92 Jefferson Lane, Palm Beach

Barlow Building & Construction Pty Ltd

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Barlow Building & Construction Pty Ltd on this project at 92 Jefferson Lane, Palm Beach, QLD. 2 Monday requests are open; the most pressing is at the in drafting stage; the current CTMP on SharePoint is Rev 02; 1 TGS suite on file (S1 Rev 01). On the permit boards: 0 permits in force and 2 in progress. Monday holds 3 requests for this job (1 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Barlow Building & Construction Pty Ltd
Crompton job
CC06480
Location
92 Jefferson Lane, Palm Beach, QLD
LGA / authority
—
Project coordinator
C.H
Latest planner · TMD
J.G · Christopher Wright
Monday project status
New
Deliverables
Council Road Permit, Footpath Permit, RA, TGS, TMP, TA, Traffic Control
Permits (Monday)
0 in force · 2 in progress
Last activity
10 Nov 2026
Files on SharePoint
111 in 35 folders

What needs attention now

  1. Urgent In drafting: CC06480- S1 - Rev 2 - Barlow Building - Whitehaven - 92 Jefferson Lane, Palm Beach. Required by 6 Nov 2026 (overdue). Planner: J.G · TMD: Christopher Wright · Last note (10 Nov 2026, S.B): “Hi Team, Council comments not addressed yet: * Works zone. Council said it won't be supported and to remove it from the CTMP. It's still in 7.1.2 (Figure 4, Table 15), 5.2.1, 6.4,…”
  2. Complete, to be invoiced: CC06480- S1 - Rev 1 - Barlow Building - Whitehaven - 92 Jefferson Lane, Palm Beach. Required by 24 Oct 2026. · Last note (9 Nov 2026, K.R): “Haulage plan added - $455.00 quoted in client email below. Re_ 92 Jefferson.eml”
  3. Permit in progress: CMP (CMP / LONO) is Council Pending.
  4. Permit in progress: LONO (CMP / LONO) is Council Pending.

PPermits

2 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
CMP
Team Kerri · BCC CMP Lodgement / GCCC LONO Lodgement
CMP / LONOIn progress
Council Pending
LONO
Team Kerri · BCC CMP Lodgement / GCCC LONO Lodgement
CMP / LONOIn progress
Council Pending

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 026 Nov 20263CC06480-CTMP-Rev02.pdf
—TMPRev 026 Nov 20263CC06480-TMP-Rev02.pdf
—RARev 016 Nov 20262CC06480-RA-Rev01.pdf
—TIARev 026 Nov 20262CC06480-TIA-Jefferson Ln.pdfCC06480-TIA-Seventh Ave.pdf
—Letter to residentsRev 026 Nov 20262Letter to Residents - draft.pdf
S1TGSRev 016 Nov 20262CC06480-TGS-S1-Rev01.pdf

03Requests on Monday

3 requests since 17 Jul 2026: 1 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06480- S1 - Rev 2 - Barlow Building - Whitehaven - 92 Jefferson Lane, Palm Beach UrgentCouncil RFIS1Rev 02In drafting
Requested Info
4 Nov 20266 Nov 2026J.GChristopher Wright
CC06480- S1 - Rev 1 - Barlow Building - Whitehaven - 92 Jefferson Lane, Palm BeachAmendmentS1Rev 01To invoice
To Be Invoiced
22 Oct 202624 Oct 2026
CC06480 - Barlow Building - Whitehaven - 92 Jefferson Lane, Palm BeachNew plansInvoiced
Invoiced
17 Jul 202621 Jul 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • J.GPlanner
  • Christopher WrightTMD
  • C.HProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi Team, Council comments not addressed yet: * Works zone. Council said it won't be supported and to remove it from the CTMP. It's still in 7.1.2 (Figure 4, Table 15), 5.2.1, 6.4, and as the control method in 7.5 (1C) and 7.7 (4C). The Works Zone Plan is also still sitting in the appendices, and the change log says we updated the image. Please take it out completely. Daily arrangement should line up with Permit 1 (verge/footpath closure with H&R). * 3C full road closure. Council won't support daily, Tue and Thu only. Table 30 still says frequency "Daily" for 1 yr 9 months. Update to Tue/Thu only and make 7.6 and 7.10 say the same. 7.10 also says "approved two-day-per-week windows". Nothing's approved yet, so word it as proposed. * Detours on 5E, 6C, 8C, 9C. Council said these conflict with our own 2 Palm Ave TGS and asked for a different methodology. The CTMP still picks full road closure and detour for all of them with the same reasoning, and 2 Palm Ave isn't mentioned anywhere. Either change the methodology or show how the detour has been coordinated with 2 Palm Ave. Also every Impacts table says "Other adjacent developments: No", which can't be right with 2 Palm Ave next door. * 4C hardstand. Council wanted the partial lane measurement (our note says 10.15m x 1m). 7.7 now says the hardstand is 8m x 5m on the Gold Coast Hwy side, which doesn't match Jefferson Lane at all. Please sort out which is right and put the measurement on 4C and in the CTMP. * Jefferson Lane width.…

    • 11 Nov 2026, 10:58 am · C.R

      Hi @S.B , Thanks for this. I will look into it after my current tasks.

    • 11 Nov 2026, 4:09 pm · C.R

      Hi @S.B / @K.R / @Riri D. , Sorry, I'm so lost with the comments above. I've gone through Sanju's comments and was at a lost. Were there internal discussions for this project prior to me taking over? There were specific council and TMD comments that I am unsure how to address I don't have a copy of the previous communications with council and was just asked to do an additional TGS and a go-over of this document: Job Request_Watermarked.pdf. Can we please tap the original planner for this project as he/she might have an idea on how to address Sanju's/Client's comments? I might miss or incorrectly include important details that are necessary to the project. If you need me to do the amendments, can I please request a full project turnover just so I understand what's happening/what has happened throughout the course of this request? Please advise how would you like me to proceed with this.…

    • 12 Nov 2026, 7:46 am · K.R

      @C.R can you please reach out to me when you are online.

    • 13 Nov 2026, 8:27 am · C.R

      Hi @K.R, good day! I'll reach out via Teams. Thanks.

    • 16 Nov 2026, 2:05 pm · Riri D.

      As discussed on teams, @J.G will take over from here and as per Kerri's instruction. Fyi @C.R . THanks guys

    • 16 Nov 2026, 2:11 pm · C.R

      @Riri D. Thank you. Adding here the email sent by Kerri this morning. It might help Jaymark with the comments from Sanju. Fw_ CRM - 1831606 - LONO Review 1 -1079 Gold Coast Highway Palm Beach QLD 4221 Australia (Whitehaven) _TMP Rev 00 and TGSs Rev 00Plans.eml

  2. Haulage plan added - $455.00 quoted in client email below. Re_ 92 Jefferson.eml

  3. Hi @Christopherand @K.R , All comments/amendment requests have been accounted for. This is now for review. Thanks. Accounts: 1xAdd'l TGS (S1-Rev01-TGS 11) 1xTGS Amendment (S1-Rev01-TGS 3) 1xTMP Amendment 1xRA Amendment Link: TGS & TMP > Rev 02

  4. Plans folder: Plans - CC06480 Suite: S1 Save work here: TGS & TMP > Rev 02 Project location: 92 Jefferson Lane, Palm Beach Quote: none Job request form: YES Request type: Amendment Scope: TGS & TMP LONO Feedback Update - No charge to Client for TMP update, 1 Additional TGS can be charged. Job request form with responses saved in the folder. Fairly urgent. thanks

  5. Hi @Christopher Wright and @Riri D. for review. Link: TMP Accounts 1x TMP = Added Appendix D Haulage Route to TMP and CTMP 1x CTMP Thank you!

  6. Hi Plans folder: Plans CC06480 Suite: Save work here: TMP > Rev 01 Project location: 92 Jefferson Lane, Palm Beach Quote: N/A Request type: Amendment Scope: TMP Specific operations: Allocation for Barlow Building - 92 Jefferson Lane Palm Beach - Haulage Route to be added to CTMP. Thank you. TMP to be revised up and change log updated. Client mark-ups/attachments: Any specific files the planner needs to refer to? Job Request_Watermarked.pdfCC06413-Haulage Route - Example.docx

    • 26 Oct 2026, 10:40 am · Christopher Wright

      This is GTG @K.R

  7. Ready for invoicing Could you please remove the workzone plan charge when invoicing as Pete has already advised me that they will not install a workzone in this location. This will be removed from the plans in the review. Thanks

    • 3 Nov 2026, 1:08 pm · Riri D.

      invoice IV0025828 sent to client Re_ CMP - Barlow Building 92 Jefferson Lane Palm Beach .eml

  8. Plans sent to client - Kerri 2309 Re_ 92 Jefferson.eml

  9. @S.B @A.A For TMD Review. Thank you Accounts: 10x TGS 1x TIA 1x RA 1x Works Zone Plan 1x Road and Footpath Occupancy Map 1x TMP Link: Plans CC06480 - Rev 0TGS Requirement confirmed from discussion with Aaron: TGS Requirement Confirmed.docx

    • 23 Sep 2026, 8:30 am · Christopher Wright

      This is GTG @K.R

  10. If there are any updates on this allocation based on what we requested to client on 18/08, please let me know. Changing the status to Requested Info. Thank you Construction Methodology and Program Information Required.docxThe word file is also available in folder - Rev 0

    • 2 Sep 2026, 4:43 pm · Riri D.

      @J.G As per Kerri, this is currently pending information from the client. She has followed up with them via email

    • 7 Sep 2026, 2:18 pm · Riri D.

      @J.G attached is their TMP details. Please consult with @K.R if you still require further info or details. Thanks! TMP Project Information Request (1).docx Save work here: Rev 00

    • 8 Sep 2026, 7:26 am · K.R

      @J.G Hi Jaymark - The client provided further information. I have downloaded the docs and saved in the below link. Let me know if you require anything further. Thank you. Client Docs

    • 9 Sep 2026, 1:03 pm · J.G

      @K.R Hi Kerri, apologies for the late reply, I just needed a bit of time to take all the information in. Would it be possible to get an updated quote with the required TGSs? With this new information from client, a few construction stages weren't covered in the initial quote, and I still have some confirmation on the traffic impacts for some of the stages. I’ve created and attached a TGS requirement confirmation for you to review as well. Thanks so much TGS Requirement Confirmation.docx

    • 16 Sep 2026, 11:18 am · K.R

      @J.G Can you let me know what stages you have that arent covered. Unfortunately I have limited knowledge of the project and amy trying to catch up. If you can give me what you think we should add I will liaise with Aaron to see if he can assist me with the list.

    • 16 Sep 2026, 11:35 am · J.G

      @K.R Hi Kerri, initially the TGS requirements are 8 TGS per Carly from the first update below on this allocation. 1. Daily Arrangement 2. Aftercare 3. Full Road Closure 4. Hardstand Installation 5. Excavation/Piling Rig delivery and Removal 6. Stormwater/Sewer Connections 7. Concrete Pours 8. Tower Crane Install/Dismantle With the new additional info from client Construction Methodology and Program Information Required (3) (1).docx additional TGS may be required for 1. Landscaping and External Works 2. Crossover Works I’ve created and attached a TGS requirement confirmation for you to review as well. Thanks so much TGS Requirement Confirmation.docx

    • 17 Sep 2026, 3:20 pm · A.A

      @J.G Please proceed as discussed.

  11. @J.G Can you please remove the Works Zone and replace with a partial lane closure same measurement as the works zone. I have also requested information from the client.

  12. Information request sent to client 19.08.26. Construction Methodology and Program Information Required.docx