- 16 Oct 2026, 2:19 pmRiri D. on CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise: Invoice sent to client Fw_ Tunnel bore mark up {P.0849471.D.01} Stg 1 288-290 BRISABNE TCE, Goodna - EDEN ESTATE .eml
- 16 Oct 2026, 12:48 pmRiri D. on CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise:
- 25 Sep 2026, 3:35 pmC.R on CC06534-S1 - Rev 1 - BDCM - 15 Sunrise Blvd Surfers Paradise (TMP): Hi @K.R , This is now for TMD review. I've taken everything into account. No changes in the TGS suite, only TMP amendment. TMP changes are recorded in the change log for reference. If there are other changes needed, please let me know. Thank…
- 25 Sep 2026, 9:05 amPermits on CC06534-S1 - Rev 1 - BDCM - 15 Sunrise Blvd Surfers Paradise (TMP): Hi Team! Please save work here: S1 > Rev 1 Plans folder: Plans - CC06534 @K.R will add details below. Thank you - Shaz
- 17 Sep 2026, 2:32 pmC.R on CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise: Hi @K.R and @Neil Lancaster , This is now for TMD review/Mark's approval. Thank you! Note that the setups here were directly instructed by Mark via Teams meeting. If there are questions, please reach out. Accounts: 5xTGS 1xTMP 1xTIA Report 1xRA 1xWZ…
- 16 Sep 2026, 8:58 amC.R on CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise: Hi team, taking over this project now. For tracking, had a quick meeting with Mark Bryers regarding what's needed for this. Please hold off the reviews for now. There will be changes to the TGS suite and an additional 2 more TGS's will be added per Mark's…
Crompton Concepts prepares the traffic management for BDCM on this project at 15 Sunrise Boulevard, Surfers Paradise. 1 Monday request is open; the most pressing is at the TMD approved stage; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 00). On the permit boards: 0 permits in force and 3 in progress. Monday holds 2 requests for this job (1 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans - CC06534
- MondayCC06534-S1 - Rev 1 - BDCM - 15 Sunrise Blvd Surfers Paradise (TMP)
- Client
- BDCM
- Crompton job
- CC06534
- Location
- 15 Sunrise Boulevard, Surfers Paradise
- LGA / authority
- —
- Project coordinator
- K.R
- Latest planner · TMD
- C.R · Christopher Wright
- Monday project status
- New
- Deliverables
- —
- Permits (Monday)
- 0 in force · 3 in progress
- Last activity
- 2 Nov 2026
- Files on SharePoint
- 123 in 51 folders
What needs attention now
- TMD approved, ready to issue: CC06534-S1 - Rev 1 - BDCM - 15 Sunrise Blvd Surfers Paradise (TMP). Required by 27 Sep 2026 (overdue). Planner: C.R · TMD: Christopher Wright · Last note (25 Sep 2026, C.R): “Hi @K.R , This is now for TMD review. I've taken everything into account. No changes in the TGS suite, only TMP amendment. TMP changes are recorded in the change log for…”
- Permit in progress: CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise (CMP / LONO) is Council Pending.
- Permit in progress: CMP (CMP / LONO) is Council Pending.
- Permit in progress: LONO (CMP / LONO) is Council Pending.
PPermits
3 permit lines on the Monday permit boards: 0 in force, 3 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise Team Neil · BCC CMP Lodgement / GCCC LONO Lodgement | CMP / LONO | In progress Council Pending | ||||||
| CMP Team Neil · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name | CMP / LONO | In progress Council Pending | 24 Sep 2026 | |||||
| LONO Team Neil · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name | CMP / LONO | In progress Council Pending | 24 Sep 2026 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06534-CTMP-S1-Rev01 Compressed.pdfCTMP Rev 01 · 8 Oct 2026
- PDFCC06534-CTMP-S1-Rev01.pdfCTMP Rev 01 · 25 Sep 2026
- DOCXHaulage_TTM_Assessment_15_Sunrise_Blvd.docx11 Sep 2026
- PDF15 SUNRISE BLVD.pdf11 Sep 2026
- XLSXCopy of Project Name - CMP information.xlsx11 Sep 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLRe 15 Sunrise Blvd Surfers Paradise CMP Quote13 Oct 2026
- EMLRe_ Cavella & The Isles - TMP's & CMP's7 Oct 2026
- EMLCavella Surfers Paradise25 Sep 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 01 | 8 Oct 2026 | 2 | CC06534-CTMP-S1-Rev01 Compressed.pdfCC06534-CTMP-S1-Rev01.pdf |
| — | TMP | Rev 01 | 25 Sep 2026 | 2 | CC06534-S1-Haulage Route.pdfCC06534-S1-Letter of Notification to Residents.pdfCC06534-S1-Traffic Impact Assessment Detailed Report.pdfCC06534-TMP-S1-Rev01.pdf |
| — | RA | Rev 01 | 25 Sep 2026 | 2 | CC06534-S1-Risk Assessment.pdf |
| S1 | TGS | Rev 00 | 8 Oct 2026 | 1 | CC06534-TGS-S1-Rev00 - 15 Sunrise Blvd, Surfers Paradise Compressed.pdfCC06534-TGS-S1-Rev00 - 15 Sunrise Blvd, Surfers Paradise.pdf |
| S1 | Swept path | Rev 01 | 25 Sep 2026 | 2 | CC06534-S1-Swept Path Analysis.pdf |
| S1 | Workzone plan | Rev 00 | 25 Sep 2026 | 1 | CC06534-S1-Rev00 - Workzone Plan.pdf |
03Requests on Monday
2 requests since 20 Aug 2026: 1 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06534-S1 - Rev 1 - BDCM - 15 Sunrise Blvd Surfers Paradise (TMP) | Amendment | S1 | Rev 01 | TMD approved TMD Approved | 25 Sep 2026 | 27 Sep 2026 | C.R | Christopher Wright |
| CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise | New plans | Invoiced Invoiced | 20 Aug 2026 | 28 Aug 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- C.RPlanner
- Christopher WrightTMD
- K.RProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Oct 2026, 2:19 pm · Riri D. · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
Invoice sent to client Fw_ Tunnel bore mark up {P.0849471.D.01} Stg 1 288-290 BRISABNE TCE, Goodna - EDEN ESTATE .eml
- 16 Oct 2026, 12:48 pm · Riri D. · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
- 25 Sep 2026, 3:35 pm · C.R · CC06534-S1 - Rev 1 - BDCM - 15 Sunrise Blvd Surfers Paradise (TMP)
Hi @K.R , This is now for TMD review. I've taken everything into account. No changes in the TGS suite, only TMP amendment. TMP changes are recorded in the change log for reference. If there are other changes needed, please let me know. Thank you. Accounts: 1xTMP Amendment (S1-Rev1) 1xAdd'l Detailed Haulage Route Document 1xAdd'l Notification Letter to Residents with Area of Notification Total TMP Amendment Time: 3.0 Hours Link: Rev 01
- 25 Sep 2026, 9:05 am · Permits · CC06534-S1 - Rev 1 - BDCM - 15 Sunrise Blvd Surfers Paradise (TMP)
Hi Team! Please save work here: S1 > Rev 1 Plans folder: Plans - CC06534 @K.R will add details below. Thank you - Shaz
- 25 Sep 2026, 12:30 pm · K.R
@C.R Can we update a few items in the TMP for this one. Can you please add sections for the below * Other City Approved Developments * TMR Roads * Haulage Route * Introduction Letter Draft * Notification Letter Draft (i.e road closure) * Notification Area, area where these letters will be distributed. * After Hours Permit Requirements Plans CC06326 - This is the plans link for Marquee Developments Palm Beach. There are some letters in this one that you could adapt for this project using the BDCM Logo. From what I can see on near maps there does not seem to be any near by approved developments, can you add this section and just state that there is none near by. TMR Roads - Same with this section - there is none within the vicinity. After hours requirements please add this section but we will have to put TBA at this stage Mark has also asked is there anything we can do to simplify this…
- 25 Sep 2026, 12:59 pm · C.R
@K.RHi Kerri, Noted on most of it. I just have a couple of requests and feedback on some of the items above. * Other City Approved Developments - Got this! * TMR Roads - Got this! * Haulage Route - Got this! * Introduction Letter Draft - I'm not too sure what this is. Can I please ask if we have a template that I can use for this. I checked the Marquee link but I'm not sure which file to use as reference. * Notification Letter Draft (i.e road closure) - Can you confirm if these are the files for reference? * Notification Area, area where these letters will be distributed. - Got this! * After Hours Permit Requirements - Got this! * Is there anything we can do to simplify this TMP? - Not sure how to address this the TMP alone is only 84 pages and that's already our TMP template. It has reached 200+ because of the attachments.
- 25 Sep 2026, 1:08 pm · K.R
@C.R Just the resident Notification Letter on this one sorry. The emergency service one is not required at Sunrise. Just needs to be similar does not need to be exact we can leave blank of fillable sections for dates times and type of closure etc. Below is a more simple one from another project if this helps Letter to Residents.pdf Distribution Notification area would look a little like the below The Workzone plan seems to be imbedded but I was not able to locate the separate files for the appendix's - it also mentions throughout the document Works Zones - Can you just change this to "Workzone" so that it is all searchable. Just see how we go with these changes, I will mention to mark about the attachments.
- 25 Sep 2026, 1:16 pm · C.R
@K.R Thank you for this, Kerri. I'll take everything into account.
- 28 Sep 2026, 12:50 pm · Christopher Wright
This is GTG
- 25 Sep 2026, 12:30 pm · K.R
- 17 Sep 2026, 2:32 pm · C.R · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
Hi @K.R and @Neil Lancaster , This is now for TMD review/Mark's approval. Thank you! Note that the setups here were directly instructed by Mark via Teams meeting. If there are questions, please reach out. Accounts: 5xTGS 1xTMP 1xTIA Report 1xRA 1xWZ Plan 1xRoad & Footpath Occupancy Plan 1xLong-Term Signage Plan Links: TGS - Rev 00 TMP - Rev 00
- 21 Sep 2026, 10:51 am · Christopher Wright
This is GTG @Neil Lancaster
- 21 Sep 2026, 10:53 am · Neil Lancaster
@Christopher Wright Thanks mate!:)
- 21 Sep 2026, 10:51 am · Christopher Wright
- 16 Sep 2026, 8:58 am · C.R · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
Hi team, taking over this project now. For tracking, had a quick meeting with Mark Bryers regarding what's needed for this. Please hold off the reviews for now. There will be changes to the TGS suite and an additional 2 more TGS's will be added per Mark's advice. I'll also handle the TMP creation for this too. Also, please anticipate ETA for the said project, I'll keep you all posted. Thanks.
- 12 Sep 2026, 7:44 pm · S.B · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
Posted by markluthflores@cromptonconcepts.com.au (markluthflores@cromptonconcepts.com.au) · @Mark Luth Flores via Work Flow RapidPlan screenshot skipped: No plan file for this task
- 12 Sep 2026, 7:43 pm · S.B · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
Posted by markluthflores@cromptonconcepts.com.au (markluthflores@cromptonconcepts.com.au) · @Mark Luth Flores via Work Flow RapidPlan screenshot skipped: No plan file for this task
- 11 Sep 2026, 10:45 am · Neil Lancaster · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
@Mark Luth Flores Hi Mark, Please find all the info I have on this project included in the client folder below. 15 Sunrise Blvd Surfers Paradise Please let me know if you have any more questions. Thanks Neil:)
- 15 Sep 2026, 4:19 pm · C.R
Hi @Mark Luth Flores , Can you please advise on your deliverables and progress? I need to know if you've started with the TMP so that I can take over and pick up where you left off. Hoping to hear from you ASAP. Thank you!
- 15 Sep 2026, 4:19 pm · C.R
- 22 Aug 2026, 1:23 pm · C.R · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
For tracking: Putting this on hold as Aaron is taking over. Per discussion with him, this is not a new request for a new project but just a simple request for a concept plan. Due to the lack of information, I've been following the quotation in the Sharepoint folder and have been completing the requirements there. I've uploaded my progress that we can use if the client decides to pursue this project with Crompton. Documents: - TCP File - Folder containing TIA Json Files - Completed Traffic Impact Assessment Report Link: Sharepoint - Documents - Cleo's Progress - All Documents
- 20 Aug 2026, 5:28 pm · Permits · CC06534 - BDCM - 15 Sunrise Blvd Surfers Paradise
Hi Plans folder: Plans - CC06534 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 15 Sunrise Blvd Surfers Paradise Email Attached: Fw_ Cavella & The Isles - TMPs & CMPs.eml Thank you! 🧡Kim
- 21 Aug 2026, 8:49 am · C.R
Hi team, Kerri reached out yesterday regarding this project. I'll start working with what I can as Mark needs the TGS's started today. If there are any additional information at hand, please let me know or update me so that I don't miss it. I'll be working over the weekend too for this. Thanks.
- 21 Aug 2026, 9:37 am · C.R
@K.R /@Neil Lancaster /@Permits Hi team, sending here what's needed for planning. Can I please have the following: - Completed Project Information Form - Client’s CMP, if available - Project Description/Background - Relevant Contact Person Details (Site Manager, WHS, etc.) - Traffic Control Company & Contact Person, will it be Crompton too? - Project Schedule/Programme or specific start and end dates of EACH of their works - Site Plan, if available - Location of Jib Laydown - Location of Concrete Pump & Agitators - Mark-Ups, showing the Length of Closure needed for each stage of works - Actual Working Hours (Day & Time) - Client's exact dimension for works zone, as needed under CoGC - RPEQ Swept Path Analysis - RPEQ Haulage Route - RPEQ Design Temporary Signal Design For confirmation: TGS 1 - Site Access only / Footpath Maintained -got this TGS 2 - Daily Arrangement / Footpath & Lane…
- 21 Aug 2026, 3:24 pm · Neil Lancaster
Hey @C.R I have spoke to Mark and he is going to talk you through the information that you need for 15 Sunrise Blvd Surfers Paradise as we are pushing to get this pushed through for Monday. If he hasn't been ion touch, please give him a call back. Many thanks Neil
- 21 Aug 2026, 8:49 am · C.R
06Every file and folder