← All projectsCC06534
Project portal · built 17 Nov 2026, 10:03 am AEST · TMD approved

15 Sunrise Blvd Surfers Paradise - Cavela

BDCM

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for BDCM on this project at 15 Sunrise Boulevard, Surfers Paradise. 1 Monday request is open; the most pressing is at the TMD approved stage; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 00). On the permit boards: 0 permits in force and 3 in progress. Monday holds 2 requests for this job (1 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
BDCM
Crompton job
CC06534
Location
15 Sunrise Boulevard, Surfers Paradise
LGA / authority
—
Project coordinator
K.R
Latest planner · TMD
C.R · Christopher Wright
Monday project status
New
Deliverables
—
Permits (Monday)
0 in force · 3 in progress
Last activity
2 Nov 2026
Files on SharePoint
123 in 51 folders

What needs attention now

  1. TMD approved, ready to issue: CC06534-S1 - Rev 1 - BDCM - 15 Sunrise Blvd Surfers Paradise (TMP). Required by 27 Sep 2026 (overdue). Planner: C.R · TMD: Christopher Wright · Last note (25 Sep 2026, C.R): “Hi @K.R , This is now for TMD review. I've taken everything into account. No changes in the TGS suite, only TMP amendment. TMP changes are recorded in the change log for…”
  2. Permit in progress: CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise (CMP / LONO) is Council Pending.
  3. Permit in progress: CMP (CMP / LONO) is Council Pending.
  4. Permit in progress: LONO (CMP / LONO) is Council Pending.

PPermits

3 permit lines on the Monday permit boards: 0 in force, 3 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
Team Neil · BCC CMP Lodgement / GCCC LONO Lodgement
CMP / LONOIn progress
Council Pending
CMP
Team Neil · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONOIn progress
Council Pending
24 Sep 2026
LONO
Team Neil · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONOIn progress
Council Pending
24 Sep 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

2 requests since 20 Aug 2026: 1 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06534-S1 - Rev 1 - BDCM - 15 Sunrise Blvd Surfers Paradise (TMP)AmendmentS1Rev 01TMD approved
TMD Approved
25 Sep 202627 Sep 2026C.RChristopher Wright
CC06534 - BDCM - 15 Sunrise Blvd Surfers ParadiseNew plansInvoiced
Invoiced
20 Aug 202628 Aug 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • C.RPlanner
  • Christopher WrightTMD
  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 16 Oct 2026, 2:19 pm · Riri D. · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise

    Invoice sent to client Fw_ Tunnel bore mark up {P.0849471.D.01} Stg 1 288-290 BRISABNE TCE, Goodna - EDEN ESTATE .eml

  2. 16 Oct 2026, 12:48 pm · Riri D. · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise

  3. Hi @K.R , This is now for TMD review. I've taken everything into account. No changes in the TGS suite, only TMP amendment. TMP changes are recorded in the change log for reference. If there are other changes needed, please let me know. Thank you. Accounts: 1xTMP Amendment (S1-Rev1) 1xAdd'l Detailed Haulage Route Document 1xAdd'l Notification Letter to Residents with Area of Notification Total TMP Amendment Time: 3.0 Hours Link: Rev 01

  4. Hi Team! Please save work here: S1 > Rev 1 Plans folder: Plans - CC06534 @K.R will add details below. Thank you - Shaz

    • 25 Sep 2026, 12:30 pm · K.R

      @C.R Can we update a few items in the TMP for this one. Can you please add sections for the below * Other City Approved Developments * TMR Roads * Haulage Route * Introduction Letter Draft * Notification Letter Draft (i.e road closure) * Notification Area, area where these letters will be distributed. * After Hours Permit Requirements Plans CC06326 - This is the plans link for Marquee Developments Palm Beach. There are some letters in this one that you could adapt for this project using the BDCM Logo. From what I can see on near maps there does not seem to be any near by approved developments, can you add this section and just state that there is none near by. TMR Roads - Same with this section - there is none within the vicinity. After hours requirements please add this section but we will have to put TBA at this stage Mark has also asked is there anything we can do to simplify this…

    • 25 Sep 2026, 12:59 pm · C.R

      @K.RHi Kerri, Noted on most of it. I just have a couple of requests and feedback on some of the items above. * Other City Approved Developments - Got this! * TMR Roads - Got this! * Haulage Route - Got this! * Introduction Letter Draft - I'm not too sure what this is. Can I please ask if we have a template that I can use for this. I checked the Marquee link but I'm not sure which file to use as reference. * Notification Letter Draft (i.e road closure) - Can you confirm if these are the files for reference? * Notification Area, area where these letters will be distributed. - Got this! * After Hours Permit Requirements - Got this! * Is there anything we can do to simplify this TMP? - Not sure how to address this the TMP alone is only 84 pages and that's already our TMP template. It has reached 200+ because of the attachments.

    • 25 Sep 2026, 1:08 pm · K.R

      @C.R Just the resident Notification Letter on this one sorry. The emergency service one is not required at Sunrise. Just needs to be similar does not need to be exact we can leave blank of fillable sections for dates times and type of closure etc. Below is a more simple one from another project if this helps Letter to Residents.pdf Distribution Notification area would look a little like the below The Workzone plan seems to be imbedded but I was not able to locate the separate files for the appendix's - it also mentions throughout the document Works Zones - Can you just change this to "Workzone" so that it is all searchable. Just see how we go with these changes, I will mention to mark about the attachments.

    • 25 Sep 2026, 1:16 pm · C.R

      @K.R Thank you for this, Kerri. I'll take everything into account.

    • 28 Sep 2026, 12:50 pm · Christopher Wright

      This is GTG

  5. Hi @K.R and @Neil Lancaster , This is now for TMD review/Mark's approval. Thank you! Note that the setups here were directly instructed by Mark via Teams meeting. If there are questions, please reach out. Accounts: 5xTGS 1xTMP 1xTIA Report 1xRA 1xWZ Plan 1xRoad & Footpath Occupancy Plan 1xLong-Term Signage Plan Links: TGS - Rev 00 TMP - Rev 00

    • 21 Sep 2026, 10:51 am · Christopher Wright

      This is GTG @Neil Lancaster

    • 21 Sep 2026, 10:53 am · Neil Lancaster

      @Christopher Wright Thanks mate!:)

  6. Hi team, taking over this project now. For tracking, had a quick meeting with Mark Bryers regarding what's needed for this. Please hold off the reviews for now. There will be changes to the TGS suite and an additional 2 more TGS's will be added per Mark's advice. I'll also handle the TMP creation for this too. Also, please anticipate ETA for the said project, I'll keep you all posted. Thanks.

  7. Posted by markluthflores@cromptonconcepts.com.au (markluthflores@cromptonconcepts.com.au) · @Mark Luth Flores via Work Flow RapidPlan screenshot skipped: No plan file for this task

  8. Posted by markluthflores@cromptonconcepts.com.au (markluthflores@cromptonconcepts.com.au) · @Mark Luth Flores via Work Flow RapidPlan screenshot skipped: No plan file for this task

  9. 11 Sep 2026, 10:45 am · Neil Lancaster · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise

    @Mark Luth Flores Hi Mark, Please find all the info I have on this project included in the client folder below. 15 Sunrise Blvd Surfers Paradise Please let me know if you have any more questions. Thanks Neil:)

    • 15 Sep 2026, 4:19 pm · C.R

      Hi @Mark Luth Flores , Can you please advise on your deliverables and progress? I need to know if you've started with the TMP so that I can take over and pick up where you left off. Hoping to hear from you ASAP. Thank you!

  10. For tracking: Putting this on hold as Aaron is taking over. Per discussion with him, this is not a new request for a new project but just a simple request for a concept plan. Due to the lack of information, I've been following the quotation in the Sharepoint folder and have been completing the requirements there. I've uploaded my progress that we can use if the client decides to pursue this project with Crompton. Documents: - TCP File - Folder containing TIA Json Files - Completed Traffic Impact Assessment Report Link: Sharepoint - Documents - Cleo's Progress - All Documents

  11. 20 Aug 2026, 5:28 pm · Permits · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise

    Hi Plans folder: Plans - CC06534 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 15 Sunrise Blvd Surfers Paradise Email Attached: Fw_ Cavella & The Isles - TMPs & CMPs.eml Thank you! 🧡Kim

    • 21 Aug 2026, 8:49 am · C.R

      Hi team, Kerri reached out yesterday regarding this project. I'll start working with what I can as Mark needs the TGS's started today. If there are any additional information at hand, please let me know or update me so that I don't miss it. I'll be working over the weekend too for this. Thanks.

    • 21 Aug 2026, 9:37 am · C.R

      @K.R /@Neil Lancaster /@Permits Hi team, sending here what's needed for planning. Can I please have the following: - Completed Project Information Form - Client’s CMP, if available - Project Description/Background - Relevant Contact Person Details (Site Manager, WHS, etc.) - Traffic Control Company & Contact Person, will it be Crompton too? - Project Schedule/Programme or specific start and end dates of EACH of their works - Site Plan, if available - Location of Jib Laydown - Location of Concrete Pump & Agitators - Mark-Ups, showing the Length of Closure needed for each stage of works - Actual Working Hours (Day & Time) - Client's exact dimension for works zone, as needed under CoGC - RPEQ Swept Path Analysis - RPEQ Haulage Route - RPEQ Design Temporary Signal Design For confirmation: TGS 1 - Site Access only / Footpath Maintained -got this TGS 2 - Daily Arrangement / Footpath & Lane…

    • 21 Aug 2026, 3:24 pm · Neil Lancaster

      Hey @C.R I have spoke to Mark and he is going to talk you through the information that you need for 15 Sunrise Blvd Surfers Paradise as we are pushing to get this pushed through for Monday. If he hasn't been ion touch, please give him a call back. Many thanks Neil

06Every file and folder

123 files in 51 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved