← All projectsCC06264
Project portal · built 17 Nov 2026, 10:03 am AEST · TMD review

Caloundra Upgrade

SEE Civil

This project also has a hand-maintained portal with packages, approvals, NCRs and meetings: open the detailed CTCU portal.

Crompton Concepts prepares the traffic management for SEE Civil on this project at Caloundra, QLD. 7 Monday requests are open; the most pressing is at the TMD review stage; the current CTMP on SharePoint is Rev 03; 3 TGS suites on file (General no rev, S1 Rev 03, S2 Rev 05). Every file opens straight from SharePoint.

Client
SEE Civil
Crompton job
CC06264
Location
Caloundra, QLD
LGA / authority
—
Project coordinator
K.R
Latest planner · TMD
J.R · A.A, S.B
Monday project status
New
Deliverables
TGS
Permits (Monday)
None on the permit boards
Last activity
16 Nov 2026
Files on SharePoint
1,566 in 211 folders

What needs attention now

  1. Needs TMD review: CC06264 - SEE CIVIL - Caloundra - Package B - TMP. Required by 18 Sep 2026 (overdue). TMD: A.A, S.B · Last note (9 Sep 2026, D.B): “Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD…”
  2. Needs TMD review: CC06264 - SEE CIVIL - Caloundra - Package B - Phase 2. Required by 18 Sep 2026 (overdue). TMD: A.A, S.B · Last note (9 Sep 2026, D.B): “Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD…”
  3. Needs TMD review: CC06264 - SEE CIVIL - Caloundra - Package A&C - Phase 0. Required by 18 Sep 2026 (overdue). TMD: A.A, S.B · Last note (17 Sep 2026, J.G): “@D.B @A.A @S.B The TGSs for Phase 0 are ready for review. The TMP is currently being updated. Thanks”
  4. Needs TMD review: CC06264 - SEE CIVIL - Caloundra - Package A&C - Phase 1. Required by 18 Sep 2026 (overdue). TMD: A.A, S.B · Last note (15 Oct 2026, KB.R): “Hi @D.B @A.A @S.B, I've tentatively uploaded the TGS, PMP, RA for my part. Link: TGS: Rev02 PMP: Rev02 RA: Rev02 I do have pending confirmations I've listed down here. Pending…”
  5. Needs TMD review: CC06264 - SEE CIVIL - Caloundra - Package A&C - Phase 2. Required by 18 Sep 2026 (overdue). TMD: A.A, S.B · Last note (9 Sep 2026, D.B): “Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD…”
  6. Needs TMD review: CC06264 - SEE CIVIL - Caloundra - Package A&C - TMP. Required by 18 Sep 2026 (overdue). TMD: A.A, S.B · Last note (28 Sep 2026, J.G): “@D.B @A.A For review. Thank you Phase 0 -Amended Stage A-0A and A-0D as requested. -Additional Stage A-0B for separated work area on Nicholls Street. -Additional Stage A-0C for…”
  7. Needs TMD review: CC06264 - SEE CIVIL - Caloundra - Package B - Phase 0. Required by 18 Sep 2026 (overdue). TMD: A.A, S.B · Last note (9 Sep 2026, D.B): “Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD…”

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

8 requests since 13 Apr 2026: 8 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06264 - SEE CIVIL - Caloundra - Package B - TMPNew plansTMPTMD review
TMD Review
9 Sep 202618 Sep 2026J.RA.A, S.B
CC06264 - SEE CIVIL - Caloundra - Package B - Phase 2New plansTMD review
TMD Review
9 Sep 202618 Sep 2026J.RA.A, S.B
CC06264 - SEE CIVIL - Caloundra - Package A&C - Phase 0New plansTMD review
TMD Review
9 Sep 202618 Sep 2026J.GA.A, S.B
CC06264 - SEE CIVIL - Caloundra - Package A&C - Phase 1New plansTMD review
TMD Review
9 Sep 202618 Sep 2026KB.RA.A, S.B
CC06264 - SEE CIVIL - Caloundra - Package A&C - Phase 2New plansTMD review
TMD Review
9 Sep 202618 Sep 2026A.B, Michelle SaysonA.A, S.B
CC06264 - SEE CIVIL - Caloundra - Package A&C - TMPNew plansTMPTMD review
TMD Review
9 Sep 202618 Sep 2026J.GA.A, S.B
CC06264 - SEE CIVIL - Caloundra - Package B - Phase 0New plansTMD review
TMD Review
9 Sep 202618 Sep 2026J.RA.A, S.B
CC06264 - SEE Civil - Caloundra Transport Corridor UpgradeNew plansInvoiced
Invoiced
13 Apr 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • Alex0456 789 396
  • Alex.Brouard@seecivil.com.auAlex.Brouard@seecivil.com.au

Crompton Concepts

  • J.RPlanner
  • A.ATMD
  • S.BTMD
  • J.GPlanner
  • KB.RPlanner
  • A.BPlanner
  • Michelle SaysonPlanner
  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi @D.B @A.A @S.B, I've tentatively uploaded the TGS, PMP, RA for my part. Link: TGS: Rev02 PMP: Rev02 RA: Rev02 I do have pending confirmations I've listed down here. Pending confirmation: * TGS-006: Pending RPEQ Barrier Design from Sanju/Rashmi * TGS-016: Changes would affect general long-term signs. Need to show SIDs and QTA sign (would affect sign placement) * TGS-018: Pending SEE Civil confirmation on emergency contact * RA-009: Pending SEE Confirmation on RSA as they need to decide which option to pick * PMP-003: No revision number included in the Civil Construction Programme Rev [x] * PMP-011: DEP-07 is still set as proposed status. Decide after DEP-07 is accepted or not. * PMP-016: Confirm location, date, volume, survey date for Insert 24. Remove [200]m spacing along works on crossing?

    • 19 Oct 2026, 12:27 pm · KB.R

      I've reuploaded the TGS, PMP, RA following the clarifications sent out last Friday. There is still pending info regarding TGS-006 as I'm still waiting for the RPEQ Barrier Design from Sanju/Rashmi. While TGS-018 & PMP-003 is still on pending info from client. I've also reuploaded the VMS plans to fix some minor inconsistencies and added the note regarding approval. See link for VMS plan for Package A&C here: Rev02. Just to note, it follows TGS numbering of Phase 0. Will update again once all three are provided. Thanks!

  2. Hi @D.B @A.A @S.B, I've reuploaded the TGS, RA, PMP following amendments noted in the meeting. I've uploaded the updated figure attachment for Phase 1-Stage A-1A. These are all internal amendments. Accounts: 1xTGS Amendment 1xTMP Amendment 1xRA Amendment Link: TMP: TMP - Rev02 TGS: TGS - Phase 1 - Rev01 PMP: PMP - Rev01 RA: RA - Rev01 It is now available for review. Thank you.

  3. @D.B @A.A For review. Thank you Phase 0 -Amended Stage A-0A and A-0D as requested. -Additional Stage A-0B for separated work area on Nicholls Street. -Additional Stage A-0C for road closure on Gosling Street. -TGS and PMP Rev up to Rev01 -TMP rev up to Rev02 per TMP version -Updated logo Compiled all updated files, see links below: TMP - Rev02 TGS - Phase 0 - Rev01 TGS - Phase 1 - Rev01 TGS - Phase 2 - Rev01 PMP - Rev01 RA - Rev01 Let me know if anything needs changing. Thank you

  4. Hi @D.B @A.A @S.B, I've amended the TGS, TMP, PMP and RA following the amendments noted by the client as discussed with Aaron in our Teams meeting. To note, TMP amendment is for Phase 1 discussion only, Jaymark handles overall TMP amendment. I've changed the TMP to Rev01 already and had changed revision numbers and revision dates, where applicable. However, this is still to be finalised by Jaymark once he is done with his part. There's no Monday Line for Rev01 so I tentatively used this existing board for the updates. I've created Rev01 folders for each file noted here. Accounts: 1xTGS Amendment 1xTMP Discussion Amendment 1xRA Amendment 1xPMP Amendment Link: TGS: Rev01 TMP: 1. TMP PMP: Rev01 RA: Rev01 It is now available for review. Thank you!

  5. Hi @D.B @S.B @A.A, I've completed and submitted my TGS following all the amendments noted from the meeting yesterday and today. I've completed all my parts in the TMP and have uploaded the PMP for Phase 1. I've consolidated also existing risk assessments from tender and added in additional risks following what was discussed. Accounts: 1xTGS (5xSetups) 1xPMP 1xRA 1xTMP Discussion It is now available for review. Thank you!

    • 18 Sep 2026, 2:35 pm · KB.R

      Hi team, I've just uploaded the TGS and PMP again following the amendments discussed over the meeting. I've amended the PMP package document as well to cover Package B alignment. It is now available for review. Thank you! TGS Location: 3. Phase 1 PMP Location: PMP

  6. @D.B @A.A @S.B The TGSs for Phase 0 are ready for review. The TMP is currently being updated. Thanks

  7. Hi @A.A @S.B @D.B, I've uploaded the completed TGS following the amendments noted in by Aaron from yesterday's meeting. Will work on the TMP and PMP and submit it later, as well. Thanks.

    • 17 Sep 2026, 2:25 pm · KB.R

      Hi @D.B @A.A @S.B, I've reuploaded the TGS with the updated RPEQ barrier design. I'll update the TMP and PMP following this and I'll be done with my part. Thanks.

  8. Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD NUMBER ------------------------------------------------------------------------------- Concept TGS Phase 0 Location: Phase 2 Info ------------------------------------------------------------------------------- TGS Location: 4. Phase 2 ------------------------------------------------------------------------------- The Concepts have been approved, we are now adding them as approved plans ------------------------------------------------------------------------------- Please turn the concept TGS's into Actual TGS's ------------------------------------------------------------------------------- Client Contact: Jai Smith Project Manager M 0488 662 928 | T 07 5671 9601 Jai.Smith@seecivil.com.au ------------------------------------------------------------------------------- Any questions please advise below: -------------------------------------------------------------------------------

    • 16 Sep 2026, 3:38 pm · J.R

      Hi @D.B according to the meeting this afternoon with @A.A I should be doing Phase 1 instead of Phase 2 (since we're still waiting for the TIA for this).

    • 17 Sep 2026, 2:24 pm · J.R

      Hi @A.A @S.B Package B Phase 1 TGS is now available for review. Thanks!

    • 18 Sep 2026, 2:11 pm · J.R

      Hi @A.A Phase 0, Phase 1 and CTMP are now available for review again. Thanks!

    • 7 Oct 2026, 11:34 am · J.R

      Hi @A.A, TGS and CTMP Rev2 of Phase are now available for review. Thanks! Change log: Stage 1A: Remove Arthur St/Third Ave signs (covered in Package A). Stage 1C: Convert 40 RS to temporary + add covered lane status sign. Nicklin Way: Additional/extended northbound work area. 4.1.1, 4.1.3, Appendix A 07/10/2026 Accounts: 2x TGS amendments 1x CTMP amendment

  9. Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD NUMBER ------------------------------------------------------------------------------- Concept TGS Phase 0 Location: Phase 0 Info ------------------------------------------------------------------------------- TGS Location: 2. Phase 0 ------------------------------------------------------------------------------- The Concepts have been approved, we are now adding them as approved plans ------------------------------------------------------------------------------- Please turn the concept TGS's into Actual TGS's ------------------------------------------------------------------------------- Client Contact: Jai Smith Project Manager M 0488 662 928 | T 07 5671 9601 Jai.Smith@seecivil.com.au ------------------------------------------------------------------------------- Any questions please advise below: -------------------------------------------------------------------------------

    • 11 Sep 2026, 5:15 pm · J.R

      Hi @A.A @S.B, Package B Phase 0 - Pedestrian Management, is now available for review. Thank you!

  10. Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD NUMBER ------------------------------------------------------------------------------- Concept TMP Location: TMP ------------------------------------------------------------------------------- TMP Location: 1. TMP ------------------------------------------------------------------------------- The Concepts have been approved, we are now adding them as approved plans ------------------------------------------------------------------------------- At This Stage you are to only include the below TGS's into the TMP, please use the concept TMP to help. 2. Package B - 2. Phase 0 - 4. Phase 2 ------------------------------------------------------------------------------- Client Contact: Jai Smith Project Manager M 0488 662 928 | T 07 5671 9601 Jai.Smith@seecivil.com.au ------------------------------------------------------------------------------- Any questions please advise below: -------------------------------------------------------------------------------

    • 17 Sep 2026, 4:58 pm · J.R

      Hi @A.A @S.B the Package B TMP, RA and PMP are now available for review. Thank you!

    • 18 Sep 2026, 2:11 pm · J.R

      Hi @A.A Phase 0, Phase 1 and CTMP are now available for review again. Thanks!

  11. Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD NUMBER ------------------------------------------------------------------------------- Concept TGS Phase 0 Location: Phase 2 Info ------------------------------------------------------------------------------- TGS Location: 4. Phase 2 ------------------------------------------------------------------------------- The Concepts have been approved, we are now adding them as approved plans ------------------------------------------------------------------------------- Please turn the concept TGS's into Actual TGS's ------------------------------------------------------------------------------- Client Contact: Jai Smith Project Manager M 0488 662 928 | T 07 5671 9601 Jai.Smith@seecivil.com.au ------------------------------------------------------------------------------- Any questions please advise below: -------------------------------------------------------------------------------

  12. Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD NUMBER ------------------------------------------------------------------------------- Concept TGS Phase 0 Location: Phase 1 Info ------------------------------------------------------------------------------- TGS Location: 3. Phase 1 ------------------------------------------------------------------------------- The Concepts have been approved, we are now adding them as approved plans ------------------------------------------------------------------------------- Please turn the concept TGS's into Actual TGS's ------------------------------------------------------------------------------- Client Contact: Jai Smith Project Manager M 0488 662 928 | T 07 5671 9601 Jai.Smith@seecivil.com.au ------------------------------------------------------------------------------- Any questions please advise below: -------------------------------------------------------------------------------

    • 10 Sep 2026, 5:03 pm · KB.R

      Phase 1 on hold as per Aaron. Currently working on long-term signages for all phases for Package A&C.

  13. Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD NUMBER ------------------------------------------------------------------------------- Concept TGS Phase 0 Location: Phase 0 Info ------------------------------------------------------------------------------- TGS Location: 2. Phase 0 ------------------------------------------------------------------------------- The Concepts have been approved, we are now adding them as approved plans ------------------------------------------------------------------------------- Please turn the concept TGS's into Actual TGS's ------------------------------------------------------------------------------- Client Contact: Jai Smith Project Manager M 0488 662 928 | T 07 5671 9601 Jai.Smith@seecivil.com.au ------------------------------------------------------------------------------- Any questions please advise below: -------------------------------------------------------------------------------

  14. Hi Planner, Please see below. ANY QUESTIONS PLEASE LET AARON OR SANJU KNOW ALL PLANS ARE TO BE IN SANJU's NAME AND TMD NUMBER ------------------------------------------------------------------------------- Concept TMP Location: TMP ------------------------------------------------------------------------------- TMP Location: 1. TMP ------------------------------------------------------------------------------- The Concepts have been approved, we are now adding them as approved plans ------------------------------------------------------------------------------- At This Stage you are to only include the below TGS's into the TMP, please use the concept TMP to help. 1. Package A & C - 2. Phase 0 - 3. Phase 1 - 4. Phase 2 ------------------------------------------------------------------------------- Client Contact: Jai Smith Project Manager M 0488 662 928 | T 07 5671 9601 Jai.Smith@seecivil.com.au ------------------------------------------------------------------------------- Any questions please advise below: -------------------------------------------------------------------------------

06Every file and folder

1,566 files in 211 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved