Brisbane International Airport Carpark

Dowells

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Dowells on this project at 11 The Circuit, Brisbane Airport, QLD. No Monday request is open right now; the latest one closed recently; 3 TGS suites on file (General no rev, S0 Rev 01, S1 Rev 04). Monday holds 6 requests for this job (1 new, 5 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Dowells
Crompton job
CC06461
Location
11 The Circuit, Brisbane Airport, QLD
LGA / authority
City of Brisbane
Project coordinator
K.R
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS
Permits (Monday)
None on the permit boards
Last activity
8 Oct 2026
Files on SharePoint
30 in 13 folders

What needs attention now

  1. Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

    Nothing filed for this yet.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

    Nothing filed for this yet.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
GeneralTGSno rev7 Jul 20260GHD pack - Traffic 260630 ADAM Copy.pdf
S0TGSRev 0115 Aug 20262CC06461-S0-TGS-Rev01.pdf
S1TGSRev 0410 Sep 20265CC06461-S1-TGS-Rev04.pdf

03Requests on Monday

6 requests since 7 Jul 2026: 1 for new plans and 5 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06461-S1 - Rev 4 - Dowells - Brisbane International Airport CarparkAmendmentS1Rev 04Invoiced
Invoiced
10 Sep 202612 Sep 2026
CC06461-S1 - Rev 3 - Dowells - Brisbane International Airport CarparkAmendmentS1Rev 03Closed
No Charge
2 Sep 20264 Sep 2026
CC06461-S1 - Rev 2 - Dowells - Brisbane International Airport CarparkAmendmentS1Rev 02Invoiced
Invoiced
1 Sep 20263 Sep 2026
CC06461-S0 - Rev 1 - Dowells - Brisbane International Airport CarparkAmendmentS0Rev 01Closed
No Charge
25 Aug 202627 Aug 2026
CC06461-S1 - Dowells - Brisbane International Airport CarparkAmendmentS1Invoiced
Invoiced
25 Aug 202627 Aug 2026
CC06461 - Dowells - Brisbane International Airport CarparkNew plansInvoiced
Invoiced
7 Jul 20269 Jul 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 5 TGS AMENDMENT INV IV0025312 Invoice IV0025312 - Re MLCP2 - TGS Required for works within existing carpark .eml

  2. This is non Billable as per Patrick. Thank you. - Lexi

  3. 4 TGS AMENDMENT INV IV0024998 Invoice IV0024998 - Re MLCP2 - TGS Required for works within existing carpark .eml

  4. 4 TGS NEW INV IV0024998 Invoice IV0024998 - Re MLCP2 - TGS Required for works within existing carpark .eml

  5. No Charge this amendment - minor updates to show detour route and additional frontage

  6. @K.R 5x major TGS amendments. TGS 2,4,5 completely redesigned due to change in work area locations and SOW resulting in new control measures required. TGS 1,3 minor amendments to existing work zones Rev 04

  7. Hi, I have a dowels allocation that needs to be added to monday: Brisbane International Airport Carpark - CC06461-S1-Rev04. Request was for 5xTGS amendments (major amendments). This request has been completed and sent to client. Email and work saved in below folder: Plans folder:Plans - CC06461 Suite: S1- Potholing Works Save work here: TGS >Rev 04 Project location:Brisbane International Airport Carpark Quote:N/A -Kareiin

  8. Plans sent to client - Re_ MLCP2 - TGS Required for works within existing carpark .eml

  9. Hi, Kindly see instructions below. Plans Folder: Plans - CC06461 Suite: S1- Potholing Works Save work here: TGS > Rev 03 Project Location: Brisbane International Airport Carpark Quote: none Request type: Amendment Scope: TGS Specific operations: Hi Pat, After a couple of minor ones here please when you are back on deck. If I can get these back Friday morning at the latest if possible, please mate? * In response to TGS 1B, they have marked up the correct detour route; this currently shown as traversing through carparks. Please amend, * Further, they have picked up an additional Workfront in TGS 3B which will result in a road closure and require TC support to manage traffic flow. Please update also. TGS to amend: Client mark-ups/attachments: see attached document and email request MLCP2_Services Investigations - Traffic Guidance Scheme [03].pdf RE_ MLCP2 - TGS Required for works within existing carpark .eml thanks thanks ~ clint

    • 2 Sep 2026, 5:05 pm · J.R

      Hi @Christopher Wright for review, thanks! Rev log: Amended TGS 1 to revise the detour route serving carpark traffic movements. TGS 3 updated to add carpark work area causing half-road closure and detour. Accounts: 2x TGS amendment (TGS 1 and 3)

    • 3 Sep 2026, 12:52 pm · Christopher Wright

      This is GTG

  10. File link: Rev 02 ** Hi Pat, Many thanks for these again. They have come back with some minor amendments from their client review. This one is not a mad rush, Monday will be fine for this one mate. let me know if this is an issue with the other works I have sent you today. Regards, Adam McCotter RE_ MLCP2 - TGS Required for works within existing carpark (1).msg

  11. Created this Monday line for invocing purposes only - Lexi

  12. 2x TENDERS 4x SWEPT PATH INV IV0024997 Invoice IV0024997 - Re_ Brisbane International Airport - Tender Plans - Multi Storey Car park.eml

  13. Plans sent by Patrick. - Lexi ** Hi Adam, Please see attached for Brisbane Int'l Airport carpark. Glad I wasn't too far off on these Re_ Brisbane International Airport - Tender Plans - Multi Storey Car park.eml