444-448 The Esplanade, Palm Beach
MDP PB Pty Ltd
What's new
- 16 Nov 20266 files saved on SharePoint: C - App Permits NovDec26.pdf, C - App Permits NovDec26.pdf, QPS Signed.pdf, C - QPS App NovDec26.pdf and 2 more
- 14 Nov 20262 files saved on SharePoint: C - QPS App Dec26.pdf, QPS App Dec26.pdf
- 12 Nov 202614 files saved on SharePoint: QAS No Objection.eml, QLD Fire No Objection.eml, QPS No Objection.eml, TRAFFIC CONTROL BOOKING FORM - Template 1.docx and 10 more
- 11 Nov 20261 file saved on SharePoint: Invoice IV0025951.pdf
- 10 Nov 20266 files saved on SharePoint: Permit TRC20262928.pdf, Response 12.08.26.eml, GCC App DA-1078790.pdf, GCC App DA-1078759.pdf and 2 more
- 9 Nov 20266 files saved on SharePoint: Resident Letter.docx, Invoice IV0025879.pdf, Invoice IV0025879.pdf, NTP TRC20262724.pdf and 2 more
Crompton Concepts prepares the traffic management for MDP PB Pty Ltd on this project at 444-448 The Esplanade, 444-448 The Esplanade, Palm Beach, QLD. 1 Monday request is open; the most pressing is at the with client stage; the current CTMP on SharePoint is Rev 10; 3 TGS suites on file (General Rev 07, S1 Rev 07, S2 Rev 00). On the permit boards: 0 permits in force and 7 in progress. Monday holds 12 requests for this job (1 new, 11 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans CC06326
- MondayCC06326-S1 - Rev 7 - MDP PB - 444-448 The Esplanade, Palm Beach
- Client
- MDP PB Pty Ltd
- Crompton job
- CC06326
- Location
- 444-448 The Esplanade, 444-448 The Esplanade, Palm Beach, QLD
- LGA / authority
- —
- Project coordinator
- Christopher Wright
- Latest planner · TMD
- J.G · Christopher Wright
- Monday project status
- New
- Deliverables
- TGS, TMP
- Permits (Monday)
- 0 in force · 7 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 590 in 137 folders
What needs attention now
- Issued, waiting on client: CC06326-S1 - Rev 7 - MDP PB - 444-448 The Esplanade, Palm Beach. Required by 26 Sep 2026. Planner: J.G · TMD: Christopher Wright · Last note (25 Sep 2026, A.A): “@K.R GTG”
- Permit in progress: TRC – Piling Rig Removal (Gold Coast) is Initial Pending. Follow up 17 Nov 2026. Wanted from 24 Nov 2026.
- Permit in progress: AHB – Piling Rig Removal (Gold Coast) is Initial Pending. Follow up 17 Nov 2026. Wanted from 24 Nov 2026.
- Permit in progress: Dewatering Temp Pipe (Gold Coast) is QPS Pending. Follow up 17 Nov 2026. Wanted from 16 Nov 2026.
- Permit in progress: TCP (TMR) is TMR Pending. Follow up 17 Nov 2026. Wanted from 1 Dec 2026.
- Permit in progress: Top Down Slab Concrete Pour (Gold Coast) is QPS Pending. Follow up 18 Nov 2026. Wanted from 11 Dec 2026.
- Permit in progress: Operational (Gold Coast) is Fee Quote/Notice to Pay Received / Sent. Follow up 19 Nov 2026. Wanted from 17 Dec 2026.
- Permit in progress: Footpath Continuous Occupation (Footpath) is Fee Quote/Notice to Pay Received / Sent. Follow up 19 Nov 2026. Wanted from 17 Dec 2026.
PPermits
8 permit lines on the Monday permit boards: 0 in force, 7 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| TRC – Piling Rig Removal Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Date Specific | In progress Initial Pending | 24 Nov 2026 – 27 Nov 2026 | 10 Nov 2026 | 17 Nov 2026 | ||
| AHB – Piling Rig Removal Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Date Specific | In progress Initial Pending | 24 Nov 2026 – 27 Nov 2026 | 10 Nov 2026 | 17 Nov 2026 | ||
| Dewatering Temp Pipe Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Date Specific | In progress QPS Pending | 16 Nov 2026 – 4 Dec 2026 | 30 Sep 2026 | 17 Nov 2026 | ||
| Top Down Slab Concrete Pour Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Date Specific | In progress QPS Pending | 11 Dec 2026 – 16 Dec 2026 | 10 Sep 2026 | 18 Nov 2026 | ||
| TCP Team Kerri · TMR Permits - Kerri | TMR | Date Specific | In progress TMR Pending | 1 Dec 2026 – 1 Mar 2027 | 27 Oct 2026 | 17 Nov 2026 | 25 Jan 2027 | |
| Operational Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Ongoing | In progress Fee Quote/Notice to Pay Received / Sent | 17 Dec 2026 – 17 Mar 2027 | 3 Nov 2026 | 19 Nov 2026 | 1 Feb 2027 | |
| Footpath Continuous Occupation Team Kerri · Gold Coast Permits - Kerri | Footpath | Ongoing | In progress Fee Quote/Notice to Pay Received / Sent | 17 Dec 2026 – 17 Mar 2027 | 3 Nov 2026 | 19 Nov 2026 | 1 Feb 2027 | |
| Oceanway Bollards Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Date Specific | Done |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06326-CTMP-Rev10 - Copy.pdfCTMP Rev 10 · 29 Sep 2026
- PDFCC06326-CTMP-Rev10.pdfCTMP Rev 10 · 29 Sep 2026
- PDF448E0004 - Crompton Concepts.pdf3 Jun 2026
- PDFA01-001_ SITE PLAN - PROPOSED Rev.2 Mark up.pdf11 May 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- PDFGeneral · Concept.pdfRev 07
- PDFS1 · CC06326-TGS-S1-Rev07 - Dewatering.pdfRev 07 + 1 more
- PDFS2 · CC06326-TGS-S2-Rev00.pdfRev 00
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLQAS No Objection12 Nov 2026
- EMLQLD Fire No Objection12 Nov 2026
- EMLQPS No Objection12 Nov 2026
- EMLImportant correspondence from City of Gold Coast12 Nov 2026
- EMLResponse 12.08.2610 Nov 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 10 | 29 Sep 2026 | 11 | CC06326-CTMP-Rev10 - Copy.pdfCC06326-CTMP-Rev10.pdf |
| — | TMP | Rev 10 | 27 Oct 2026 | 11 | CC06326-Long-term Signage Plan.pdfCC06326-Road and Footpath Occupancy Map.pdfCC06326-TMP-Rev10.pdfEmergency Services Notification Letter - Full Road Closure - Draft.pdfG39069L-01C The Esplanade.pdfPublic Notification Letter.pdf+1 more |
| — | NMP | no rev | 7 Sep 2026 | 0 | 444-448 The Esplande - NMP.pdfNMP With Appendix.pdf |
| — | RA | Rev 02 | 24 Sep 2026 | 3 | CC06326-RA-Rev2.pdf |
| General | TGS | Rev 07 | 5 Nov 2026 | 4 | Concept.pdf |
| General | Swept path | Rev 10 | 24 Sep 2026 | 5 | The Esplanade - M2 Measure of MRV swept path.pdf |
| S1 | TGS | Rev 07 | 27 Oct 2026 | 8 | CC06326-TGS-S1-Rev07 - Dewatering.pdfCC06326-TGS-S1-Rev07.pdf |
| S2 | TGS | Rev 00 | 10 Jul 2026 | 1 | CC06326-TGS-S2-Rev00.pdf |
03Requests on Monday
12 requests since 11 May 2026: 1 for new plans and 11 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- Archives and Updates!!
- Paul MCCartypaulm@marqueedp.com.au
- CA - Josh Porterjoshp@marqueedp.com.au
- SM - Matthew Bellmattb@marqueedp.com.au
- PM - Keith Deppelerkeithd@marqueedp.com.au
- 0417 552 6100417 552 610
- Ryan Mcleodryanm@marqueedp.com.au
- 04508645110450864511
Crompton Concepts
- J.GPlanner
- Christopher WrightProject coordinator (Monday), TMD
05Update log
Monday updates and replies on this project's requests, newest first.
- 25 Sep 2026, 12:09 pm · A.A · CC06326-S1 - Rev 7 - MDP PB - 444-448 The Esplanade, Palm Beach
@K.R GTG
- 25 Sep 2026, 7:16 am · K.R · CC06326-S1 - Rev 6 - MDP PB - 444-448 The Esplanade, Palm Beach
No Charge this amendment
- 24 Sep 2026, 10:14 am · Permits · CC06326-S1 - Rev 7 - MDP PB - 444-448 The Esplanade, Palm Beach
Hi @J.G, Kindly see info below: Plans Folder: Plans CC06326 Suite: S1 Please save work here: TGS > Rev 7 TMP > Rev 10 Instructions as provided by @K.R : Dewatering Pipe Work Installation - Amendment in requirements. The neighbouring developer received approval for road widening works in the Esplanade that clashed with the original design for dewatering pipework install. As a result,a change in the design is required and re-lodgement with Council. Refer attached revised design (pipe run in red). We will need to rip up the roadway twice, once for the pipework installation (end of October 2026 next month) and again approx 10 months later for the removal of the pipe (Council will not allow the pipe to be left in the ground. Client is still to confirm if one day or more is required. I will update infor when he calls back. 30285291-10-EA0025-01-CivilQuery.pdf Please design an additional TGSs and TMP Amendment. ***additional info: Road closure from Manhole at the intersection of 25th Ave and The Esplanade. Works will take approx. 1 week to complete. Road will will be opened after hours. Access to the northern end of The Esplanade can be maintained under traffic control - hold and release. Access to the one driveway to the north of site will be maintained during the day via use of road plates. Access to properties south of the site will have to utilise the Alternate Access Arrangements. Original design is no longer viable due to road widening by the neighbouring property. Any…
- 24 Sep 2026, 10:17 am · K.R
@J.G from client * We can maintain access to the 1x house at 454 the esplanade via steel plates. The remainder of dwellings to the south will need to have the 23rd av alternate access implemented. We will need to notify OBX and co-ordinate with them. Council Contact for OPW
- 25 Sep 2026, 9:00 am · J.G
@K.R @Christopher Wright For review. Thank you Additional TGSs added for updated Dewatering Pipe Work Installation with road widening works (TGS 10&11) as instructed above. I didn’t make any changes to the previous TGS (TGS 7 & 8) without road‑widening works, as the amendment would be identical to the new one. This now for review, please let me know if anything needs to be updated. Thank you TGS > Rev 7 TMP > Rev 10
- 25 Sep 2026, 12:52 pm · K.R
@J.G this will need to be updated to the new arrangement. With the section that mentions the old TGS's please make a note that this will not be implemented due to change in design. Watermark the TGS's in the TMP that are not used for this work please
- 25 Sep 2026, 1:14 pm · J.G
@K.R TMP/CTMP updated. Thank you TGS > Rev 7 TMP > Rev 10
- 28 Sep 2026, 12:05 pm · K.R
@J.G The client has reviewed and asked to make the minor change for the after hours - access to the one driveway between the corner and site can be maintained using steel plates but not during working hours, they will have to use the alternative access. The works will be staged so that this can be maintained. Can we also change the colour of the approved road widening as I think this is confusing the working area. Please update the images and information in TMP . Thanks No need to Rev Up.
- 28 Sep 2026, 12:25 pm · J.G
@K.R TGS and TMP updated. Thank you TGS > Rev 7 TMP > Rev 10
- 28 Sep 2026, 1:31 pm · K.R
@J.G - Client has sent the below. Sorry (with regard to the wrong pipe alignment. I think he was confused by the red hashing. Can you check his notes also per below * Dewatering TGS is incorrect (wrong pipe alignment). Please update. * Please make a note/show on TGS that works will be staged with trafficable steel plates as required to maintain access to 454 The Esplanade during work hours. * All other dwellings to south of site will require alternate 23rd av access during work hours. * Works will be staged with steel plates as required to enable the street to be opened up outside of work hours 6:30pm-6:30am.
- 28 Sep 2026, 2:45 pm · J.G
@K.R for confirmation please. Thank you 2. Per client review above, he mentioned no steel plates during working hours. Can we confirm what is the final and if steel plates are also required on the driveway of 454 The Esplanade outside work hours 3. Shown in site active already 4. With a note on plan about the staging, I will add the work hours in the note I think the client is looking at the previous plan TGS 7B & 8B which should be TGS 10B and 11B.
- 29 Sep 2026, 9:52 am · J.G
@K.R Please disregard confirmation above. -I’ve hidden old dewatering plan in TGS and label it not in use on the cover page -added notes on the TGS per client's notes -TMP updated as well For review. Thank you TGS > Rev 7 TMP > Rev 10
- 29 Sep 2026, 2:55 pm · K.R
@J.G can you please update the TGS for the dewatering pipeline per the comments on the TGS below CC06326-TGS-S1-Rev07 - client comments.pdf Many Thanks
- 29 Sep 2026, 3:24 pm · J.G
@K.R All good, thank you Link: TGS > Rev 7 TMP > Rev 10
- 24 Sep 2026, 10:17 am · K.R
- 17 Sep 2026, 8:26 am · K.R · CC06326 - TMP - Rev 8 - MDP PB - 444-448 The Esplanade, Palm Beach
No Charge - MJ required measurements to be added to plan for Oceanway impact for emergencies.
- 17 Sep 2026, 8:19 am · K.R · CC06326-S1 - Rev 5 - MDP PB - 444-448 The Esplanade, Palm Beach
No Charge To Client - Council asking to expand on explanation.
- 16 Sep 2026, 11:20 am · S.B · CC06326-S1 - Rev 6 - MDP PB - 444-448 The Esplanade, Palm Beach
Posted by jaymark@cromptonconcepts.com.au (jaymark@cromptonconcepts.com.au) · @J.G via Work Flow Also updated TMP relevant sections and figures. Links * TGS - Rev 6 * TMP - Rev 9
- 16 Sep 2026, 11:35 am · Permits
Hi @J.G I have new notes from Kelly.. thanks - Shaz Can we please give the option for Porta-boom or flagman, based on the harmonisation it will be 2 x prepare to stops
- 16 Sep 2026, 11:55 am · J.G
@K.G Hi, passing this along to see if it works before I finalise it. Let me know, thank you
- 18 Sep 2026, 7:54 am · Permits
Hi @J.G please finalize.. thank you - Shaz
- 18 Sep 2026, 8:23 am · J.G
Thanks! I've uploaded the updated files for review. * TGS - Rev 6 * TMP - Rev 9
- 16 Sep 2026, 11:35 am · Permits
- 16 Sep 2026, 8:33 am · Permits · CC06326-S1 - Rev 6 - MDP PB - 444-448 The Esplanade, Palm Beach
Hi team! Please save work here: Rev 6 Plans folder: Plans CC06326 Request type: Amendment Make the following amendments, this harmonized with the current site in the area. - prepare to stops on gold coast highway to be changed to flagman's and not porta-booms - Put a red ring around all the signs and label them in the legend as Chippendaries - remove all the signs in the blue box - Green box make this the porta-boom prepare to stop sign Thanks - Shaz
- 23 Sep 2026, 1:50 pm · Christopher Wright
Hi @J.G we have a 40 speed zone in one direction but not the other. the 40 either needs to be removed or a 40 zone needs to be implemented in the opposing direction. This is on all relevant TGS's.
- 23 Sep 2026, 3:09 pm · J.G
@Christopher Files are updated. Thank you Link: * TGS - Rev 6 * TMP - Rev 9 I've kept 40 zone on TGS 7B due to workers near traffic (<1.2m lateral clearance) but removed 40 zone across other TGSs.
- 24 Sep 2026, 6:40 am · Christopher Wright
This is GTG @K.R
- 23 Sep 2026, 1:50 pm · Christopher Wright
- 10 Sep 2026, 9:25 am · K.R · CC06326-S1 - Standalone plan - MDP PB - 444-448 The Esplanade, Palm Beach
No Charge - Portabooms not available - corflute change only
- 10 Sep 2026, 8:16 am · A.A · CC06326-S1 - Standalone plan - MDP PB - 444-448 The Esplanade, Palm Beach
@K.R GTG
- 8 Sep 2026, 2:27 pm · C.R · CC06326-S1 - Standalone plan - MDP PB - 444-448 The Esplanade, Palm Beach
Hi @K.R , This is now for your review. I made 2 PDF's, one is a full set of S1 but 6B shows the TC corflute sign as requested. The other PDF is just TGS 6 alone. Accounts: 1xTGS Amendment (S1-Rev05-6B) Link: Piling Rig No Boom TGS
- 8 Sep 2026, 2:00 pm · K.R · CC06326-S1 - Standalone plan - MDP PB - 444-448 The Esplanade, Palm Beach
No Charge - Very Minor Amendment
- 8 Sep 2026, 1:49 pm · Sandy · CC06326-S1 - Standalone plan - MDP PB - 444-448 The Esplanade, Palm Beach
Plans folder: Plans CC06326 Suite: 1. TGS Save work here: TGS > Piling Rig No Boom TGS Project location: 444-448 The Esplanade, Palm Beach Quote: Request type: Amendment Scope: TGS Specific operations: TGS to amend: TGS number Client mark-ups/attachments: Any specific files the planner needs to refer to?
- 8 Sep 2026, 1:59 pm · K.R
@C.R could you please replace the Boom corflutes with the TC symbolic. This will only be utilised for Thursday piling rig delivery on site so only need a PDF of this plan only done separately. Please do not change the original plans. Please save this version in the Piling Rig No Boom TGS folder. only I have saved a copy of the plan 6B that I need in the folder for reference.
- 8 Sep 2026, 1:59 pm · K.R
- 7 Sep 2026, 9:40 am · Permits · CC06326 - TMP - Rev 8 - MDP PB - 444-448 The Esplanade, Palm Beach
Kerri sent to client 0109 Re_ CRM - 1768226 - LONO Review_ LONO -Review 6 _ Marquee - 444-448 The Esplanade, Palm Beach _TMP Rev 07 and TGSs Rev 4 Plans.eml
- 1 Sep 2026, 11:10 am · S.B · CC06326 - TMP - Rev 8 - MDP PB - 444-448 The Esplanade, Palm Beach
Posted by jaymark@cromptonconcepts.com.au (jaymark@cromptonconcepts.com.au) via Work Flow TMP amendment Links * TGS-Rev5 * TMP-Rev8
- 1 Sep 2026, 10:00 am · Permits · CC06326 - TMP - Rev 8 - MDP PB - 444-448 The Esplanade, Palm Beach
Hi @J.G Please save work here: 2. TMP > Rev 8 Kerri will add details below. thanks - shaz
- 1 Sep 2026, 10:06 am · K.R
@J.G - We will also need to update the revision and Change log. One final update to the Road and Footpath Occupancy Map. Council comments:- Area measurement of the impacted ocean way footpath 20/08 This is not in regards to payment, this is to determine where is the location and the extended impact. 1/09 Acknowledged that RPEQ document has been provided, however, area measurements (L x W) was not provided in Road and Footpath Occupancy Map. Measurements provided by Keith See attached measure, 355m2 of the MRV swept path (I confirmed over the phone with MJ this is the measurement she wanted). The Esplanade - M2 Measure of MRV swept path.pdf
- 3 Sep 2026, 10:42 am · Christopher Wright
This is GTG
- 1 Sep 2026, 10:06 am · K.R
06Every file and folder
590 files in 137 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|