Marina Mirage
Dowells
What's new
- 16 Nov 2026, 11:03 pmPermits on CC06072-S1 - Rev 1 - Dowells - Marina Mirage: 1x additional TGS 1xTMP amendment INV IV0025794 Invoice IV0025794 - Re New Project - Marina Mirage Main Beach - Demolition Portion only.eml
- 16 Nov 20262 files saved on SharePoint: Invoice IV0025794.pdf, Invoice IV0025794.pdf
- 10 Nov 2026, 9:29 amPermits on CC06072 - S1 - Dowells - Marina Mirage: 2xTGS, 1xMinor TMP, 1xRA, 1xTIA INV IV0025729 Invoice IV0025729 - Re New Project - Marina Mirage Main Beach - Demolition Portion only.eml
- 10 Nov 20261 file saved on SharePoint: Invoice IV0025729.pdf
- 29 Oct 2026, 8:36 amP.P on CC06072-S1 - Rev 1 - Dowells - Marina Mirage: @K.R @Riri D. 1x additional TGS, 1xTMP amendment (section added for new TGS) Rev 01
- 28 Oct 2026, 12:39 pmRiri D. on CC06072-S1 - Rev 1 - Dowells - Marina Mirage: @P.P Hi Pat, Got another change here for this one. basically, they need to install a hoarding fence along the front of the site, the fence will not be on council land, its on the property boundary, which is about 500mm off the edge of the existing footpath.…
Crompton Concepts prepares the traffic management for Dowells on this project at 72A Seaworld, Drive Main Beach, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 01). Monday holds 2 requests for this job (0 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.
- Client
- Dowells
- Crompton job
- CC06072
- Location
- 72A Seaworld, Drive Main Beach, QLD
- LGA / authority
- City of Gold Coast
- Project coordinator
- K.R
- Latest planner · TMD
- —
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- None on the permit boards
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 26 in 9 folders
What needs attention now
- Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06072-S1-CTMP-Rev01- Marina Mirage Demolition.pdfCTMP Rev 01 · 29 Oct 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
Nothing filed for this yet.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 01 | 29 Oct 2026 | 2 | CC06072-S1-CTMP-Rev01- Marina Mirage Demolition.pdf |
| — | TMP | Rev 01 | 29 Oct 2026 | 2 | CC06072-S1-TMP-Rev01.pdf |
| — | RA | Rev 01 | 23 Oct 2026 | 2 | CC06072-RA.pdf |
| — | TIA | Rev 01 | 22 Oct 2026 | 2 | CC06072-TIA.pdf |
| S1 | TGS | Rev 01 | 29 Oct 2026 | 2 | CC06072-S1-TGS-Rev 01- Marina Mirage Demo Stage.pdf |
03Requests on Monday
2 requests since 21 Oct 2026: 0 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06072-S1 - Rev 1 - Dowells - Marina Mirage | Amendment | S1 | Rev 01 | Invoiced Invoiced | 28 Oct 2026 | 30 Oct 2026 | ||
| CC06072 - S1 - Dowells - Marina Mirage | Amendment | S1 | Invoiced Invoiced | 21 Oct 2026 | 23 Oct 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- K.RProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 11:03 pm · Permits · CC06072-S1 - Rev 1 - Dowells - Marina Mirage
1x additional TGS 1xTMP amendment INV IV0025794 Invoice IV0025794 - Re New Project - Marina Mirage Main Beach - Demolition Portion only.eml
- 10 Nov 2026, 9:29 am · Permits · CC06072 - S1 - Dowells - Marina Mirage
2xTGS, 1xMinor TMP, 1xRA, 1xTIA INV IV0025729 Invoice IV0025729 - Re New Project - Marina Mirage Main Beach - Demolition Portion only.eml
- 29 Oct 2026, 8:36 am · P.P · CC06072-S1 - Rev 1 - Dowells - Marina Mirage
@K.R @Riri D. 1x additional TGS, 1xTMP amendment (section added for new TGS) Rev 01
- 28 Oct 2026, 12:39 pm · Riri D. · CC06072-S1 - Rev 1 - Dowells - Marina Mirage
@P.P Hi Pat, Got another change here for this one. basically, they need to install a hoarding fence along the front of the site, the fence will not be on council land, its on the property boundary, which is about 500mm off the edge of the existing footpath. For this, they will need traffic controllers to hold pedestrians while the work is being done when peds are wanting to walk by. Can you please do another plan that shows this? No need to put the peds into the parking lane or anything. We will just manage them as there are not many in this area typically. Can you update this one in the TMP also please? RE_ New Project - Marina Mirage Main Beach - Demolition Portion only.eml
- 24 Oct 2026, 10:05 am · P.P · CC06072 - S1 - Dowells - Marina Mirage
@K.R 2xTGS, 1xMinor TMP, 1xRA, 1xTIA complete & sent to client Rev 00
- 21 Oct 2026, 2:33 pm · Permits · CC06072 - S1 - Dowells - Marina Mirage
Hi team!! Please save work here: Plans - CC06072 > Rev 00 Instructions: Hi Pat, Got one here that I need back asap, we have done plans previously, but for tender, and another builder. This one is for the demo only and I need to get into COGC asap. Can you let me know what you think is a feasible time frame for a turn around on this one? For the outstanding works you have from me, this would be priority one or two. I have attached the site hoarding pan from mainland civil. And the previous TGS’s for reference of site so you can hopefully use these as your base plans to save you time. No need for work zone, or lane closures. Simple plans needed for this one. Need the below TGS’s and a Mini TMP given its only demo and load out. TGS’s needed. TGS 1 – Daily deliveries No TC * Trucks / deliveries enter and exit unassisted via the 2 crossovers that are already in place. * Peds managed by gate keepers at each end. TGS 2 – Daily deliveries TC needed. * Same as above but with hold and release of traffic for trucks etc. * Peds managed with TC if required. MINI TMP to cover options analysis. This is demo only, so not much needed to be considered. CC06072-S1-Tender-TGS-Rev 0- 72A Seaworld Dr.pdf MLC - MM - PROPOSED HV ROUTE AND SITE ACCESS.pdf New Project - Marina Mirage Main Beach - Demolition Portion only.eml Thanks - Shaz
06Every file and folder
26 files in 9 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|