61 - 73 Meron Street Southport
Platform Constructions
What's new
- 16 Nov 20261 file saved on SharePoint: RE Monarch place Traffic Management Plan quote request .eml
- 11 Nov 20261 file saved on SharePoint: TRAFFIC CONTROL BOOKING FORM.pdf
- 9 Nov 20263 files saved on SharePoint: CC06217-S1-TGS-R06 - 61-73 Meron St, Southport.pdf, DA-1078440.pdf, CC06217-S1-8B-R06 - 61-73 Meron St, Southport.pdf
- 5 Nov 20262 files saved on SharePoint: LONO - 61-73 Meron Street, Southport .pdf, New LONO Request - Platform Constructions - 61-73 Meron St, Southport.eml
Crompton Concepts prepares the traffic management for Platform Constructions on this project at 59 Meron Street, Southport, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 06; 2 TGS suites on file (General Rev 06, S1 Rev 06). On the permit boards: 0 permits in force and 2 in progress. Monday holds 2 requests for this job (0 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.
- Client
- Platform Constructions
- Crompton job
- CC06217
- Location
- 59 Meron Street, Southport, QLD
- LGA / authority
- City of Gold Coast
- Project coordinator
- D.B
- Latest planner · TMD
- —
- Monday project status
- New
- Deliverables
- Council Road Permit, Engineering (RPEQ), Engineering Design, Footpath Permit, Noise Management Plan, Out of Hours Permit, Police Permit, RA
- Permits (Monday)
- 0 in force · 2 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 95 in 39 folders
What needs attention now
- Permit in progress: Half Road: Pre-cast Installation (Gold Coast) is Initial Pending. Follow up 23 Nov 2026. Wanted from 30 Nov 2026.
- Permit in progress: RCP (TMR) is TMR Pending. Follow up 23 Nov 2026. Wanted from 31 Aug 2026.
PPermits
2 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| Half Road: Pre-cast Installation Team Aisha · Gold Coast Permits - Aisha | Gold Coast | Date Specific | In progress Initial Pending | 30 Nov 2026 – 4 Dec 2026 | 9 Nov 2026 | 23 Nov 2026 | ||
| RCP Team Aisha · TMR Permits - Aisha | TMR | Ongoing | In progress TMR Pending | 31 Aug 2026 – 31 Aug 2027 | 27 Aug 2026 | 23 Nov 2026 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06217-S1-CTMP-R06 - 61-73 Meron St, Southport.pdfCTMP Rev 06 · 24 Aug 2026
- PDFGCC Amendment on CMP.pdf17 Mar 2026
- PDFGROUND FLOOR SWEPT PATH LAYOUT PLAN.pdf17 Mar 2026
- PDFEPS Alternative - Monarch Place Southport QLD.pdf17 Mar 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 06 | 24 Aug 2026 | 7 | CC06217-S1-CTMP-R06 - 61-73 Meron St, Southport.pdf |
| — | TMP | Rev 06 | 24 Aug 2026 | 7 | CC06217-S1-TMP-R06 - 61-73 Meron St, Southport.pdf |
| — | RA | Rev 06 | 17 Aug 2026 | 3 | CC06217-S1-RA-R5 - 61-73 Meron St, Southport.pdf |
| — | Letter to residents | Rev 06 | 13 Jul 2026 | 3 | CC06217-Letter to Residents.pdf |
| General | TGS | Rev 06 | 19 Aug 2026 | 1 | CC06217-Occupancy Map.pdf |
| General | Swept path | Rev 06 | 17 Jul 2026 | 2 | Swept Path_61-73 Metron St,Southport.pdf |
| General | Workzone plan | Rev 06 | 19 Aug 2026 | 6 | CC06217-WZ Plan Gibbs.pdfCC06217-WZ Plan Meron.pdf |
| S1 | TGS | Rev 06 | 19 Aug 2026 | 4 | CC06217-S1-TGS-R06 - 61-73 Meron St, Southport.pdf |
03Requests on Monday
2 requests since 2 Jun 2026: 0 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06217-S1 - Rev 5 - Platform Constructions - 61-73 Meron Street, Southport QLD 4215 | Council RFI | S1 | Rev 05 | Closed No Charge | 10 Aug 2026 | 12 Aug 2026 | ||
| CC06217 - S1 - Rev 1 - Platform Constructions - 61-73 Meron Street, Southport QLD 4215 | Amendment | S1 | Rev 01 | Closed No Charge | 2 Jun 2026 | 4 Jun 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- AishaProject coordinator (folder flag)
- D.BProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
No Monday updates on this project's requests since late August.
06Every file and folder
95 files in 39 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|