← All projectsCC06475
Project portal · built 17 Nov 2026, 10:03 am AEST · With client

82 Nelson St Kalinga

John England

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for John England on this project at 82 Nelson St Kalinga, Wooloowin. 1 Monday request is open; the most pressing is at the with client stage; 1 TGS suite on file (S1 Rev 04). On the permit boards: 0 permits in force and 0 in progress. Monday holds 2 requests for this job (1 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
John England
Crompton job
CC06475
Location
82 Nelson St Kalinga, Wooloowin
LGA / authority
—
Project coordinator
Ethan Mathews
Latest planner · TMD
Christopher Wright · Christopher Wright
Monday project status
New
Deliverables
TGS
Permits (Monday)
0 in force · 0 in progress
Last activity
24 Sep 2026
Files on SharePoint
38 in 13 folders

What needs attention now

  1. Issued, waiting on client: CC06475-S1 - Rev 1 - John England - 82 Nelson St Kalinga. Required by 19 Sep 2026. Planner: Christopher Wright · TMD: Christopher Wright · Last note (24 Sep 2026, Permits): “plans has been sent and permit has been amended - Shaz”

PPermits

1 permit line on the Monday permit boards: 0 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Footpath
Team Neil · BCC Footpath Applications - Neil
Register: Initial · Permit RC-14467-3 · Not Invoiced · PC check: On Hold permit folder · Shuttle is lane closure with hold and release
FootpathDate SpecificExpired
Done
31 Aug 2026 – 4 Oct 20267 Sep 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

    Nothing filed for this yet.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
S1TGSRev 0422 Sep 20265CC06475-TGS-S1-Rev04- John England - 82 Nelson St Kalinga.pdf

03Requests on Monday

2 requests since 14 Jul 2026: 1 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06475-S1 - Rev 1 - John England - 82 Nelson St KalingaAmendmentS1Rev 01With client
Client review
17 Sep 202619 Sep 2026Christopher WrightChristopher Wright
CC06475 - John England - 82 Nelson St KalingaNew plansInvoiced
Invoiced
14 Jul 202616 Jul 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • Christopher WrightPlanner, TMD
  • Ethan MathewsProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. plans has been sent and permit has been amended - Shaz

  2. Hi Team, Save work here: Rev 01 @K.R to add more details. Thank you - Shaz

    • 18 Sep 2026, 1:30 pm · Permits

      Confirming that the Amended TGS was sent to client by Neil - Iris Fw_ TGS Revised- 82 Nelson St Kalinga.eml

06Every file and folder

38 files in 13 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved