← All projectsCC06273
Project portal · built 17 Nov 2026, 10:03 am AEST · Recently active Upfront payment

Elizabeth Street / 190 Elizabeth Street

Versatile_PAY UPFRONT

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Versatile on this project at 190 Elizabeth Street, Brisbane City QLD 4000, Australia. No Monday request is open right now; the latest one closed recently; 1 TGS suite on file (S1 Rev 02). Monday holds 3 requests for this job (1 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Versatile
Crompton job
CC06273
Location
190 Elizabeth Street, Brisbane City QLD 4000, Australia
LGA / authority
City of Brisbane
Project coordinator
C.C
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS, TMP
Permits (Monday)
None on the permit boards
Last activity
30 Oct 2026
Files on SharePoint
26 in 101 folders

What needs attention now

  1. Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

    Nothing filed for this yet.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

    Nothing filed for this yet.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—RARev 0213 Aug 20261Risk Assessment.pdf
—TIARev 0013 May 20261TIA.pdf
S1TGSRev 024 Sep 20263CC06273-TGS-S1-R2-190 Elizabeth St, Brisbane City.pdf

03Requests on Monday

3 requests since 16 Apr 2026: 1 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06273-S1 - Rev 2 - Versatile - 190 Elizabeth St, Brisbane CityAmendmentS1Rev 02Closed
No Charge
10 Aug 202612 Aug 2026
CC06273-S1 - Rev 1 - Versatile - 190 Elizabeth St, Brisbane CityAmendmentS1Rev 01Invoiced
Invoiced
30 Jun 20263 Jul 2026
CC06273 - Versatile - 190 Elizabeth St, Brisbane CityNew plansInvoiced
Invoiced
16 Apr 202620 Apr 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • !! Archived
  • PM Darren Treloar02 9896 7727
  • PM Email Address
  • PM Phone Number
  • ACCOUNTS
  • CA Name - Email
  • CA Name - Phone Number
  • CA Email Address
  • CA Phone Number
  • PM Jonathon Manton0452 073 006
  • Projc. Engr. Name - Email
  • Projc. Engr. Name - Phone Number
  • SM Name - Email
  • SM Name - Phone Number
  • SM Email Address
  • SM Phone Number
  • Site Engr. Name - Email
  • Site Engr. Name - Phone Number
  • WHS Name - Email
  • WHS Name - Phone Number
  • WHS Email Address
  • WHS Phone Number

Crompton Concepts

  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. No charge per chelsea

  2. Chelsea team catch up 10-09-26.pdf Invoice along with S1-rev 2 3x TGS amendment CC06273-S1-1B Edward St - Crane Works - Road Closure with Detour and Lane Closure CC06273-S1-3B Elizabeth St - Main Works - Lane Closure with Hold & Release CC06273-S1-4B Queen St - Demolition - Footpath Closure

    • 10 Sep 2026, 7:28 pm · Riri D.

      @C.C do we charged this amendment ??

  3. Chelsea team catch up 10-09-26.pdf Invoice along with S1-rev 2 1x TGS new CC06273-S1-3B Elizabeth St - Demolition - Footpath and Trucks Turning with Hold & Release

    • 10 Sep 2026, 7:29 pm · Riri D.

      @C.C this is to be charged 1xaddtl TGS

    • 11 Sep 2026, 3:38 pm · Permits

      Invoice Sent to Client (IV0025250)- Karein (1109) Re_ Re_ 190 Elizabeth St - Versatile.eml

  4. @C.C GTG. Thank you.

  5. @Y.B Add another cop on other end of the closure THIS ONE IS URGENT I NEED THIS FIRST. Change the portabboom to across the driveway as the footpath will be closed so no hold and release of peds are needed but we do need the driveway to be managed for trucks exiting. One of the TC's on the road will manage this. remove the two cops, just keep the one TC and one cop. Whe the mobile crane is brought into Queen the cop and tc will manage this is and will move back to point.

    • 4 Sep 2026, 11:34 am · Y.B

      Hi @A.A @C.C plans have been revised and reuploaded accordingly. Please let me know if any other changes are needed. Thank you! Changes: CC06273-S1-1B - Added 1 QPS at the end of the closure CC06273-S1-3B - Removed 1 portable barrier and relocated the other portable barrier to the driveway for truck management. - Revised Streetview A and added a note, "One of the Traffic Controllers on the road will manage the portable boom barriers during truck exit" CC06273-S1-4B - Removed QPS on the road and updated the signs. TGS Rev 02: Sharepoint - Documents - Rev 02 - All Documents

06Every file and folder

26 files in 101 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved