Harris Terrace
Quadric
What's new
- 16 Nov 20261 file saved on SharePoint: Quote QU5804.pdf
- 13 Nov 20261 file saved on SharePoint: Re Att Chelsea - Harris Terrace footpath and lane closure permits.eml
- 12 Nov 20264 files saved on SharePoint: BCC Cert RC-17274-5 - Display.pdf, BCC Cert RC-17274-5 - Complete.pdf, BCC Cert RC-17274-6 - Complete.pdf, BCC Cert RC-17274-6 - Display.pdf
- 9 Nov 20262 files saved on SharePoint: BCC Cert RC-15550-5 - Complete.pdf, BCC Cert RC-15550-5 - Display.pdf
- 11 Sep 2026, 12:54 pmPermits on CC06491 - Quadric - Harris Terrace - 68 George St, Brisbane City: IV0025236 sent to client - Shaz 1109 as per QU-4980 1x tmp 1x ra 1x tia 4x 5tgs Re_ Re_ Harris Terrace - Quote for base build works project.eml
- 10 Sep 2026, 6:23 pmRiri D. on CC06491 - Quadric - Harris Terrace - 68 George St, Brisbane City: Chelsea team catch up 10-09-26.pdf Invoice as per QU-4980
Crompton Concepts prepares the traffic management for Quadric on this project at 68 George St, Brisbane City. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 00; 2 TGS suites on file (General Rev 00, S1 Rev 00). On the permit boards: 0 permits in force and 2 in progress. Every file opens straight from SharePoint.
- Client
- Quadric
- Crompton job
- CC06491
- Location
- 68 George St, Brisbane City
- LGA / authority
- —
- Project coordinator
- —
- Latest planner · TMD
- —
- Monday project status
- New
- Deliverables
- TGS, TMP, RA
- Permits (Monday)
- 0 in force · 2 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 96 in 34 folders
What needs attention now
PPermits
2 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| Road Team Neil · BCC Road Permits - Neil | BCC road | Ongoing | In progress Amendment Requested | 27 Nov 2026 – 27 Dec 2026 | 5 Oct 2026 | 16 Nov 2026 | 16 Nov 2026 | |
| Footpath Team Neil · BCC Footpath Applications - Neil | Footpath | Date Specific | In progress Amendment Requested | 11 Jan 2027 – 26 Feb 2027 | 7 Oct 2026 | 13 Nov 2026 | 16 Nov 2026 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06491-CTMP-Rev00.pdfCTMP Rev 00 · 5 Oct 2026
- PDFAppendix G_14758 DBC Queens Wharf Brisbane Harris Tce External Works - General site plan rev 0.pdf3 Aug 2026
- PDF14758 DBC Queens Wharf Harris Tce - Site Plan Rev0.pdf3 Aug 2026
- PDF14758 DBC Queens Wharf Brisbane Harris Tce External Works - General site plan rev 0.pdf3 Aug 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 00 | 5 Oct 2026 | 1 | CC06491-CTMP-Rev00.pdf |
| — | TMP | Rev 00 | 8 Aug 2026 | 1 | Appendix G_14758 DBC Queens Wharf Brisbane Harris Tce External Works - General site plan rev 0.pdfCC06491-TMP-Rev00.pdfTMP Project Information Request.pdfTMP Risk Report.pdf |
| — | RA | Rev 00 | 20 Aug 2026 | 1 | RA.pdf |
| — | TIA | Rev 00 | 3 Aug 2026 | 1 | TIA Report - 68 George St, Brisbane City.pdf |
| General | TGS | Rev 00 | 7 Aug 2026 | 1 | 14758 DBC Queens Wharf Brisbane Harris Tce External Works - General site plan rev 0.pdf14758 DBC Queens Wharf Harris Tce - Site Plan Rev0.pdfGeorge Street Stop 114 near Alice St, Brisbane City _ Translink.pdfGeorge Street Stop 115 near Charlotte St, Brisbane City _ Translink.pdf |
| S1 | TGS | Rev 00 | 5 Oct 2026 | 1 | CC06491-S1-TGS-Rev00.pdf |
03Requests on Monday
1 request since 22 Jul 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06491 - Quadric - Harris Terrace - 68 George St, Brisbane City | New plans | Invoiced Invoiced | 22 Jul 2026 | 24 Jul 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- CA - Marrisa Jepson
- 04166041820416604182
- marisa@quadric.com.aumarisa@quadric.com.au
- PM - Diego Navarro
- 0412 082 3420412 082 342
- diego@quadric.com.audiego@quadric.com.au
05Update log
Monday updates and replies on this project's requests, newest first.
- 11 Sep 2026, 12:54 pm · Permits · CC06491 - Quadric - Harris Terrace - 68 George St, Brisbane City
IV0025236 sent to client - Shaz 1109 as per QU-4980 1x tmp 1x ra 1x tia 4x 5tgs Re_ Re_ Harris Terrace - Quote for base build works project.eml
- 10 Sep 2026, 6:23 pm · Riri D. · CC06491 - Quadric - Harris Terrace - 68 George St, Brisbane City
Chelsea team catch up 10-09-26.pdf Invoice as per QU-4980
- 20 Aug 2026, 2:04 pm · A.A · CC06491 - Quadric - Harris Terrace - 68 George St, Brisbane City
@Riri D. GTG. I have made some amendments. Give it 5 - 10 mins to update online.
- 1 Sep 2026, 8:20 pm · Riri D.
Plans sent to client for review - Re_ Harris Terrace - Quote for base build works project.eml
- 1 Sep 2026, 8:20 pm · Riri D.
06Every file and folder
96 files in 34 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|