Oaklands Pde, East Brisbane
Hopscotch Projects
What's new
- 16 Nov 20262 files saved on SharePoint: CC06555-TGS-S1-Rev02-Hopscotch Projects Pty Ltd - Oaklands Pde, Ea.tcp, CC06555-TGS-S1-Rev02-Hopscotch Projects Pty Ltd - Oaklands Pde, Ea.pdf
- 16 Nov 2026, 4:04 pmRiri D. on CC06555-S1 - Rev 2 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane: Can we please amend TGS plans that represent a concrete barrier to be changed to just a traffic control barrier - Hopscotch - Oaklands Pde. CC06555-S1-1B, CC06555-S1-2B Plans folder: Plans - CC06555 Suite: S1 Save work here: TGS > Rev 02 Project location:…
- 11 Nov 20262 files saved on SharePoint: C - QPS App DecJan27.pdf, QPS App DecJan27.pdf
- 10 Nov 20263 files saved on SharePoint: BCC Cert RC-17739-3 - Display.pdf, BCC Cert RC-17739-3 - Complete.pdf, Permit 2512698.pdf
- 9 Nov 20261 file saved on SharePoint: Remittance Advice from Crompton Concepts Pty Ltd 09Nov2026-5.pdf
- 6 Nov 20262 files saved on SharePoint: Invoice IV0025888.pdf, RC-17337 receipt.pdf
Crompton Concepts prepares the traffic management for Hopscotch Projects on this project at Oaklands Parade, East Brisbane, QLD. 1 Monday request is open; the most pressing is at the TMD review stage; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 02). On the permit boards: 0 permits in force and 2 in progress. Monday holds 3 requests for this job (1 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans - CC06555
- MondayCC06555-S1 - Rev 2 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane
- Client
- Hopscotch Projects
- Crompton job
- CC06555
- Location
- Oaklands Parade, East Brisbane, QLD
- LGA / authority
- City of Brisbane
- Project coordinator
- Aisha Waver
- Latest planner · TMD
- Rudra Khadka · Christopher Wright
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- 0 in force · 2 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 75 in 55 folders
What needs attention now
- Needs TMD review: CC06555-S1 - Rev 2 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane. Required by 18 Nov 2026. TMD: Christopher Wright · Last note (16 Nov 2026, Riri D.): “Can we please amend TGS plans that represent a concrete barrier to be changed to just a traffic control barrier - Hopscotch - Oaklands Pde. CC06555-S1-1B, CC06555-S1-2B Plans…”
- Permit in progress: Road: Daily Arrangement (BCC road) is Council Pending. Follow up 29 Nov 2026. Wanted from 10 Jan 2027.
- Permit in progress: Full Road Closure: Oversize Delivery Removal (BCC road) is To do. Follow up 3 Dec 2026.
PPermits
3 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| Road: Daily Arrangement Team Aisha · BCC Road Permits - Aisha | BCC road | Ongoing | In progress Council Pending | 10 Jan 2027 – 10 Feb 2027 | 6 Nov 2026 | 29 Nov 2026 | 3 Jan 2027 | |
| Full Road Closure: Oversize Delivery Removal Team Aisha · BCC Road Permits - Aisha | BCC road | In progress To do | 3 Dec 2026 | |||||
| Footpath: Daily Arrangement Team Aisha · BCC Footpath Applications - Aisha | Footpath | Ongoing | Approved, starts later Done | 9 Dec 2026 – 14 Feb 2027 | 10 Nov 2026 | 3 Jan 2027 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06555-CTMP-Rev01.pdfCTMP Rev 01 · 7 Oct 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 01 | 7 Oct 2026 | 2 | CC06555-CTMP-Rev01.pdf |
| — | TMP | Rev 01 | 7 Oct 2026 | 2 | Appendix C-TMP_Project_Oaklands_Pde_East_Brisbane-Rev01.pdfCC06555-TMP-Rev01.pdfTMP_Project_Oaklands_Pde_East_Brisbane-Rev01.pdf |
| — | RA | Rev 00 | 30 Sep 2026 | 1 | Risk Assessment - Oversize Delivery & Removal (Contingency).pdfRisk Assessment - Trucks Drive-in & Drive-out.pdf |
| — | TIA | Rev 00 | 29 Sep 2026 | 1 | TIA-79 OAKLANDS PARADE, EAST BRISBANE QLD 4169, AUSTRALIA.pdf |
| S1 | TGS | Rev 02 | 16 Nov 2026 | 3 | CC06555-TGS-S1-Rev02-Hopscotch Projects Pty Ltd - Oaklands Pde, Ea.pdf |
| S1 | Workzone plan | Rev 00 | 30 Sep 2026 | 1 | CC06555-Work Zone Plan.pdf |
03Requests on Monday
3 requests since 24 Sep 2026: 1 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06555-S1 - Rev 2 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane | Amendment | S1 | Rev 02 | TMD review TMD Review | 16 Nov 2026 | 18 Nov 2026 | Rudra Khadka | Christopher Wright |
| CC06555-S1 - Rev 1 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane | Amendment | S1 | Rev 01 | Closed No Charge | 6 Oct 2026 | 8 Oct 2026 | ||
| CC06555 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane | New plans | Invoiced Invoiced | 24 Sep 2026 | 2 Jan 1970 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- Name Colin Heironymus0421166451
Crompton Concepts
- Rudra KhadkaPlanner
- Christopher WrightTMD
- Aisha WaverProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 4:04 pm · Riri D. · CC06555-S1 - Rev 2 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane
Can we please amend TGS plans that represent a concrete barrier to be changed to just a traffic control barrier - Hopscotch - Oaklands Pde. CC06555-S1-1B, CC06555-S1-2B Plans folder: Plans - CC06555 Suite: S1 Save work here: TGS > Rev 02 Project location: Oaklands Pde, East Brisbane Quote: none Job request form: none Request type: Amendment Scope: TGS
- 16 Nov 2026, 5:18 pm · Rudra Khadka
Hi @Aisha Waver @Christopher Wright Task is updated as per request and uploaded to its respective folder. Thank You! Accounts, 2 TGS amendment ( CC06555-S1-1B, CC06555-S1-2B concrete barrier changed to a Traffic control barrier) Thank You!
- 16 Nov 2026, 5:18 pm · Rudra Khadka
- 7 Oct 2026, 2:11 pm · Riri D. · CC06555-S1 - Rev 1 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane
- 7 Oct 2026, 2:01 pm · Riri D. · CC06555 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane
Invoice IV0025504 sent to client - Re_ Oaklands Pde, East Brisbane - estimate - traffic management..eml
- 6 Oct 2026, 3:14 pm · Permits · CC06555-S1 - Rev 1 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane
Hi @B.R Please save work here: TGS > Rev 01 Suite: S1 Plans folder: Plans - CC06555 Instructions: Can we please remove TC for pedestrian crossing, and put delineation either side of the ramps. Use Mark's TMD number OP - 449 Thanks - Shaz
- 7 Oct 2026, 11:33 am · B.R
Hi @Aisha Waver, This is uploaded and for TMD review. Thank you! Folder Link: Plans - CC06555 Files: TGS - CC06555-TGS-S1-Rev01-Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane.pdf TMP - CC06555-CTMP-Rev01.pdf Accounts: 3xTGS Amendment 1xCTMP Amendment
- 7 Oct 2026, 12:30 pm · Christopher Wright
This is GTG @Aisha Waver
- 7 Oct 2026, 11:33 am · B.R
- 24 Sep 2026, 3:53 pm · Sandy · CC06555 - Hopscotch Projects Pty Ltd - Oaklands Pde, East Brisbane
Plans folder: Plans - CC06555 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: Oaklands Pde, East Brisbane Quote: QU-5597 Request type: New plans Scope: TGS & TMP Client mark-ups/attachments: Planning Quote QU5597.pdf RE_ Oaklands Pde, East Brisbane - estimate - traffic management..eml
- 24 Sep 2026, 4:05 pm · Riri D.
Hi @R.R, as discussed on teams. I will allocate this new project for our new PC @Aisha. Please see the email thread on the saved Rev 00 TGS folder along with the planning quote to start. Mark will also do mark ups today. Mark and Aisha will be on the road tomorrow for this project. So further details will be provided.
- 25 Sep 2026, 11:12 am · Riri D.
@R.R I have markups saved in the folder let me know if that helps :)
- 30 Sep 2026, 11:26 pm · R.R
Hi @Christopher Wright @Aisha Waver , Files uploaded for review. Thank you Link: TGS Sharepoint - Documents - Rev 00 - All Documents TMP Sharepoint - Documents - Rev 00 - All DocumentsAccounts: 3x TGS, TMP, RA, Workzone Plan
- 2 Oct 2026, 10:13 am · Christopher Wright
This is GTG
- 24 Sep 2026, 4:05 pm · Riri D.
06Every file and folder
75 files in 55 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|