← All projectsCC05937
Project portal · built 17 Nov 2026, 10:03 am AEST · Permits in force

Bulcock St, Caloundra

GVG

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for GVG on this project at 1 Bulcock St, Caloundra, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 10; 4 TGS suites on file (General no rev, S1 Rev 09, S2 Rev 09, S3 Rev 00). On the permit boards: 2 permits in force and 0 in progress. Monday holds 14 requests for this job (1 new, 13 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
GVG
Crompton job
CC05937
Location
1 Bulcock St, Caloundra, QLD
LGA / authority
Sunshine Coast Region
Project coordinator
K.R
Latest planner · TMD
—
Monday project status
New
Deliverables
Council Road Permit, Footpath Permit, Police Permit, RA, TA, TGS, TMP, Traffic Control
Permits (Monday)
2 in force · 0 in progress
Last activity
6 Nov 2026
Files on SharePoint
404 in 130 folders

What needs attention now

  1. Extension due: Translink (Translink) expires 30 Nov 2026.

PPermits

2 permit lines on the Monday permit boards: 2 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Translink
Team Ethan · Various Regional Councils - Ethan
TranslinkOngoingIn force
Done
5 Jan 2026 – 30 Nov 20265 Jan 2026
SCC – Road
Team Ethan · Various Regional Councils - Ethan
Register: Ext 1 · App Email Renewal · To Follow permit folder
Regional councilOngoingIn force
Done
28 Sep 2026 – 28 Sep 20286 Oct 202627 Oct 202727 Oct 2027

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

14 requests since 25 Sep 2025: 1 for new plans and 13 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC05937-S2 - Rev 5 - GVG - 1 Bulcock St, CaloundraAmendmentS2Rev 05Invoiced
Invoiced
21 Sep 202623 Sep 2026
CC05937-S2 - Rev 4 - GVG - 1 Bulcock St, CaloundraAmendmentS2Rev 04Invoiced
Invoiced
16 Sep 202618 Sep 2026
CC05937-S2 - Rev 3 - GVG - 1 Bulcock St, CaloundraAmendmentS2Rev 03Invoiced
Invoiced
10 Sep 202612 Sep 2026
CC05937 - S2 - Rev 2 - GVG - 1 Bulcock St, CaloundraAmendmentS2Rev 02Invoiced
Invoiced
10 Aug 202612 Aug 2026
CC05937 - S1 - Rev 9 - GVG - Bulcock St CaloundraAmendmentS1Rev 09Invoiced
Invoiced
22 Jun 202624 Jun 2026
CC05937- S3 - R0 - GVG - 1 Bulcock St, CaloundraAmendmentS3Invoiced
Invoiced
15 May 202617 May 2026
CC05937 - S1 - Rev 8 - GVG - 1 Bulcock St, CaloundraAmendmentS1Rev 08Invoiced
Invoiced
21 Apr 202623 Apr 2026
CC05937 - S1 - Rev 7 - GVG - 1 Bulcock St, CaloundraAmendmentS1Rev 07Closed
No Charge
20 Mar 202622 Mar 2026
CC05937 - S1 - Rev 6 - GVG - 1 Bulcock St, CaloundraAmendmentS1Rev 06Invoiced
Invoiced
11 Mar 202613 Mar 2026
CC05937 - S1 - Rev 5 - GVG - 1 Bulcock St, CaloundraCouncil RFIS1Rev 05Invoiced
Invoiced
26 Feb 202627 Feb 2026
CC05937 - S1 - Rev 3/4 - GVG - 1 Bulcock St, CaloundraAmendmentS1Rev 03Closed
No Charge
30 Jan 20261 Feb 2026
CC05937 - S1 - Rev 2 - GVG - 1 Bulcock St, CaloundraAmendmentS1Rev 02Invoiced
Invoiced
12 Dec 202514 Dec 2025
CC05937- S1 & S2 - Rev 01 - GVG - 1 Bulcock St, CaloundraCouncil RFIS1Rev 01Closed
No Charge
9 Oct 202510 Oct 2025
CC05937-S2 - R0 - GVG - 1 Bulcock St, CaloundraNew plansS2Invoiced
Invoiced
25 Sep 202527 Sep 2025

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • 1. Archived Contacts
  • Bob Button (Project Manager)0439 559 206
  • Brad Crook0482 580 640
  • Ian Walters (Construction Manager)0456 579 870
  • Mike Muir Mobile0401 253 331
  • PM - Mike Muirmike.muir@gvg.com.au
  • ACCTSinvoices@gvg.com.au
  • All ongoing amendment fees invoice Mainland Civil
  • Katrina Jose (CA)0436 475 222
  • Matthew Alford (PM)0409 941 197
  • Siv Sivagnanam (Admin)0433 963 197

Crompton Concepts

  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 14 Oct 2026, 2:37 pm · Permits · CC05937-S2 - Rev 5 - GVG - 1 Bulcock St, Caloundra

    ✓ Invoice sent (14 Oct) - Clint 1x add'l TGS (TGS 13) - to cover site inactive set-up during Sunday, holidays or events. Invoice IV0025562 - 1 Bulcock St, Caloundra .eml

  2. 13 Oct 2026, 5:09 pm · Permits · CC05937-S2 - Rev 4 - GVG - 1 Bulcock St, Caloundra

    IV0025553 sent to client - Shaz 1310 1x tmpa 2x 5tgs Invoice IV0025553 - 1 Bulcock St, Caloundra.eml

  3. 12 Oct 2026, 5:05 pm · Ethan Mathews · CC05937-S2 - Rev 5 - GVG - 1 Bulcock St, Caloundra

    @Permits / @Lexi R / @Riri D. ACCOUNTS - Please invoice as per below: Accounts: 1x add'l TGS (TGS 13) - to cover site inactive set-up during Sunday, holidays or events.

  4. 12 Oct 2026, 4:52 pm · Ethan Mathews · CC05937-S2 - Rev 4 - GVG - 1 Bulcock St, Caloundra

    @Permits / @Lexi R / @Riri D. ACCOUNTS - Please invoice as per below Account: 2xTGS Add'l - CC05937-S2-11A/B - Daily Arrangements - Site Active - CC05937-S2-12A/B - Daily Arrangements - Site Active 1xTMP Amendment

  5. 29 Sep 2026, 9:44 am · Permits · CC05937-S2 - Rev 3 - GVG - 1 Bulcock St, Caloundra

    IV0025419 sent to client - SHaz 0610 1x 5tgs 1x tmpa Invoice IV0025419 - CC05937 - GVG - 1 Bulcock St, Caloundra.eml

  6. 21 Sep 2026, 10:41 am · Permits · CC05937-S2 - Rev 5 - GVG - 1 Bulcock St, Caloundra

    Hi @J.R Please save work here: S2 - Construction Phase > Rev 05 Project folder: Bulcock St, Caloundra Please create x1 additional aftercare TGS option which shows aftercare requirements for Sunday's and when events, public holidays are on and both Knox Ave and Bombala Terrace are required to be re-opened. Please show all covers applicable to the long term aftercare signage as per TGS: CC05937-S2-12B and also utilize TGS: CC05937-S1-10B (Revision 4) as the "Work Area / Site inactive Area" that will be in place on Sunday's and Public Holidays / Event Days. Please keep these parking bays open on Knox Ave After hours and only show the footpath closure on both frontages, however keeping the parking bays closed on Bombala Terrace and in the triangular car park will also remain closed: Thank you - SHaz

    • 21 Sep 2026, 11:59 am · J.R

      Hi @Christopher, additional TGS (TGS 13) is now available for review. Thank you! Accounts: 1x add'l TGS (TGS 13) - to cover site inactive set-up during Sunday, holidays or events.

    • 21 Sep 2026, 1:29 pm · Christopher Wright

      This is GTG @Ethan Mathews

  7. 17 Sep 2026, 2:25 pm · Ethan Mathews · CC05937-S2 - Rev 3 - GVG - 1 Bulcock St, Caloundra

    @Lexi R @Permits @Riri D. ACCOUNTS - Please invoice as per below: Accounts: 1x TGS CC05937-S2-10B - Bollard Installation Works 1x TMP (Amendment)

  8. 16 Sep 2026, 2:52 pm · Permits · CC05937-S2 - Rev 4 - GVG - 1 Bulcock St, Caloundra

    Hi, Please see instructions below: Client: GVG Constructions Project: Bulcock St, Caloundra Address / Location: Knox Avenue / Bombala Terrace, Caloundra Please create x2 new TGS (Site Active and Site Inactive) as per below: This TGS will be their full time daily arrangement for the life of their project and will be used for all construction activities including concrete pours, crane lifts / Panel lifts, General and Oversized deliveries etc. Please read the below carefully to understand the full scope and requirements for this TGS: Please have the below Zebra Crossing found on TGS: CC05937-S1-9B (Revision 4): Rev 04 Added to this new Site Active & Inactive TGS Please make sure that this crossing here is not included as it is being replaced with the above: Please have TGS: CC05937-S1-6B located here also in Revision 4: Rev 04 and use this TGS as the base TGS for this allocation Please show all long term signage with a border around it to easily identify which is long term and which will be temporary, noting that this closure will be in place long term for the duration of the project. Noting also that this closure is 24x7 Monday - Saturday which means that the Aftercare will need to show the road closed afterhours also so please ensure all signage that needs to be covered afterhours is noted. Could We please also have a haulage route added to the TGS if there is adequate space on the plan similar to this one however in line with the closures of this full road closure on Knox…

    • 17 Sep 2026, 9:12 pm · B.R

      Hi @Christopher Wright, This is uploaded and for review. Thank you! Folder Link: Bulcock St, Caloundra TGS > Rev 04 - CC05937-TGS-S2-Rev04.pdf TMP > Rev 04 - CC05937-CTMP-S2-Rev04- 1 Bulcock St, Caloundra.pdf Account: 2xTGS Add'l - CC05937-S2-11A/B - Daily Arrangements - Site Active - CC05937-S2-12A/B - Daily Arrangements - Site Active 1xTMP Amendment

    • 18 Sep 2026, 12:20 pm · Christopher Wright

      This is GTG @Ethan Mathews

  9. 11 Sep 2026, 4:55 pm · Leo Escoton · CC05937-S2 - Rev 3 - GVG - 1 Bulcock St, Caloundra

    Hi @Ethan Mathews for review Links: TGS TMP Accounts: 1x TGS 1x TMP Thank you!

    • 14 Sep 2026, 8:46 am · Ethan Mathews

      @Leo Escoton Good Morning Leo, looks good however the location is incorrect, this is the correct roundabout they are working on: Please amend accordingly for the works to be as per that round-about, also can you please change the contact details for all TGS's to now be: Matthew Alford (Project Manager) - 0409 941 197 - matthew.alford@gvg.com.au Mike Muir is no longer on this job. Thank you. @Christopher Wright please keep an eye out this afternoon for when this is ready for TMD review as this needs to go out today please. Thanks Team.

    • 14 Sep 2026, 10:05 am · Leo Escoton

      Hi @Ethan Mathews, all comments have been amended. TGS: Sharepoint - Documents - Rev 03 - All Documents TMP: Sharepoint - Documents - Rev 03 - All Documents Thank you!

    • 14 Sep 2026, 11:17 am · S.B

      @Leo Escoton GTG

    • 14 Sep 2026, 11:33 am · Ethan Mathews

      @S.B Thank you Sanju and @Leo Escoton - Sending plans to Client now for review. @Riri D. - Invoicing notes to come shortly - FYI

  10. 10 Sep 2026, 9:52 am · Permits · CC05937-S2 - Rev 3 - GVG - 1 Bulcock St, Caloundra

    Hi, May I please have x1 new TGS put together for hold & release on Minchinton St round about for Flexible bollard installation on the round about. Will need to just show the roundabout as the work area and delineate the round about with cones and will need to cone off some car parking for the labourer's ute to be parked near by so its close for them to unload the bollards and walk them over to the round about while traffic is held for when he crosses the road into the round about: Please also amend the TMP and save below: Plans folder:3. Plans - CC05937 Suite: S2 - Construction Phase Save work here: TGS >Rev 03 TMP >Rev 03 Project location: Bulcock St, Caloundra Quote: N/A

06Every file and folder

404 files in 130 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved