Lylo - 107 Gold Coast Hotel, Surfers Paradise

McNab

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for McNab on this project at 7 Staghorn Ave, Surfers Paradise, QLD. 2 Monday requests are open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 06; 3 TGS suites on file (S0 Rev 01, S1 Rev 10, S2 Rev 00). On the permit boards: 2 permits in force and 5 in progress. Monday holds 16 requests for this job (0 new, 16 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
McNab
Crompton job
CC05951
Location
7 Staghorn Ave, Surfers Paradise, QLD
LGA / authority
City of Gold Coast
Project coordinator
C.C
Latest planner · TMD
Leo Escoton · Christopher Wright
Monday project status
New
Deliverables
Council Road Permit, TGS
Permits (Monday)
2 in force · 5 in progress
Last activity
16 Nov 2026
Files on SharePoint
495 in 149 folders

What needs attention now

  1. Urgent Review comments to action: CC05951-S1 - Rev 10 - McNab - Lylo Gold Coast Hotel, Surfers Paradise. Required by 5 Nov 2026 (overdue). Planner: Leo Escoton · TMD: Christopher Wright · Last note (10 Nov 2026, S.B): “Hi Team, From the instructions, not done yet: * Bollards on 2B/3B/4B/5B. Riri asked for bollards to create a visual for drivers entering Staghorn. There are none on 2B, 3B or 4B…”
  2. Urgent TMD approved, ready to issue: CC05951 - NMP - Rev 3 - McNab - Lylo Gold Coast Hotel, Surfers Paradise (Tower Crane Installation). Required by 31 Oct 2026 (overdue). Planner: Sean B · TMD: Christopher Wright · Last note (12 Nov 2026, Sean B): “Feedback addressed as follows: TMP>Amendments for Tower Crane schedule NMP/Letter >Rev 03 * Neighbour letter hours are wrong. It still says out of hours 7:00pm to 3:00am (both the…”
  3. Permit in progress: Full Road: Tower Crane Install (Gold Coast) is Initial Pending. Follow up 25 Nov 2026. Wanted from 1 Dec 2026.
  4. Permit in progress: AHB: Tower Crane Install (Gold Coast) is Initial Pending. Follow up 25 Nov 2026. Wanted from 1 Dec 2026.
  5. Permit in progress: Daily Operational (Gold Coast) is Council Pending. Follow up 23 Nov 2026. Wanted from 15 Dec 2026.
  6. Permit in progress: McNab- Lylo Gold Coast Hotel- GCCC LONO (CMP / LONO) is CMP App Pending.
  7. Permit in progress: McNab- Lylo Gold Coast Hotel- CMP (CMP / LONO) is Council Pending.

PPermits

8 permit lines on the Monday permit boards: 2 in force, 5 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Full Road: Tower Crane Install
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificIn progress
Initial Pending
1 Dec 2026 – 7 Dec 20265 Nov 202625 Nov 2026
AHB: Tower Crane Install
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificIn progress
Initial Pending
1 Dec 2026 – 7 Dec 202615 Oct 202625 Nov 2026
Daily Operational
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingIn progress
Council Pending
15 Dec 2026 – 21 Mar 20279 Nov 202623 Nov 20267 Feb 2027
McNab- Lylo Gold Coast Hotel- GCCC LONO
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONOIn progress
CMP App Pending
14 May 2026
McNab- Lylo Gold Coast Hotel- CMP
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONOIn progress
Council Pending
Gantry Occupation
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingIn force
Done
13 Nov 2026 – 12 Feb 202716 Nov 20264 Jan 2027
KDR Signage
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingIn force
Done
12 Oct 2026 – 12 Apr 202713 Oct 202622 Mar 2027
KDR – Tower Crane Install
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificApproved, starts later
Done
1 Dec 2026 – 7 Dec 202610 Nov 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 0630 Oct 20265CC05951-CTMP-S1-Rev06.pdf
—TMPRev 0812 Nov 20265CC05951-TMP-S1-Rev08.pdf
—NMPRev 0312 Nov 20263Neighbour_Construction_Notice.pdf
—RARev 0621 Oct 20265F-CC05951-RA.pdf
—Letter to residentsno rev14 Jul 20260Letter to Residents - LyLo v3.pdfLetter to Residents - LyLo v4.pdf
GeneralWorkzone planno rev15 Jul 20260Approval for extended workzone from Neighbour.pdf
S0TGSRev 0124 Sep 20252CC05951-TGS-Concept Plan-Rev01.pdf
S1TGSRev 1011 Nov 20268CC05951-TGS-S1-Rev10.pdf
S1NMPRev 0312 Nov 20264CC05951-S1-NMP-Rev03 NEW.pdfCC05951-S1-NMP-Rev03.pdf
S2TGSRev 0010 Jun 20261CC05951-TGS-S2-Rev00.pdf

03Requests on Monday

16 requests since 23 Sep 2025: 0 for new plans and 16 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC05951-S1 - Rev 10 - McNab - Lylo Gold Coast Hotel, Surfers Paradise UrgentAmendmentS1Rev 10Review amendments
Working on it
3 Nov 20265 Nov 2026Leo EscotonChristopher Wright
CC05951 - NMP - Rev 3 - McNab - Lylo Gold Coast Hotel, Surfers Paradise (Tower Crane Installation) UrgentCouncil RFINMPRev 03TMD approved
TMD Approved
29 Oct 202631 Oct 2026Sean BChristopher Wright
CC05951 - NMP - Rev 2 - McNab - Lylo Gold Coast Hotel, Surfers Paradise (Tower Crane Installation) UrgentAmendmentNMPRev 02Closed
No Charge
26 Oct 202628 Oct 2026
CC05951-S1 - Rev 9 - McNab - Lylo Gold Coast Hotel, Surfers Paradise UrgentAmendmentS1Rev 09Invoiced
Invoiced
21 Oct 202623 Oct 2026
CC05951 - NMP - Rev 1 - McNab - Lylo Gold Coast Hotel, Surfers Paradise (Tower Crane Installation) UrgentAmendmentNMPRev 01Closed
No Charge
15 Oct 202617 Oct 2026
CC05951-S1 - Rev 8 - McNab - Lylo Gold Coast Hotel, Surfers Paradise UrgentCouncil RFIS1Rev 08Closed
No Charge
14 Oct 202616 Oct 2026
CC05951-S1 - Rev 7 - McNab - Lylo Gold Coast Hotel, Surfers ParadiseAmendmentS1Rev 07Invoiced
Invoiced
30 Sep 20262 Oct 2026
CC05951 - NMP - McNab - Lylo Gold Coast Hotel, Surfers Paradise (Tower Crane Installation)AmendmentNMPInvoiced
Invoiced
24 Sep 202626 Sep 2026
CC05951-S1 - Rev 5 - McNab - Lylo Gold Coast Hotel, Surfers Paradise UrgentAmendmentS1Rev 05Not proceeding
Not proceeding
15 Sep 202617 Sep 2026
CC05951-S1 - Rev 4 - McNab - Lylo Gold Coast Hotel, Surfers ParadiseCouncil RFIS1Rev 04Invoiced
Invoiced
17 Jul 202619 Jul 2026
CC05951 - S1 - Rev 3 - McNab - Lylo Gold Coast Hotel, Surfers ParadiseCouncil RFIS1Rev 03Closed
No Charge
8 Jul 202610 Jul 2026
CC05951-S1 - Rev 2 - McNab - Lylo Gold Coast Hotel, Surfers ParadiseCouncil RFIS1Rev 02Closed
No Charge
25 Jun 202627 Jun 2026
CC05951-S1 - McNab - Lylo Gold Coast Hotel, Surfers ParadiseCouncil RFIS1Closed
No Charge
11 Jun 202613 Jun 2026
CC05951 -S2 - McNab - Lylo Gold Coast Hotel, Surfers ParadiseAmendmentS2Invoiced
Invoiced
27 May 202629 May 2026
CC05951-S1 - McNab - Lylo Gold Coast Hotel, Surfers ParadiseAmendmentS1Invoiced
Invoiced
28 Apr 202630 Apr 2026
CC05951-S0 - Rev 1 - McNab - Lylo Gold Coast Hotel, Surfers ParadiseAmendmentS0Rev 01Invoiced
Invoiced
23 Sep 202525 Sep 2025

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • Jamie Boston0410 372 549
  • Terry Boston0497 933 535
  • bostontreecare@gmail.combostontreecare@gmail.com

Crompton Concepts

  • Leo EscotonPlanner
  • Christopher WrightTMD
  • Sean BPlanner
  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Feedback addressed as follows: TMP>Amendments for Tower Crane schedule NMP/Letter >Rev 03 * Neighbour letter hours are wrong. It still says out of hours 7:00pm to 3:00am (both the construction hours and network impact lines). NMP and TMP say 4:00am to 6:30pm. Please update the letter to match. Actioned - Updated letter. * NMP day of the week. "2nd to 8th December (Wednesday to Monday)". The 8th is a Tuesday. It's in two spots (Hours of Work and Work Schedule). Actioned -updated to tuesday * Weekend in the contingency. 2 to 8 Dec covers Sat 5th and Sun 6th, but the letter and TMP say no weekend works unless approved. Riri, can you confirm if we're applying for the weekend? If not, we should say weekdays only. pending info @Riri D. fyi * Notice period. NMP says 5 days notice to neighbours, TMP 7.5 says Council needs 7 calendar days. Make the NMP 7 days. Actioned - updated to 5 days * NMP says the notification goes to "BCC". Should be City of Gold Coast. Actioned - updated to COGC TMP: * Table 55 has "Working near tram line: No", but the text below talks about QPS at Surfers Paradise Blvd for light rail and KDR LONO. Change it to Yes and reference those measures. Actioned - updated table 55 * 8.7 mentions taking the car parking overnight the night before. That isn't in the NMP, letter or any TGS. Needs to be covered. Updated * Table 54 duration says "7 Days (Contingency)". Make it 1 day plus 7 days contingency. Removal date shows 05/07/2027 but the text says TBC. Pick one.…

    • 12 Nov 2026, 12:46 pm · Christopher Wright

      This appears to be GTG @Ethan Mathews

    • 16 Nov 2026, 7:29 am · Ethan Mathews

      @Christopher Wright - Thank you mate, @Riri D. Can you please confirm if this has gone back to the client? I believe Shaz or Clint has sent this back to Council on Friday.

  2. Hi Team, From the instructions, not done yet: * Bollards on 2B/3B/4B/5B. Riri asked for bollards to create a visual for drivers entering Staghorn. There are none on 2B, 3B or 4B (not in the legend or manifest), and only 1 on 5B. Looks like they ended up on 1B instead (13 there). Please move them to the right sheets. * Kelly's site report. None of her points are reflected yet. The ERW signs are still on Ferny where Meriton Cypress starts, and there's nothing saying the existing detour signs on site get pulled out. Please also confirm nothing is on Pandanus. Have a chat with Chris if you're unsure how to show it. * Budds Beach note is on every sheet except 6B, please add it. Also the note says the Budds Beach signs "remain covered". Ethan, I read your comment as just noting them, not covering them. Can you confirm which you want? 1B: * Riri asked to add an option for parking lane closure only. 1B has been replaced rather than an option added. Riri, do we still need the original H&R version kept as well? * Work zone is 32m on 1B but 34m on 8A. Check both against the LONO and make them match. * 1A manifest still has a "Stop here when directed" sign. Not needed if there's no H&R. 7B aftercare: still shows Stop Here When Directed, Prepare to Stop and the boom gate warnings with no TC or portaboom on site. Make sure all the H&R signs are shown covered. Options analysis sheets (2A to 5A): these still say H&R is "unnecessary / not suitable" and pick shuttle flow, which is the…

    • 10 Nov 2026, 3:09 pm · S.B

      Hi Leo, quick clarification on Kelly's report. I can see ERW signs on the sheets, but I can't tell from the PDF whether one is at the Meriton Cypress spot on Ferny. Please just confirm against Kelly's notes rather than taking my comment as a definite error. Also on the options sheets, 2A picks shuttle flow while 3A to 5A say H&R isn't needed. Same fix either way: they all need to match the half road H&R that's drawn. Thanks! @Leo Escoton

    • 11 Nov 2026, 12:15 pm · Leo Escoton

      Hi @Ethan Mathews, @S.B and @Riri D. for review. Link: Sharepoint - Documents Additionally, here's what I check and noticed on the comments made by Sanju: Items from the instructions – Status and clarifications: * Bollards on 2B/3B/4B/5B: Bollards are already shown before the entrance to Staghorn Avenue and are reflected in the corresponding site arrangements (2B–5B). * Kelly's site report: No ERW signs are shown at the Meriton Cypress location. * Budds Beach note on 6B: The note has not been added to 6B, as it would be cut off in the printed layout. 1B: * Parking lane closure option: 1B has been revised to show parking lane closure only, replacing the previous H&R arrangement. Please confirm whether the original H&R version is still required as an additional option. * Work zone dimensions (1B vs 8A): Change 8B Work Zone to 32 m to have a cohesive Work Zone all throughout the plan * 1A…

    • 16 Nov 2026, 5:25 pm · Ethan Mathews

      @Leo Escoton Hi Leo, just a couple amendments to the signage required as per below: Please remove the Signs completely that have the question mark next to them as they are not required due to the site nextdoor for Mertion Cypress Job. Please note the others circled with the note about being long term sings, changed to show as "Red" long term signage instead of temporary signage. This will be GTG once done. This will be an internal amendment also FYI, please ensure the CTMP is amended also. Thank you - @Christopher Wright FYI

  3. * Neighbour letter hours are wrong. It still says out of hours 7:00pm to 3:00am (both the construction hours and network impact lines). NMP and TMP say 4:00am to 6:30pm. Please update the letter to match. * NMP day of the week. "2nd to 8th December (Wednesday to Monday)". The 8th is a Tuesday. It's in two spots (Hours of Work and Work Schedule). * Weekend in the contingency. 2 to 8 Dec covers Sat 5th and Sun 6th, but the letter and TMP say no weekend works unless approved. Riri, can you confirm if we're applying for the weekend? If not, we should say weekdays only. * Notice period. NMP says 5 days notice to neighbours, TMP 7.5 says Council needs 7 calendar days. Make the NMP 7 days. * NMP says the notification goes to "BCC". Should be City of Gold Coast. TMP: * Table 55 has "Working near tram line: No", but the text below talks about QPS at Surfers Paradise Blvd for light rail and KDR LONO. Change it to Yes and reference those measures. * 8.7 mentions taking the car parking overnight the night before. That isn't in the NMP, letter or any TGS. Needs to be covered. * Table 54 duration says "7 Days (Contingency)". Make it 1 day plus 7 days contingency. Removal date shows 05/07/2027 but the text says TBC. Pick one. * Heads up, Rev 08 (from Leo's Staghorn amendment) is already sitting in the TMP folder and supersedes Rev 07. Whatever goes to Council should be Rev 08. Just check 8.7 carried across properly. Tidy ups * NMP lists excavators and asphalt rollers. Not relevant for a…

    • 10 Nov 2026, 4:07 pm · C.R

      Hi @S.B and @Riri D. , can you please direct this back to @Sean B ? I am not the planner for this project and was just asked by @Ethan Mathews to do him a favor for a very very quick amendment on the working hours. I did not prepare the documents and have not gone through the request. I am also tied to 4 allocations at the moment and will have to sort things out first before I am able to look into this. Thank you!

  4. Hi @Christopher Wright and @Riri D., for review. Link: TGS TMP Accounts: 6x TGS * CC05951-S1-1B - amended for parking lane closure only, without Hold and Release, in accordance with the approved workzone lengths/widths on the LONO. * CC05951-S1-2B / 3B / 4B / 5B – Removed the detour and amended traffic arrangements to Half Road Closure with Hold and Release using a portaboom at the Ferny Ave entrance. Added visual guidance for drivers to slow down when entering Staghorn Ave, including repeater signage and speed reduction signage along Ferny Ave * CC05951-S1-7B – Amended the aftercare arrangement to reflect the updated signage. 1x TMP - Amended to reflect changes on TGS Thank you.

  5. Plans folder: 4. Plans - CC05951 Suite: S1 Save work here: TGS: Rev 10 TMP: Rev 08 Project location: Lylo - 107 Gold Coast Hotel, Surfers Paradise Quote: none Job request form: none Please see details for amendment allocation for McNab Lylo - Staghorn Avenue as per below: TGS: CC05951-S1-1B Amend to add an OPTION for parking lane closure only (No H&R just the closure in line with their approved workzone legths/widths on the LONO): TGS: CC05951-S1-2B / 3B / 4B / 5B: As per the attached snippit please amend each of these TGS's to get rid of the detour and to be specifically Half Road with Hold and Release using a portaboom on the entrance coming from Ferny Ave and also showing bollards creating a visual for drivers to slow down when entering to Staghorn Ave. Please also add repeater signage and speed reduction signage down Ferny Ave as per the mark up. NOTE: the work areas can all remain the same as per the current TGS's, however we just need to change the signage and add portaboom as advised. TGS: CC05951-S1-7B: will need to be amended to represent the aftercare showing the new signage as well

    • 5 Nov 2026, 9:00 am · Christopher Wright

      This is GTG @Ethan Mathews

    • 6 Nov 2026, 8:17 am · Ethan Mathews

      Hi @Leo Escoton could you please amend each TGS for half road with hold and release again as per below: Please add an additional repeater 40 reduction of speed signage further back so we can reduce speed further back. Portaboom needs to be moved up to essentially the work area further north to allow for maximum storage of vehicles possible when they turn into Staghorn Ave Please move the lower TC on Staghorn to the right on the footpath as indicated and add a note that TC to be positioned for maximum line of sight to avoid queuing on Ferny Ave Please just treat this as an internal amendment, thank you. @Christopher Wright - FYI

    • 6 Nov 2026, 4:41 pm · Leo Escoton

      @Ethan Mathews and @Riri D., the TGS and TMP have been amended accordingly, with all requested changes incorporated. Thank you!

    • 9 Nov 2026, 8:27 am · Ethan Mathews

      Hi @Leo Escoton just on the back of this mate, could you please review the below notes from Kelly in regards to the existing signage in the area and reach out to @Christopher Wright to help you through this: "Hi Ethan, Please see below for the signage report, with the items that need your attention. Ocean Avenue There is signage down Ocean Ave. I’m not sure what it relates to, but it did not affect the original install. Detour signs Please advise what we are doing with the detour signs as they are implemented, including the actual detour signs, so we can confirm they are accurate to the TGS below. Concerns with the new TGS * Pandanus Avenue: We cannot install signs down Pandanus, as it is the current entrance for the other site and there is no room for them. * Ferny Avenue: The End Road Work (ERW) sign on Ferny Ave will need to be removed, as per the TGS below, because this is where…

    • 9 Nov 2026, 10:58 am · Ethan Mathews

      @Leo Escoton Hi Leo, further to my message above with the harmonised signage that needs to be noted on all TGS's, these are the signs that need to be noted on the plans also and covered for Budds Beach McNab Job: Even though they don't conflict with Lylo site, we still need to note them. Thank you mate - @Christopher Wright FYI

    • 10 Nov 2026, 12:46 pm · Leo Escoton

      Hi @Ethan Mathews and @Riri D., all comments has been amended. Thank you!

  6. 1x TGS - TGS CC05951-S1-6B CTMP amendments INV IV0025820 Invoice IV0025820 from Crompton Concepts for McNab Developments (Qld) Pty Ltd.eml

  7. invoice to client Noise Management Plan_ Tower Crane Installation.eml

  8. Amendments complete CC05951-NMP-REV3 & LTR uploaded > Rev 03 CC05951-TMP-S1-REV07 uploaded > Rev 07 For TMD Review

    • 2 Nov 2026, 1:25 pm · Sean B

      Hi @Christopher Wright for review please @Riri D. FYI

  9. @Permits Please once the TMP, NMP and LTR have all been amended to show the new dates, send through for my review prior to submitting to Council. We will need to Re-apply for the Full Road Closure permit only as Hayley from CoGC is keeping the AHB permit open for us to just amend with the updated docs once provided.

  10. Hi team, Kindly see instructions provided for by @Ethan: "Hi Team, Can I please have the TMP, NMP and LTR all amended to have the new start date of 1st of December with a 1 week contingency period. Please once the TMP, NMP and LTR have all been amended to show the new dates, send through for my review prior to submitting to Council" Email attachment: Fw- LYLO - Amended Crane Install Date - 01-12-2026.eml Kindly save work here: NMP and LTR > Rev 03 TMP > Rev 07 Main Folder Link: Lylo - 107 Gold Coast Hotel, Surfers Paradise Any questions, kindly liaise with @Riri D. thanks thanks ~clint

    • 5 Nov 2026, 10:36 am · Ethan Mathews

      @C.R Hi Cleo, as discussed on teams can you please amend the NMP and CTMP to adjust the approval hours to end at 6:30pm at night. Thank you!

    • 5 Nov 2026, 10:55 am · C.R

      Hi team, sending here @Ethan's instruction for an internal revision request. This is for tracking. Also, please note that there is no existing CTMP with compiled and attached appendices. I'll be working on the existing documents only as I am unsure which goes where and what were initially discussed for this project.

    • 5 Nov 2026, 10:58 am · C.R

      Hi @Ethan, all good with this. For review. Links: NMP and LTR > Rev 03 TMP > Rev 07

  11. @Riri D. / @Lexi R / @Permits - ACCOUNTS: This one will be a no charge as we should have picked this amendment up in the initial request previously - Ethan

  12. @Lexi R / @Riri D. / @Permits - ACCOUNTS: This will be a no charge as per Ethan

  13. @Riri D. / @Permits / @Lexi R - ACCOUNTS: Please invoice as per below Accounts: 1x TGS - TGS CC05951-S1-6B CTMP amendments

  14. Hi @Ethan Mathews @Christopher Wright, I’ve amended the NMP in response to the client’s comments and made a few additional changes to maintain consistency throughout the document. I’ve also updated the contingency period in Appendix F to reflect the latest revision of the TGS for tower crane installation/demobilisation. However, I just wanted to flag that the latest revision of the TGS of this allocation still indicates 3–4 days of contingency, whereas the client’s comments specify 1–2 days only. I’ve reflected the client’s requested contingency period in the NMP, but this remains inconsistent with the latest TGS revision. Also, there is no specific noise level provided for 150t to 350t. I still used the same generic noise level for mobile crane. Our reference manual for the equipment do not include a separate noise level. Accounts: 1xNMP Amendment Link: Rev 02 It is now available for review. Thank you!

  15. ! URGENT ! Hi Team, please see allocation request below: Client: McNab - Lylo Request: Please amend the NMP to change the dates/timings as per below: Start date: Tuesday 3rd of November Finish date: Tuesday 3rd of November Start Time: 4am Finish Time: 9pm Please also adjust the mention of the 150 tonne mobile crane to be a 350 tonne mobile crane Contingency Dates will be 4th, and 5th of November (Wednesday / Thursday) Main Folder Link: Lylo - 107 Gold Coast Hotel, Surfers Paradise Please save the amended NMP here: Rev 02 Thank you. 🧡Kim

    • 29 Oct 2026, 6:32 am · Christopher Wright

      This is GTG @Ethan Mathews

  16. Hi @R.R Please save work here: TGS: Rev 09 TMP: Rev 06 Plans folder: 4. Plans - CC05951 Instructions from Ethan: as discussed can you please amend the Tower Crane TGS and CTMP accordingly: Please adjust section 8.7 Start Date to: 3rd of November (Installation) with 2 days contingency mentioned Please adjust Section 8.7 (Types of Vehicles): 350t mobile crane, semi trailer Please include additional information in the discussion in the CTMP as per below: McNab previously advised this will be a 2 day install, however now to minimise impact to the local network and community, the install will now be 1 day from 4am - 9pm and the associated after hours approvals will be sought for approval. QPS will be stationed on the intersection of Surfers Paradise Blvd and Staghorn Ave to assist with vehicle and tram movements in close proximity to the light rail and associated KDR LONO Approvals will be sought for these works. Please also note that carparking will be needed to be taken overnight the night before to ensure safety of the community during the day of the install Please see amendments required for the TGS below: Please have these amendments created as a matter of urgency. Thanks. ~Shaz

    • 22 Oct 2026, 2:17 am · R.R

      Hi @Ethan Mathews @Christopher Wright , Files have been uploaded for review. I have also created an Excel file to track the amendment list requirements. Please let me know if any further revisions are needed. Thank you. TGS: Sharepoint - Documents - Rev 09 - All Documents TMP: Sharepoint - Documents - Rev 06 - All Documents excel file:CC05951-Amendment Lists.xlsx Accounts: 1x TGS - TGS CC05951-S1-6B CTMP amendments

    • 22 Oct 2026, 8:50 am · Christopher Wright

      This is GTG @Ethan Mathews

  17. Charge Full Price NMP.

  18. Hi Team~ Please save work here: Tower Crane Installation > Rev 01 NMP: NMP Further details below. Thank you. -Shaz

    • 15 Oct 2026, 1:04 pm · Riri D.

      @B.R please amend NMP to follow their road closure crane install dates as per TGS CC05951-S1-6B Nov 3 2026 target date contingency Nov 4-7 Also amend Appendix F with the updated TGS Rev 08

    • 15 Oct 2026, 1:18 pm · Riri D.

      @B.R could you also please assist with distribution map ?? You help is greatly appreciated! 😘

    • 15 Oct 2026, 2:03 pm · Riri D.

      @B.R Draft Neighbour_Construction_Notice.pdf Distribution Map - Lylo Gold Coast Hotel, Surfers Paradise.pd

    • 15 Oct 2026, 2:16 pm · B.R

      HI @S.B, This is uploaded and for review. Kindly let me know if there are any changes. Thank you! Folder Link: NMP Files: NMP - CC05951-S1-NMP-Rev01.pdf Letter - Neighbour_Construction_Notice.pdf Distribution Map - Distribution Map - LyLo Gold Coast Hotel.pdf

  19. Sent to council - Updated Amended TGS – Lylo Gold Coast Hotel, Surfers Paradise _ Tower Crane Install.eml

  20. Hi team, Kindly save work here: TGS > Rev 08 Main Folder Link: Lylo - 107 Gold Coast Hotel, Surfers Paradise Instruction as per @Ethan Please get QPS Added to this intersection and relevant signage added. PC URGENT NOTE: Need this one done ASAP. Install is in roughly 3 weeks time so need to get this back to Council first thing tomorrow. Any questions, kindly liaise with @Riri D. thanks thanks ~ clint

    • 15 Oct 2026, 9:49 am · Riri D.

      ***************** Kennyrald Vicente ***************** done with with amendment above. Just cant tagged him on Monday Hi @S.B could you please review and sign off this as a matter of urgency? I need to send this back to council Rev 08 Thanks! 1x TGS amendment CC05951-TGS-S1-Rev08 (QPS added to the intersection and relevant signage added)

  21. ✓ Invoice IV0025563 sent (14 Oct) - Clint x1 TGS amendment x1 TMP amendment Invoice IV0025563 - McNab - Lylo Gold Coast Hotel, Surfers Paradise.eml

  22. @Lexi R / @Permits / @Riri D. ACCOUNTS - Please see details below: Please invoice: x1 TGS amendment x1 TMP amendment

  23. Posted by jaymark@cromptonconcepts.com.au (jaymark@cromptonconcepts.com.au) · @J.G via Work Flow TGS 6 updated per client's markup. Note: Used TC instead of police For review. Thank you Links * TGS - Rev 07 * TMP - Rev 05 Additional TMP was outdated. Updated TMP as well covering TGS Rev 05 to Rev 07.

  24. Hi Plans folder: Plans - CC05951 Suite: S1 Save work here: TGS > Rev 07 Project location: Lylo - 107 Gold Coast Hotel, Surfers Paradise Quote: N/A Request type: Amendment Scope: TGS Specific operations: Ask Riri or Chelsea for more info TGS to amend: TGS number Client mark-ups/attachments: Any specific files the planner needs to refer to? CC05951-TGS-S1-Rev06.pdf tower crane amendment mrkup.pdf

    • 2 Oct 2026, 11:53 am · Christopher Wright

      This is GTG

    • 13 Oct 2026, 9:01 am · Ethan Mathews

      @J.G @Christopher Wright Good Morning Team, could I please confirm why QPS wasnt added to the intersection at Surfers Paradise Blvd and Staghorn Ave? Please amend ASAP Thank you

  25. Hi @C.C @Christopher Wright, For CC05951 - NMP - McNab - Lylo Gold Coast Hotel, Surfers Paradise, data provided in the NMP are based off TMP Rev04 and TGS Rev06. There was no specific time provided so I've initially set it as 07:00 pm to 03:00 am and had noted different dates for tower crane installation and removal. This is my first time handling NMPs so I based it off of previous NMPs created, particularly for tower crane installation/removal. Together with this, I've assumed that plant and equipment involved during this process would be a Mobile Crane (150t), Boom Lift, & Delivery Truck. Please let me know if there are additional plant/equipment I should include here. Accounts: 1xNMP Link: Tower Crane Installation It is now available for review. Thank you.

  26. Hi Plans folder: Plans - CC05951 Suite: NMP Save work here: NMP > NMP > Tower Crane Installation Project location: Lylo - 107 Gold Coast Hotel, Surfers Paradise Quote: N/A Request type: NEW Scope: NMP Specific operations: Can I have an NMP allocated for tower crane installation for mcnab lylo - Chelsea

    • 24 Sep 2026, 1:45 pm · KB.R

      Hi @C.C, do you happen to know the specific time when tower crane installation/removal would occur during after-hours? Thank you!

    • 30 Sep 2026, 8:12 am · Christopher Wright

      This is GTG @C.C

  27. Posted by Ykath (ykath@cromptonconcepts.com.au) · @Y.B via Work Flow RapidPlan screenshot skipped: No plan file for this task

  28. URGENT!! Plans folder: Plans - CC05951 Suite: S1 Save work here: Rev 05 TGS > TGS Project location: Lylo - 107 Gold Coast Hotel, Surfers Paradise Quote: N/A Request type: Amendment Scope: TGS Specific operations: Remove the detour! ASAP! As per chelsea TGS to amend: 1 Client mark-ups/attachments:

    • 15 Sep 2026, 5:03 pm · Y.B

      @C.C Hi @A.A, I've amended TGS 2B as instructed. Thanks! 1x TGS amendment CC05951-S1-2B - Removed detour Sharepoint - Documents - Rev 05 - All Documents

    • 16 Sep 2026, 9:35 am · Riri D.

      @Y.B This is incorrect, we have only removed the actual detour, we still have the road closed, we still have detour ahead and road closed ahead signs. This needs to be designed as a half road closure withhold and release in both directions Re_ LYLO Gold Coast Hotel, Surfers Paradise.eml

    • 16 Sep 2026, 10:12 am · Y.B

      Hi @Riri D., as mentioned in teams yesterday, I was confirming whether to change the operation or just remove the detour. I proceeded with removing the detour as per your instruction. Will revise this plan now as instructed in the email. Thanks!

    • 16 Sep 2026, 11:15 am · Y.B

      Hi @Riri D. @A.A, TGS 2B operation has been updated to Shuttle Flow. Please let me know if further changes are needed. Thanks!

    • 18 Sep 2026, 11:29 am · Riri D.

      @Christopher Wright reassigning TMD to you as a matter of urgency

    • 18 Sep 2026, 12:54 pm · Christopher Wright

      I have requested more information on this one.

    • 23 Sep 2026, 1:23 pm · Christopher Wright

      I'm not able to sign off on any TGS with a TC preforming shuttle flow operations this close to an intersection, there is no sight distance for the motorists and the TC, this needs to be a road closure with one way detour. This also applies to all other TGS's that have been designed this way.

06Every file and folder

495 files in 149 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved