← All projectsCC06287
Project portal · built 17 Nov 2026, 10:03 am AEST · Permits in force

Chevron Renaissance (Hotel Jardin)

Eximm

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Eximm on this project at 3240 Surfers Paradise Blvd, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 02; 1 TGS suite on file (S1 Rev 01). On the permit boards: 1 permit in force and 0 in progress. Monday holds 2 requests for this job (0 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Eximm
Crompton job
CC06287
Location
3240 Surfers Paradise Blvd, QLD
LGA / authority
City of Gold Coast
Project coordinator
Ethan Mathews
Latest planner · TMD
—
Monday project status
New
Deliverables
Council Road Permit, Footpath Permit, Out of Hours Permit, Noise Management Plan, Police Permit, RA, Site Visit, TA, TGS, TMP, Traffic Control
Permits (Monday)
1 in force · 0 in progress
Last activity
30 Oct 2026
Files on SharePoint
91 in 37 folders

What needs attention now

  1. Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.

PPermits

2 permit lines on the Monday permit boards: 1 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
TRC – Mobile Crane Lifts
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificIn force
Done
14 Sep 2026 – 30 Nov 202614 Sep 2026
AHB – Mobile Crane Lifts
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificExpired
Done
14 Sep 2026 – 13 Nov 202614 Sep 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

2 requests since 5 Aug 2026: 0 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06287-S1 - Rev 2 - Eximm - Chevron Renaissance (Hotel Jardin)AmendmentS1Rev 02Invoiced
Invoiced
8 Sep 202610 Sep 2026
CC06287-S1 - Rev 1 - Eximm - Chevron Renaissance (Hotel Jardin)AmendmentS1Rev 01Invoiced
Invoiced
5 Aug 202611 Aug 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • Ethan MathewsProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. IV0025367 sent to client - Shaz 2309 Invoice IV0025367 from Crompton Concepts for Chevron Renaissance (Hotel Jardin).eml as per QU-5582 1x nmp 1x ltr 1x tmpa

  2. @Permits / @Lexi R / @Riri D. - Please invoice as per below: Please convert quote QU-5582 to invoice and invoice Eximm Please see correspondence below: RFI for GCCC TRC & AHB Permits - Chevron Renaissance.pdf

  3. @Ethan Mathews GTG

    • 11 Sep 2026, 2:27 pm · Ethan Mathews

      Plans sent back to Client and Council for approval, invoicing notes to come @Riri D. - FYI

  4. Hi @J.R Plans folder: 5. Plans - CC06287 Suite: S1 Save work here: TMP / LTR: Rev 02 NMP: Rev 01 Project location: Chevron Renaissance (Hotel Jardin) Quote: Attached Request type: Amendment Scope: TMP, LTR, and NMP Client mark-ups/attachments: Quote QU5582.pdf Chevron Renaissance - Eximm Council Permits RFI Correspondence.pdf Thanks (Iris-080926)

    • 8 Sep 2026, 5:19 pm · J.R

      Hi @Ethan Mathews regarding the TGS to be attached on the NMP, are they using TGS-3B? Since Unita said that there will be no road and pedestrian impacts during works. TGS-3B

    • 9 Sep 2026, 8:06 am · Ethan Mathews

      @J.R Hi Jenesis, the client must be slightly confused to what road impacts means. The TGS that is used for both Eximm and Unita's scope of works is TGS 4B which is the Harmonised TGS that shows both contractor's work areas. We will need to base it off TGS 4B please. The only Road Impacts will be Hold & Release and the lane/loading bay closure for trucks to store in. The other impact is the full footpath closure where pedestrians will need to be detoured through the mall.

    • 9 Sep 2026, 1:56 pm · J.R

      Hi @S.B updated CTMP and newly completed NMP are now available for review, thank you. Rev log (CTMP): Updated work schedule and operational period for TGS‑4B, including the associated traffic and pedestrian mitigation measures, have been prepared. Section 6.2.1, Section 8.3, Table 27, Additional appendix for Letters to Residents. Appendix D Accounts: 1x NMP 1x Letters to Residents 1x CTMP amendment

06Every file and folder

91 files in 37 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved