98-106 Earl St, Greenslopes

Akam Construction

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Akam Construction on this project at 98-106 Earl St, Greenslopes, QLD. 1 Monday request is open; the most pressing is at the to invoice stage; the current CTMP on SharePoint is Rev 02; 2 TGS suites on file (S1 Rev 00, S2 Rev 02). On the permit boards: 0 permits in force and 2 in progress. Monday holds 3 requests for this job (1 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Akam Construction
Crompton job
CC06028
Location
98-106 Earl St, Greenslopes, QLD
LGA / authority
City of Brisbane
Project coordinator
K.R
Latest planner · TMD
—
Monday project status
New
Deliverables
Council Road Permit, RA, Swept Path, TA, TGS, TMP, Police Permit
Permits (Monday)
0 in force · 2 in progress
Last activity
16 Nov 2026
Files on SharePoint
246 in 62 folders

What needs attention now

  1. Complete, to be invoiced: CC06028-S2 - Rev 2 - AKAM Construction - 98-106 Earl St, Greenslopes. Required by 7 Nov 2026. · Last note (16 Nov 2026, Ethan Mathews): “@Permits / @Lexi R / @Riri D. - ACCOUNTS: Please invoice as per below x4 TGS amendments: TGS 1B, 2B, 3B & 4B to change to tunnel bore methodology x1 CTMP Amendment”
  2. Permit in progress: Road (BCC road) is QPS Pending. Follow up 18 Nov 2026. Wanted from 30 Dec 2026.
  3. Permit in progress: Footpath (Tunnel Boring) (Footpath) is Council Pending. Follow up 25 Nov 2026. Wanted from 29 Jul 2026.

PPermits

2 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Road
Team Ethan · BCC Road Permits - Ethan
BCC roadOngoingIn progress
QPS Pending
30 Dec 2026 – 30 Jan 20279 Nov 202618 Nov 202614 Dec 2026
Footpath (Tunnel Boring)
Team Ethan · BCC Footpath Applications - Ethan
FootpathDate SpecificIn progress
Council Pending
29 Jul 2026 – 31 Jan 202716 Nov 202625 Nov 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

3 requests since 15 Jun 2026: 1 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06028-S2 - Rev 2 - AKAM Construction - 98-106 Earl St, GreenslopesAmendmentS2Rev 02To invoice
To Be Invoiced
5 Nov 20267 Nov 2026
CC06028-S2 - Rev 1 - AKAM Construction - 98-106 Earl St, GreenslopesAmendmentS2Rev 01Closed
No Charge
23 Oct 202625 Oct 2026
CC06028-S2 - AKAM Construction - 98-106 Earl St, GreenslopesNew plansS2Invoiced
Invoiced
15 Jun 202617 Jun 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • ACCTSaccounts@akamconstructions.com.au
  • David Dunstan (Site Manager)0439 112 762
  • Juan Romero (CA)0402 655 472

Crompton Concepts

  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. @Permits / @Lexi R / @Riri D. - ACCOUNTS: Please invoice as per below x4 TGS amendments: TGS 1B, 2B, 3B & 4B to change to tunnel bore methodology x1 CTMP Amendment

  2. Hi Anne, Against the request: * Site-side footpath. Juan's whole thread is "hold and release on footpath across our site". Hoses run across the site-side footpath, and only the opposite footpath gets fully closed. 1B now shows Footpath Closed on both sides, which leaves pedestrians with no route at all. The site side should be a pedestrian H&R with a TC walking people over the hoses (hose ramps or cable covers noted). Full closure only on the opposite side. * Hoses across the road. They're running to the other side of the road, but there's nothing on the drawing showing how they cross the carriageway (ramps, location, note). Please add it. * Vacuum truck in left lane. Please make sure it's clearly shown in the work area and that the lane closure lines up with it. * Methodology. This changed from open trench to underbore on 29 Oct. The sheet titles and 1A still say "Trenching Works" and "trenching works across the roadway". Update them to boring. Other issues: * 1A selects a southbound lane closure with shuttle flow (4 TCs), but the TIA (0B note 3) says shuttle flow isn't recommended in peak hours (LOS D). The sheet title says hold and release. Pick one method and make 0B, 1A and 1B agree. If it's shuttle, state the off-peak hours. * 0B note 1 refers to Augustus Street. Looks copied from another job. Please fix to Earl St and check the AADT figures are actually for Earl St. Notes 4 and 7 also give different queue lengths (145m vs 154m). * Title block has Chris as OP826. His…

    • 10 Nov 2026, 3:09 pm · S.B

      Hi Anne, quick correction on my first point. Your rev note says "footpath closure with hold and release on site frontage", so the site side may already be the pedestrian H&R Juan asked for. Sorry about that. Can you just make sure it reads clearly on 1B: a TC releasing pedestrians past the hoses on our side (ramps/covers noted), and full closure only on the opposite side? The rest of my comments still stand. Thanks! @A.B

    • 11 Nov 2026, 1:18 pm · Riri D.

      @Christine Vilador can you please check the above request from Sanju comment? I need this done asap. Thanks!

    • 11 Nov 2026, 6:40 pm · Christine Vilador

      @Christopher Wright for TMD review. TGS Updates: * 0B - Updated TIA * 1B - Updated the lane closure on the southbound lane and QL of the NB lane, site frontage footpath reopened with hold and release setup and TC to assist. * Added pedestrian rated hose ramps along the site frontage footpath and roadway hose crossings TMP Updates * 7.2 - Updated pedestrian management details, including site frontage footpath hold and release setup and hose ramps * 8.2 Updated relevant construction activity details and options analysis

  3. Plans folder: 3. Plans - CC06028 Suite: S2 Save work here: TGS > Rev 02 TMP > Project location: 98-106 Earl St, Greenslopes Quote: none Job request form: none Request type: Amendment Scope: TGS See attached new plan. Details as below: * Footpath on our side: we’ll have hoses on the footpath running to the other side of the road and a vacuum truck parked on the left lane. * Footpath opposite to our site: we’ll need full footpath closure there. doc20261104125919.pdf Fw_ Earl St - Hold and release on footpath across our site for tunnel boring.eml

    • 8 Nov 2026, 11:43 pm · A.B

      Hi @Chris, I've uploaded TGS 1B and TMP with amended footpath closures on both sides for your review. Please let me know of further changes required. Thank you! Accounts: x1 TGS amendment (TGS S2-1B-Rev 02), TMP amendment (Rev 02) TGS: Sharepoint - Documents - Rev 02 - All Documents TMP: Sharepoint - Documents - Rev 02 - All Documents

    • 16 Nov 2026, 9:56 am · Christopher Wright

      This is GTG @Ethan Mathews

    • 16 Nov 2026, 11:55 am · Ethan Mathews

      @Christopher Wright Thank you Mate - @Riri D. This has been sent back to the client FYI Adding invoicing notes shortly.

  4. @Permits / @Riri D. / @Lexi R ACCOUNTS - This is now sitting with the client for review, changing status to "Client Review" however this will be done as no charge as per Ethan

  5. Posted by janna@cromptonconcepts.com.au (janna@cromptonconcepts.com.au) · @Janna via Work Flow RapidPlan screenshot skipped: No plan file for this task

  6. Hi Team!! Please save work here: TGS >Rev 01 TMP > Rev 01 Suite: S2 Plans folder: 3. Plans - CC06028 Quote: none Could you please change TGS's 1, 2, 3, & 4 to suite tunnel bore methodology instead as per this mark. We will need a footpath closure with hold and release for each side of the road. Thanks - Shaz

    • 23 Oct 2026, 11:35 am · Janna

      @Ethan MathewsHello Ethan, good morning. May I ask if the only thing that we need to amend is the S2 or the stage 2 that is an active site with the connection line? Thank you!

    • 23 Oct 2026, 2:00 pm · Janna

      This is now ready for TMD review. Kindly check the SharePoint folder, for the amendments to CCC06028-S2 - Rev 1 - AKAM Construction - 98-106 Earl St, Greenslopes. The revised TCP has been uploaded under Rev01 for your review. Please let me know if any further information or revisions are required. Thank you. * 1x TGS Amendment – CCC06028-S2-1C Removed the Lane closure and just did a Shoulder closure with Hold and Release * 1x TGS Amendment – CC06567-S1-2C: Removed the Lane closure and just did a Shoulder closure with Hold and Release

    • 26 Oct 2026, 1:43 pm · Christopher Wright

      Hi @Janna I have made some amendments to stage 1 (Active and Inactive) Can you make the same amendments to stage 2 and also remove the water filled barriers, no QPS and no lane closures. The changes i have made are in the rapid file.

    • 26 Oct 2026, 2:43 pm · Janna

      Hello @Christopher Wright The file in the shared drive has been updated. Please let me know if you would like any further changes. Thanks!

    • 28 Oct 2026, 1:41 pm · Christopher Wright

      @Janna I'm not sure if these update have been made. Stage 1 has the TC closer to the work site, can you make sure stage two signage and TC point is the same as stage 1 Stage 2 has everything further back

    • 28 Oct 2026, 2:13 pm · Janna

      @Christopher Wright My bad Chris, updated already. Rev 01 Thank you so much!

    • 29 Oct 2026, 9:59 am · Christopher Wright

      This is GTG @Ethan Mathews

    • 29 Oct 2026, 10:15 am · Ethan Mathews

      hi @Janna can you please confirm if the TMP has been amended to include the amended TGS and update notes about changing from trenching to underbore methodology.

    • 29 Oct 2026, 10:24 am · Janna

      @Ethan Mathews Hi Ethan, not yet, sorry. I forgot to update it. I’ll make the amendments now and confirm once completed. thank youuu

    • 29 Oct 2026, 12:33 pm · Ethan Mathews

      @Janna Can I have an update please Janna?

    • 29 Oct 2026, 1:03 pm · Janna

      @Ethan Mathews hello, updated already. thank you!