05917 (Rev 9) - Added correct figures. Link: TGS - https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... TMP - https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... If there are any updates or further changes needed, please let me know. Thank you.

    • 29 Oct 2026, 1:53 pm · Christopher Wright

      Hi @Marie Est thanks for the work, after reviewing i can see that the taper has been shortened but and the lane stat has been moved closer to the work site on this TGS, Can you move the lane stat on all other TGS's please. For the tower crane TGS (Road Closure) that will remain as is just please make the red base indicating that this is a long term sign to a temp sign. (change colour to black)

    • 29 Oct 2026, 3:42 pm · Marie Est

      Hello @Christopher Wright, The TMP and TGS S1 are already completed for internal amendment. * 1x TGS Amendment on S1 - CC05917-S1 - (Rev 6) - Applied all the long term signs on all TGS to cover and make the Lane Stat sign on Tower Installation as temporary sign. * 1x TMP Amendment on CC05917 (Rev 9) - Added correct figures for all TGS. Link: https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... If there are any updates or further changes needed, please let me know. Thank you.

    • 30 Oct 2026, 10:22 am · Christopher Wright

      This is GTG @D.B

  5. Hi @D.B @Christopher Wright, For CC05917-S1 - Rev 5 - Kane Constructions - The Base Robina, Robina Drive, I've added two additional TGS for footpath demolition and reconstruction works. This is reflected in the TMP as well as all relevant info. I've adjusted the dates also for gantry install to reflect what was stated in the email and had adjusted the CC numbers of the harmonisation plan. Accounts: 2xTGS Add'l 1xTMP Amendment 1xRA Amendment Link: TGS: Rev 05 TMP: Rev 07 It is now available for review. Thanks!

    • 2 Oct 2026, 10:28 am · Christopher Wright

      Hi @KB.R The "Stop Here When Directed" signs are missing and please remember to not put signs on intersection corners as turning motorist will not be able to clearly see the signs.

    • 2 Oct 2026, 10:40 am · KB.R

      Hi @Christopher Wright, these changes were not noted in this Monday line. This was the approved plans from before so I've kept it as is. Also, I believe the signs near the intersection are long-term signs that are currently implemented on site. This is also a part of the harmonisation plan made to accommodate existing worksite signs. I can add in the missing SHWD signs. Please let me know your thoughts on what to amend following what I've noted here.

    • 2 Oct 2026, 11:42 am · KB.R

      As discussed over in Teams, I've just added the missing SHWD signs from setups where required. I've kept the long-term signs as confirmed with Chris. Amended TGS and TMP are now uploaded on SharePoint. Thanks! @Christopher Wright

    • 2 Oct 2026, 11:43 am · Christopher Wright

      @KB.R Thanks mate, this is GTG

  6. Hi team! Please save work here: Rev 05 TMP Rev 06 Suite: S1 Project folder: The Base Robina, Robina Drive Instructions: 2x new TGS's added to the TMP 1 for footpath occupation during the day during live works pedestrians will be sent across the both intersections, no lane closures, and one for afterhours TGS keep the footpath occupied with footpath detour still in place please. Thanks - Shaz

  7. IV0025101

06Every file and folder

406 files in 122 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved