← All projectsCC06558
Project portal · built 17 Nov 2026, 10:03 am AEST · With client

Hahndorf Roundabout

Prime Traffic Solutions Pty Ltd

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Prime Traffic Solutions Pty Ltd on this project at Hahndorf Roundabout, Mount Barker Road, SA. 1 Monday request is open; the most pressing is at the with client stage; 2 TGS suites on file (General no rev, S1 Rev 02). Every file opens straight from SharePoint.

Client
Prime Traffic Solutions Pty Ltd
Crompton job
CC06558
Location
Hahndorf Roundabout, Mount Barker Road, SA
LGA / authority
Mount Barker District Council
Project coordinator
Neil Lancaster
Latest planner · TMD
KB.R · Christopher Wright
Monday project status
New
Deliverables
TGS
Permits (Monday)
None on the permit boards
Last activity
26 Oct 2026
Files on SharePoint
16 in 10 folders

What needs attention now

  1. Issued, waiting on client: CC06558 - Prime Traffic Solutions - Hahndorf Roundabout. Required by 1 Oct 2026. Planner: KB.R · TMD: Christopher Wright · Last note (16 Oct 2026, Riri D.): “”

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
GeneralTGSno rev8 Oct 20260CC06558 TGS - Prime Traffic Solutions - Hahndorf Roundabout.pdf
S1TGSRev 0223 Oct 20261CC06558-TGS-S1-Rev02-Hahndorf Roundabout.pdf

03Requests on Monday

1 request since 29 Sep 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06558 - Prime Traffic Solutions - Hahndorf RoundaboutNew plansWith client
Client Review
29 Sep 20261 Oct 2026KB.RChristopher Wright

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • NeilProject coordinator (folder flag)
  • KB.RPlanner
  • Christopher WrightTMD
  • Neil LancasterProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi @Neil Lancaster @Christopher Wright, I did a redesign for the TGS here for Prime Traffic Solutions. Setup was as discussed with Chris. PTCD locations are setup to consider all three stage of site active. This is also assuming that night works is implemented, as per Chris' instructions. I've also changed parts of the template that I've automated. I've also added in risk assessments and options analysis using our app. Accounts: 4xTGS 1xVMS Plan Link: It is now available for review. Let me know if there's anything I have missed. Thank you.

  2. 3 Oct 2026, 12:03 am · Michelle Sayson · CC06558 - Prime Traffic Solutions - Hahndorf Roundabout

    TGS Draft completed uploaded at TGS Information such as the Client name of Prime Traffic, Works date and hours are TBA when available.

    • 7 Oct 2026, 1:55 pm · Christopher Wright

      Hi, @Michelle Sayson Can you please see the rapid file for this one and amend accordingly, just use the QLD standards. there are quite a few amendments including requiring a queue length. I need these changes done asap please.

    • 7 Oct 2026, 4:05 pm · Neil Lancaster

      @Michelle Sayson Can you please let me know when this is GTG:) @Christopher Wright

    • 8 Oct 2026, 5:38 am · Michelle Sayson

      Amendments applied @Neil Lancaster Project folder - TGS

  3. Hi, Save Work Here: Plans - CC06558 > TGS Folder Name: Hahndorf Roundabout Instructions: There will be three active TGS's, one aftercare TGS and one VMS TGS. The TGS's have been marked up in the reapid file. This location is in South Australia Also, Multi Message frames are to be used Thanks, Iris (290926)

    • 30 Sep 2026, 3:06 pm · Riri D.

      @Michelle Sayson as discussed on teams it will be a SA TGS. Teams me or @Neil Lancaster if you have questions ☺️

    • 8 Oct 2026, 9:09 am · Christopher Wright

      @KB.R Please teams me if you need

    • 8 Oct 2026, 11:51 am · Neil Lancaster

      Hey @KB.R, how is this going please?

    • 8 Oct 2026, 11:54 am · Neil Lancaster

      @KB.R Also, here is the info you need for the details block on the bottom of the TGS's, this is private label from Prime to their client. Many thanks:) RE Request for Info.eml

    • 8 Oct 2026, 1:50 pm · KB.R

      Hi @Neil Lancaster, this is a general redesign of the TGS, and requires addition of risk assessment and options analysis so it would take quite a bit of time to complete. I've mentioned to Chris that I'll have this sent back for review tomorrow morning. I do want to ask, as per @Christopher Wright, I'm using our template for the TGS, but from the email thread you have sent, we are using the template of Prime Traffic Solutions and then have BMD LEED as the client? Which should I follow? Thanks.

06Every file and folder

16 files in 10 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved