← All projectsCC06527
Project portal · built 17 Nov 2026, 10:03 am AEST · To invoice

Armstrong St, Petrie

Balmain & Co

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Balmain & Co on this project at Armstrong St, Petrie, QLD. 1 Monday request is open; the most pressing is at the to invoice stage; the current CTMP on SharePoint is Rev 01; 3 TGS suites on file (General no rev, S1 Rev 00, S2 Rev 00). Monday holds 3 requests for this job (1 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Balmain & Co
Crompton job
CC06527
Location
Armstrong St, Petrie, QLD
LGA / authority
—
Project coordinator
Ethan Mathews
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS
Permits (Monday)
None on the permit boards
Last activity
12 Nov 2026
Files on SharePoint
77 in 33 folders

What needs attention now

  1. Urgent Complete, to be invoiced: CC06527 - S1 - Rev 1 - Balmain & Co - Armstrong St, Petrie. Required by 1 Nov 2026. · Last note (12 Nov 2026, Ethan Mathews): “@Permits / @Lexi R / @Riri D. ACCOUNTS: See invoicing notes below x1 CTMP amendment to include RPEQ Haulage Route x1 RPEQ Haulage Route (Refer Engineering Board) - Please Charge…”

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

3 requests since 18 Aug 2026: 1 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06527 - S1 - Rev 1 - Balmain & Co - Armstrong St, Petrie UrgentAmendmentS1Rev 01To invoice
To Be Invoiced
30 Oct 20261 Nov 2026
CC06527 - S2 - Balmain & Co - Armstrong St, PetrieAmendmentS2Invoiced
Invoiced
24 Aug 202626 Aug 2026
CC06527 - Balmain & Co - Armstrong St, PetrieNew plansInvoiced
Invoiced
18 Aug 202620 Aug 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • Ethan MathewsProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 12 Nov 2026, 5:13 pm · Ethan Mathews · CC06527 - S1 - Rev 1 - Balmain & Co - Armstrong St, Petrie

    @Permits / @Lexi R / @Riri D. ACCOUNTS: See invoicing notes below x1 CTMP amendment to include RPEQ Haulage Route x1 RPEQ Haulage Route (Refer Engineering Board) - Please Charge $650.00 for the Haulage Route RPEG Swept Path

  2. Hi @S.B and @Riri D., for review Link: Sharepoint - Documents - Rev 01 - All Documents Accounts: 1x TMP - Added Appendix F for Haulage Route 1x Haulage Route - Created Haulage Route Document 1x CTMP - Reflected Changes for Haulage Route Thank You!

  3. For reference only

  4. May I please have a haulage route completed for Balmain & Co - Armstrong St project. Please have one for heavy vehicles such as truck and dog and HRV as well as AV vehicles. Please also have this amended into the CTMP and save the folders below: Main Folder Link: Armstrong St, Petrie TGS: Rev 01 CTMP: Rev 01 Thank you! 🧡Kim

    • 2 Nov 2026, 12:16 pm · Riri D.

      Can I please have this added into the CTMP for Balmain & Co Armstrong St project as an appendix and an additional section in the CTMP that talks about the Haulage Route. Haulage Route-Armstrong St.pdf

    • 3 Nov 2026, 11:45 am · Riri D.

      @Leo Escoton can you please amend the CTMP as per above request?

    • 3 Nov 2026, 1:49 pm · Ethan Mathews

      @Leo Escoton Hi Leo, please follow the allocation instructions carefully from Rih, she has provided the Haulage Route Swept Path RPEQ Design and advised to add that into the CTMP and also to add in a section in the CTMP that discusses this Haulage Route. Please re-amend the CTMP to be accurate to the above instructions. Thank you

    • 3 Nov 2026, 3:16 pm · Leo Escoton

      Hi @Ethan Mathews , already uploaded the new one. I've removed the one I made, Added section 8.1.2 for Haulage Route, and Appendix F with the attached RPEQ from Sanju.

    • 3 Nov 2026, 4:57 pm · Ethan Mathews

      @Christopher Wright Hey mate, I have checked this changes @Leo Escoton has completed and happy with this. Sent to the client - FYI Changing status to "Client Review" - @Riri D. FYI

  5. 9 Sep 2026, 1:27 pm · Permits · CC06527 - S2 - Balmain & Co - Armstrong St, Petrie

    IV0025069 sent to client - Shaz 0909 2x New TGS 1x New Minor TMP Re_ Invoice for August Works.eml

  6. 28 Aug 2026, 4:38 pm · Permits · CC06527 - Balmain & Co - Armstrong St, Petrie

    IV0025068 sent to client - Shaz 2808 as per QU-5480 1x tmp med 1x ra 1x tiqe 7x 5tgs Invoice IV0025068 from Crompton Concepts for 11 Armstrong St, Petrie Plans.eml

    • 9 Sep 2026, 9:04 am · Permits

      08/09 Hi Team, We have not received a credit application for 15 Armstong Street Petrie Pty Ltd as yet. As such any invoice which have been issued to Balmain are required to be paid as per the invoice. - Kerston Re Invoice for August Works.eml

  7. 28 Aug 2026, 4:22 pm · Permits · CC06527 - Balmain & Co - Armstrong St, Petrie

  8. 18 Aug 2026, 5:49 pm · Permits · CC06527 - Balmain & Co - Armstrong St, Petrie

    Hi, Please save work Here Plans folder: Plans - CC06528 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: Armstrong St, Petrie Quote: QU5480 (Amended one) Request type: 4x New TGSs & 1x Medium TMP as per QU5480 Scope: TGS & TMP as per QU5480 Client mark-ups/attachments: see attached documents and email thread. Also, uploaded in Rev 00 folder for reference Quote QU5480 - Planning Estimate (Amended).pdf HOIST ELEVATION - 260810 (SECTION REQUIRED).pdf Scaffold Plan - Architectural Plans.pdf 130T Grove - Load Chart.pdf 260730 - Roof -Sectional Pumping Plan.pdf 260810 - HOIST Plan View - Architectural Plans.pdf Approved - Architectural Plans.pdf Decision Notice - MBRC.pdf Email: Fw_ Armstrong St - Petrie - ECI - Crompton Concepts.eml Thank you! 🧡Kim

    • 22 Aug 2026, 5:18 pm · J.R

      Hi @Christopher Wright for review, thank you! Accounts: 6x TGS 1x Long-term Signage Plan 1x Medium CTMP 1x Desktop RA 1x Short TIA

    • 26 Aug 2026, 9:48 am · Christopher Wright

      This is GTG

    • 26 Aug 2026, 4:11 pm · Riri D.

      Hi @J.G as per Ethan, please amend the below TGS: CC06527-S1-2D to Remove the TC and amend the notation to say if and when required, a Traffic Controller will be stationed to assist with the pedestrian diversion and footpath closure. TMP will need to be amended to update and reflect this also. No need rev up amend plans on the ff folder: S1 - Early Works & Construction Phase TGS > Rev 00 TMP > Rev 00

    • 26 Aug 2026, 4:40 pm · J.G

      @Riri D. @Christopher Wright TGS-S1-2D and TMP updated. For review, thank you TGS > Rev 00 TMP > Rev 00

    • 27 Aug 2026, 7:53 am · Christopher Wright

      This is GTG

06Every file and folder

77 files in 33 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved