← All projectsCC06537
Project portal · built 17 Nov 2026, 10:03 am AEST · Recently active

96 Pacific Parade Bilinga

FHS Build

What's new

Monday updates and SharePoint changes, newest first

Full update log
  • 31 Aug 2026, 4:45 pmPermits on CC06537 - FHS Build - 96 Pacific Parade, Bilinga: IV0025083 as per QU-5473 1x tmp basic 1x ra 1x tiqe 1x 5tgs Invoice IV0025083 from Crompton Concepts for 96 Pacific Parade, Bilinga.eml
  • 31 Aug 2026, 3:18 pmEthan Mathews on CC06537 - FHS Build - 96 Pacific Parade, Bilinga: Plans have been sent to client for review @Permits / @Lexi R ACCOUNTS - Please invoice as per below: Please convert accepted quote: QU-5473 to invoice and invoice using the project address as no PO has been provided. Correspondence of acceptance of quote…
  • 26 Aug 2026, 11:49 amC.R on CC06537 - FHS Build - 96 Pacific Parade, Bilinga: Hi @Ethan& @Christopher, This is now for review. Thanks. Accounts: 1xTGS 1xTIA Report 1xRA 1xTMP Links: TGS: Rev 00 TMP: Rev 00
  • 24 Aug 2026, 9:44 amPermits on CC06537 - FHS Build - 96 Pacific Parade, Bilinga: Hi, Please see instructions below: Client: FHS Build Address: 96 Pacific Parade, Bilinga Accepted Quote (Attached) Client Contact: Hamish Schmalkuche Director E: hamish@fhsbuild.com.au | M: 0466 111 539 | W: www.fhsbuild.com.au 6/787 Kingsford Smith Drive,…

Crompton Concepts prepares the traffic management for FHS Build on this project at 96 Pacific Parade, Bilinga. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 00; 1 TGS suite on file (S1 Rev 00). On the permit boards: 0 permits in force and 0 in progress. Every file opens straight from SharePoint.

Client
FHS Build
Crompton job
CC06537
Location
96 Pacific Parade, Bilinga
LGA / authority
—
Project coordinator
Ethan Mathews
Latest planner · TMD
—
Monday project status
New
Deliverables
—
Permits (Monday)
0 in force · 0 in progress
Last activity
2 Nov 2026
Files on SharePoint
79 in 35 folders

What needs attention now

  1. Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.

PPermits

1 permit line on the Monday permit boards: 0 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Full Road (Crane Lift #2)
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificExpired
Done
4 Nov 2026 – 11 Nov 202622 Oct 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

1 request since 24 Aug 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06537 - FHS Build - 96 Pacific Parade, BilingaNew plansInvoiced
Invoiced
24 Aug 202627 Aug 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • Ethan MathewsProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 31 Aug 2026, 4:45 pm · Permits · CC06537 - FHS Build - 96 Pacific Parade, Bilinga

    IV0025083 as per QU-5473 1x tmp basic 1x ra 1x tiqe 1x 5tgs Invoice IV0025083 from Crompton Concepts for 96 Pacific Parade, Bilinga.eml

  2. 31 Aug 2026, 3:18 pm · Ethan Mathews · CC06537 - FHS Build - 96 Pacific Parade, Bilinga

    Plans have been sent to client for review @Permits / @Lexi R ACCOUNTS - Please invoice as per below: Please convert accepted quote: QU-5473 to invoice and invoice using the project address as no PO has been provided. Correspondence of acceptance of quote below: Initial Project Request Correspondence.pdf@Riri D. - FYI

  3. 26 Aug 2026, 11:49 am · C.R · CC06537 - FHS Build - 96 Pacific Parade, Bilinga

    Hi @Ethan& @Christopher, This is now for review. Thanks. Accounts: 1xTGS 1xTIA Report 1xRA 1xTMP Links: TGS: Rev 00 TMP: Rev 00

  4. 24 Aug 2026, 9:44 am · Permits · CC06537 - FHS Build - 96 Pacific Parade, Bilinga

    Hi, Please see instructions below: Client: FHS Build Address: 96 Pacific Parade, Bilinga Accepted Quote (Attached) Client Contact: Hamish Schmalkuche Director E: hamish@fhsbuild.com.au | M: 0466 111 539 | W: www.fhsbuild.com.au 6/787 Kingsford Smith Drive, Eagle Farm QLD 4009 ABN | 72 673 950 966 QBCC | 15446899 Initial Project Correspondence (see email here): 3. Correspondence Initial Project Request Correspondence.pdf Client Notes: Hi Declan, We are looking to get some pricing and indication of timelines for a full road closure permit at 96 Pacific Parade, Bilinga for a mobile crane. We need to crane up some roofing materials and crane down the old sheeting for the Crest Apartments building. We would be looking to lodge and perform the lift ASAP. Can you please provide a quote to submit to council and provide traffic control, signage, etc… for the lift? Let me know what the current lead times are? PC Notes: PLEASE REFER TO PROJECT NEXT DOOR AT 90-92 PACIFIC PARADE (CIELO CONSTRUCTIONS) AND HARMONIZE THEIR LONG TERM SIGNAGE PLAN WITH THESE WORKS: 3. Plans - CC06023 Please save files below: Main Folder Link: 96 Pacific Parade Bilinga TGS: Rev 00 TMP: Rev 00 thanks thanks ~ clint

    • 24 Aug 2026, 10:13 am · Riri D.

      @C.R Plans folder: 5. Plans - CC06537 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 96 Pacific Parade Bilinga Let me know, if you still have issues with the sharepoint access or info is missing so I can liaise it with Ethan and the client for you. Thanks!

    • 24 Aug 2026, 10:27 am · C.R

      @Riri D.Hi Rihana, good day! Can you please confirm if this attachment matches the quote that I found below? Also, can you please also confirm if I need to do all these documents listed in the quotation? We need to clarify this as I was given a quotation last Friday for a request on a new full set of plans (TGS, TMP, TIA, WZ Plan, etc), yet Mark only needed a single concept plan. Wanna make sure we avoid wasting time.

    • 24 Aug 2026, 10:51 am · Riri D.

      @C.R as per Ethan please proceed with the scope list in quote QU5473

    • 24 Aug 2026, 1:58 pm · C.R

      Hi, putting this on hold until I finish my other allocation. I will continue this afterwards.

    • 27 Aug 2026, 8:40 am · Christopher Wright

      This is GTG @Ethan Mathews

06Every file and folder

79 files in 35 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved