Opal - Ascot / 52 Hampden St, Ascot
Balmain & Co
What's new
- 16 Nov 20269 files saved on SharePoint: CC06200-TGS-S1-Rev1 - Opal Ascot.pdf, CC06200-TGS-S1-Rev1 - Opal Ascot.tcp, CC06200-TMP-Rev0 - Opal Ascot.docx, CC06200-CTMP-Rev1 - Opal Ascot.pdf and 5 more
- 16 Nov 2026, 3:37 pmS.B on CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot): Hi Leo, Thanks for the explanation, and sorry for the back and forth on this one. I've rechecked the latest files (TGS Rev 1 saved 11/11 evening, CTMP Rev 1 saved 11/11 afternoon). The 5 km/h and GIVE WAY signs on the haul road are in, the spotter note at the…
- 12 Nov 20262 files saved on SharePoint: Quote QU5818.pdf, Signage Cost.pdf
- 10 Nov 2026, 2:58 pmS.B on CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot): Hi Leo, * ERW past end of queue (Chris's comment). I can't clearly confirm this from the PDF on 2B and 4B. There's a "REPLACE" label next to some of the signs, but no Cover Sign symbol or note explaining what's covered and where the new ERW sits. Please make…
- 4 Nov 2026, 1:28 pmLeo Escoton on CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot): Hi @Christopher Wright and @Riri D., for review. Link: TGS TMP Accounts: 1x TGS - Updated the 20km/hr to 5km/hr and Giveway as per markup. 1x TMP - Updated Table 5 to add new contacts and Updated Figures 2-3 and 5-9 to reflect updated TGS Thank you!
- 4 Nov 2026, 10:46 amRiri D. on CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot): Client: Balmain & Co. Project: Opal - Ascot Please amend as per below: Please amend each TGS to change the internal speed signs to 5km/h instead of 20 as site has had to decrease the speed due to the lack of space and volume of trucks coming in and…
Crompton Concepts prepares the traffic management for Balmain & Co on this project at 48 Hampden St, Ascot, QLD. 1 Monday request is open; the most pressing is at the TMD review stage; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 01). On the permit boards: 0 permits in force and 1 in progress. Monday holds 1 requests for this job (0 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- Folder5. Plans - CC06200
- MondayCC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot)
- Client
- Balmain & Co
- Crompton job
- CC06200
- Location
- 48 Hampden St, Ascot, QLD
- LGA / authority
- —
- Project coordinator
- Ethan Mathews
- Latest planner · TMD
- Leo Escoton · Christopher Wright, S.B
- Monday project status
- Planning in Process
- Deliverables
- Council Road Permit, RA, TA, TGS, TMP, Traffic Control, Footpath Permit
- Permits (Monday)
- 0 in force · 1 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 133 in 55 folders
What needs attention now
- Needs TMD review: CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot). Required by 6 Nov 2026 (overdue). TMD: Christopher Wright, S.B · Last note (16 Nov 2026, S.B): “Hi Leo, Thanks for the explanation, and sorry for the back and forth on this one. I've rechecked the latest files (TGS Rev 1 saved 11/11 evening, CTMP Rev 1 saved 11/11…”
- Permit in progress: Road (BCC road) is Council Pending. Follow up 2 Dec 2026. Wanted from 6 Dec 2026.
PPermits
1 permit line on the Monday permit boards: 0 in force, 1 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| Road Team Ethan · BCC Road Permits - Ethan | BCC road | Ongoing | In progress Council Pending | 6 Dec 2026 – 6 Jan 2027 | 22 Oct 2026 | 2 Dec 2026 | 4 Dec 2026 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06200-CTMP-Rev1 - Opal Ascot.pdfCTMP Rev 01 · 16 Nov 2026
- PDF2025.02.14 SARA Response.pdf24 Mar 2026
- PDFDecision Notice - Change Application s81_s82- Approved.pdf24 Mar 2026
- PDFCC06012-TGS-S1-Rev00 (1)_Opal Markup.pdf9 Mar 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLPO 25OPA for renewals11 May 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 01 | 16 Nov 2026 | 2 | CC06200-CTMP-Rev1 - Opal Ascot.pdf |
| — | TMP | Rev 01 | 16 Nov 2026 | 2 | CC06200-Long Term Signs.pdfCC06200-Road and Footpath Occupancy Map.pdfCC06200-TMP-Rev1 - Opal Ascot.pdf |
| — | RA | Rev 00 | 16 Nov 2026 | 1 | CC06200-RA-Rev0 - Opal Ascot.pdf |
| General | Workzone plan | Rev 01 | 16 Nov 2026 | 2 | CC06200-Workzone Plan (Ad-hoc).pdf |
| S1 | TGS | Rev 01 | 16 Nov 2026 | 2 | CC06200-TGS-S1-Rev1 - Opal Ascot.pdf |
03Requests on Monday
1 request since 4 Nov 2026: 0 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot) | Amendment | S1 | Rev 01 | TMD review TMD Review | 4 Nov 2026 | 6 Nov 2026 | Leo Escoton | Christopher Wright, S.B |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- Leo EscotonPlanner
- Christopher WrightTMD
- S.BTMD
- Ethan MathewsProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 3:37 pm · S.B · CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot)
Hi Leo, Thanks for the explanation, and sorry for the back and forth on this one. I've rechecked the latest files (TGS Rev 1 saved 11/11 evening, CTMP Rev 1 saved 11/11 afternoon). The 5 km/h and GIVE WAY signs on the haul road are in, the spotter note at the gate is good, the cover revision note now covers the haul road controls and ERW relocation, and Brendan Wright and Adam Tanner are in Table 5. Here's what's left, kept as short as I can: 1. "REPLACE" label (1B, 2B, 3B, 4B) * Understood that it tells the crew to swap the long-term sign for the TRUCK / 40 / REDUCE SPEED assembly. The problem is that "REPLACE" isn't in the legend on any sheet, so a crew picking up the TGS cold won't know what it means. Please add a legend entry or a one-line note, e.g. "REPLACE: remove long-term sign and install TRUCK / 40 / REDUCE SPEED assembly at this location for the duration of truck activity; reinstate after." No other drawing change needed. 2. Second driveway (open question for Riri/Chris) * Riri's markup (04/11) says she "blocked out access in the second drive way", but your reply says both gates stay accessible. Both can't be right. @Riri D. can you confirm from the client email which one site wants? If Gate 2 is closed to trucks, the TGS needs to show it. If both are open, we leave it as is. 3. CTMP: still outstanding from the last round * 1.1 Table 1 still only has the 18/03/2026 Rev 0 prepared/reviewed lines. Please add a Rev 1 line (prepared by / reviewed by / 04/11 or issue…
- 16 Nov 2026, 3:39 pm · Leo Escoton
Thanks for the clarification @S.B, will amend this ASAP.
- 16 Nov 2026, 5:35 pm · Leo Escoton
Hi @S.B, @Ethan Mathews and @Riri D., for review Link: TGS - Sharepoint - Documents - Rev 01 - All Documents TMP - Sharepoint - Documents - Rev 01 - All Documents Accounts 1x TGS 1X TMP Amendments: TGS * Added REPLACE notes to Sheets 1B, 2B, 3B and 4B, clarifying that existing signs identified for replacement or covering must be replaced or covered as indicated, and reinstated once the temporary traffic arrangement is no longer required. * Updated the Revision History to include the amended haul road traffic controls, including 5 km/h internal speed limit signage, GIVE WAY signage, ERW sign relocation and the added REPLACE notes. TMP * Updated Section 1.4 Change Log to include the haul road 5 km/h internal speed limit, GIVE WAY signage, ERW signage relocation, REPLACE notes and updated figures reflecting the revised TGS. * Updated the cover page revision number from 00 to 01. *…
- 16 Nov 2026, 3:39 pm · Leo Escoton
- 10 Nov 2026, 2:58 pm · S.B · CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot)
Hi Leo, * ERW past end of queue (Chris's comment). I can't clearly confirm this from the PDF on 2B and 4B. There's a "REPLACE" label next to some of the signs, but no Cover Sign symbol or note explaining what's covered and where the new ERW sits. Please make sure the existing ERW inside the queue is shown covered (cover symbol plus a note) and the new ERW is clearly past the 30m queue on every H&R sheet. Get rid of the "REPLACE" text if it's just a drafting label. * Second driveway. Riri's markup blocked access at the second driveway. I can't see a note saying it's closed off. Please add a note or delineation so it's obvious on site. * Revision notes. The TGS cover rev note reads "including 5 km/h internal speed limit signage, Give Way and signage" (unfinished). Neither the TGS nor the CTMP change log mentions the ERW change from the 5th. Dates are still 04/11 but the work was finished on the 6th. Please update both. * CTMP 1.1 only has the Rev 0 prepared/reviewed lines. Add the Rev 1 lines. Cheers @Leo Escoton @Riri D.
- 11 Nov 2026, 1:38 pm · Leo Escoton
Hi @Christopher Wright (tagging @Riri D. as well), can we double check this comment please? * ERW signage: No further change to the “REPLACE” label. It instructs the crew to replace the Long Term Sign with the TRUCK / 40 / RS assembly. * Second driveway: No change. Both gates will remain accessible and in use. * Revision notes: Amended to include the haul road traffic controls and ERW sign relocation. Dates haven't change as it was the date that I was allocated and made changes with.
- 12 Nov 2026, 5:35 pm · Ethan Mathews
@Leo Escoton @S.B Hi Team, need this to be finalised by tomorrow morning please. For the simplicity of this amendment allocation I would have assumed it not to take over a week to complete..? Thank you team @Riri D. - FYI
- 12 Nov 2026, 5:41 pm · Leo Escoton
Hi @Ethan Mathews, this was originally completed 7 days ago and submitted for TMD Review. However, following Sanju's AI Review comments, there was some confusion regarding the required amendments. Nevertheless, I've now addressed and finalised the comments from Chris and Rih from the initial allocation when this was first assigned to me. Hoping this can now be reviewed and checked. Thank you!
- 11 Nov 2026, 1:38 pm · Leo Escoton
- 4 Nov 2026, 1:28 pm · Leo Escoton · CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot)
Hi @Christopher Wright and @Riri D., for review. Link: TGS TMP Accounts: 1x TGS - Updated the 20km/hr to 5km/hr and Giveway as per markup. 1x TMP - Updated Table 5 to add new contacts and Updated Figures 2-3 and 5-9 to reflect updated TGS Thank you!
- 5 Nov 2026, 12:07 pm · Christopher Wright
Hi @Leo Escoton Can you amend all TGS's that have the end roadwork within the queue length. The end roadwork that is displayed on the TGS's can be covered and another end road work will need to be implemented. The end roadwork must be past the end of queue. See below what you have and then my example.
- 6 Nov 2026, 5:05 pm · Leo Escoton
Hi @Christopher Wright and @Riri D., all comments have been amended including CTMP to reflect amended TGS. Thank you!
- 5 Nov 2026, 12:07 pm · Christopher Wright
- 4 Nov 2026, 10:46 am · Riri D. · CC06200-S1- Rev 1 - Balmain & Co - Opal (Ascot)
Client: Balmain & Co. Project: Opal - Ascot Please amend as per below: Please amend each TGS to change the internal speed signs to 5km/h instead of 20 as site has had to decrease the speed due to the lack of space and volume of trucks coming in and out: Please also amend the CTMP to add in the contacts as per below: Brendan Wright - HSEQ Advisor 0499 032 412 bwright@balmainandco.com.au Adam Tanner - Contracts Administrator atanner@balmainandco.com.au Save the files here below: Main Folder Link: 52 Hampden St, Ascot TGS: Rev 01 CTMP: Rev 01
- 4 Nov 2026, 11:35 am · Riri D.
@Leo Escoton I think thats it mate, I added the 5k signs and the giveways up the haul road and blocked out access in the second drive way Fw_ Crompton Concepts Traffic Control Implementation For Site.eml
- 4 Nov 2026, 11:35 am · Riri D.
06Every file and folder
133 files in 55 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|