2389-2391 GCHW Mermaid
CS Collective
What's new
- 16 Nov 202619 files saved on SharePoint: TIA Raw Project.json, CC06582-TIA Edits.json, Addressed Sanju's Comments 16-11-2026.pdf, CC06582-Rev01-Risk Assessment.pdf and 15 more
- 16 Nov 2026, 11:04 amS.B on CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid: Hi Cleo, Thanks for the detailed response sheet, that made this much quicker to check. Good progress: the 1F/5F hold notes now give an actual window (19:00–06:00, max 135 m queue), 6E confines the lane closure to 00:00–05:00 outside tram hours (which sits…
- 13 Nov 20262 files saved on SharePoint: Addressed Sanju's Comments 13-11-2026.pdf, RA Project.json
- 12 Nov 20261 file saved on SharePoint: Email re Turntable.eml
- 12 Nov 2026, 8:05 amS.B on CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid: Hi Cleo, Thanks for pulling this together – it's a big package and the split of the Works Zone, Road & Footpath Occupancy and Long-Term Signage plans into their own appendices works really well. The TMP now explains the demolition sequence, the pergola…
- 11 Nov 2026, 12:13 pmAisha Waver on CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid: Hi @C.R please see amendments
Crompton Concepts prepares the traffic management for CS Collective on this project at 2391 Gold Coast Highway, Mermaid Beach, QLD. 1 Monday request is open; the most pressing is at the TMD review stage; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 01). Monday holds 2 requests for this job (1 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans - CC06582
- MondayCC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid
- Client
- CS Collective
- Crompton job
- CC06582
- Location
- 2391 Gold Coast Highway, Mermaid Beach, QLD
- LGA / authority
- City of Gold Coast
- Project coordinator
- Aisha Waver
- Latest planner · TMD
- C.R · S.B
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- None on the permit boards
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 67 in 16 folders
What needs attention now
- Needs TMD review: CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid. Required by 4 Nov 2026 (overdue). TMD: S.B · Last note (16 Nov 2026, S.B): “Hi Cleo, Thanks for the detailed response sheet, that made this much quicker to check. Good progress: the 1F/5F hold notes now give an actual window (19:00–06:00, max 135 m…”
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06582-CTMP-Rev01.pdfCTMP Rev 01 · 16 Nov 2026
- PDFHTTR7_to_HTTR10_-_300_Turntable_Specification.pdf3 Nov 2026
- PDFJob Request_Watermarked.pdf23 Oct 2026
- PDFMermaid_Site_Plan_Marked_Up (1).pdf23 Oct 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLEmail re Turntable12 Nov 2026
- EMLTMR Approval - 2389_2391 GC Hwy, Mermaid Beach29 Oct 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 01 | 16 Nov 2026 | 2 | CC06582-CTMP-Rev01.pdf |
| — | TMP | Rev 01 | 16 Nov 2026 | 2 | Addressed Sanju's Comments 13-11-2026.pdfAddressed Sanju's Comments 16-11-2026.pdfAppendix J - 300 Turntable Specification.pdfCC06582- Letter of Notification to Residents.pdfCC06582-S1-Long-Term Signage Plan.pdfCC06582-S1-Rev01-Traffic Impact Assessment.pdf+3 more |
| — | RA | Rev 01 | 16 Nov 2026 | 2 | CC06582-Rev01-Risk Assessment.pdf |
| General | Swept path | Rev 00 | 16 Nov 2026 | 1 | CC06582-Rev00-AV Access Swept Path Analysis.pdfCC06582-Rev00-Swept Path Analysis.pdf |
| S1 | TGS | Rev 01 | 4 Nov 2026 | 2 | Mermaid_Site_Plan_Marked_Up (1).pdf |
03Requests on Monday
2 requests since 23 Oct 2026: 1 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid | Amendment | S1 | Rev 01 | TMD review TMD Review | 2 Nov 2026 | 4 Nov 2026 | C.R | S.B |
| CC06582 - CS Collective - 2389-2391 GCHW Mermaid | New plans | Invoiced Invoiced | 23 Oct 2026 | 29 Oct 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- C.RPlanner
- S.BTMD
- Aisha WaverProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 11:04 am · S.B · CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid
Hi Cleo, Thanks for the detailed response sheet, that made this much quicker to check. Good progress: the 1F/5F hold notes now give an actual window (19:00–06:00, max 135 m queue), 6E confines the lane closure to 00:00–05:00 outside tram hours (which sits well inside the low-V/C hours in the TIA), the turntable note is off 1F, the 3D/4D/5F Section A-A elevation clears up the path width question, the 4D 40 km/h after-hours reasoning is now on the sheet, and the letter now has the right address and the 01/02/2027 demolition start. TMP Table 14 capacity (1,434 vph) and the 0.43 min delay now match the TIA too. A few things still need sorting before this can go out, most important first: 1. Hours: day vs night works don't agree across the package (critical) * The TGS now shows "Working hours: 18:30 – 06:30 (Monday – Saturday)" on all of stages 1, 5 and 6 (demolition, concrete pours, tower crane), and 06:30–18:30 on 0B and stages 2–4. But the TMP still says "Operational Times: Monday – Saturday, 6:30 AM to 6:30 PM" (Table 12) and 6.2.1 says "Monday to Friday, 6:30 AM to 6:30 PM, and Saturday as required", with no night works stated anywhere. The letter says both day works 06:30–18:30 and night works 18:30–06:30. * Can you confirm with Aisha/the client what's actually proposed? If demolition and concrete pours are genuinely going to run overnight next to the motel and residences, we need the client's confirmation, the TMP hours, noise/community measures and the permit conditions…
- 16 Nov 2026, 4:02 pm · C.R
Hi @S.B and @Aisha, did I accidentally tag this as TMD Approved or was it Sanju who approved this allocation? I'm still finalizing his latest comments and haven't submitted back the latest plans based on what's been recently discussed.
- 16 Nov 2026, 4:27 pm · Aisha Waver
@C.Rive moved it back to internal amendments, please advise once its for TMD Review
- 16 Nov 2026, 5:36 pm · C.R
Hi @S.B and @Aisha, all comments here on Monday and on Teams have been addressed. I've gone through each item and made the necessary changes. I've compiled all comments and addressed them to properly document the changes. A minor thing that we're still waiting for is the client's contact info. We don't have this yet and are still waiting for the client's response. You may refer to this document for my response to each item. Addressed Sanjus Comments 16-11-2026.pdf This is now for final review (hopefully 😅). Thank you! Links: TGS > Rev 01 TMP > Rev 01Appendices > _Appendices
- 16 Nov 2026, 4:02 pm · C.R
- 12 Nov 2026, 8:05 am · S.B · CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid
Hi Cleo, Thanks for pulling this together – it's a big package and the split of the Works Zone, Road & Footpath Occupancy and Long-Term Signage plans into their own appendices works really well. The TMP now explains the demolition sequence, the pergola removal and the MR-only turntable restriction clearly, and the revision history/change log are filled in properly. A few things to sort before this goes out, most important first: 1. Hours of work vs the TIA (critical) * The TIA (Appendix D) says the arrangement is "not feasible without mitigation": southbound lane-closed V/C is above 1.0 at 07:00–09:00 and 15:00–18:00 (1.61 LOS F at 17:00–18:00), and full-hold queues reach 208–228 m in the peaks. But every TGS says "Working hours: 06:00 – 18:00 (Monday – Saturday)" with no peak restriction, and 1F/5F only show a 135 m queue. * Please add explicit time restrictions on the sheets themselves: no hold & release (1F, 5F) during the AM/PM peaks, and a defined lane-closure window for 6E (from TIA Appendix A.iv, roughly 10:00–14:00 or after 19:00 is where V/C stays at or below 0.80). Then make the 135 m queue / sign positions match the hours you allow. * 1F, 5F and 6E all have "NIGHT WORKS" notes ("off-peak hours and during night works"), and the TMP says tower crane works happen "outside tram operating hours", but no night hours are stated anywhere. Please state the actual night-works hours, or remove the note if night works aren't proposed. * Hours don't match across documents: TGS…
- 13 Nov 2026, 2:32 pm · C.R
Hi Aisha and Sanju, (@Aisha@S.B ) This is now for review. In response to Sanju's comments, I'll add here the pdf file containing response to all revision requests listed above. Addressed Sanjus Comments 13-11-2026.pdf I've updated everything and it has been reuploaded. Thank you! Links: TGS > Rev 01 TMP > Rev 01Appendices > _Appendices
- 16 Nov 2026, 10:32 am · Aisha Waver
@S.B can we please get this reviewed asap
- 13 Nov 2026, 2:32 pm · C.R
- 11 Nov 2026, 12:13 pm · Aisha Waver · CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid
Hi @C.R please see amendments
- 11 Nov 2026, 5:46 pm · C.R
Hi @Aisha Waver , I've amended the plans following these comments. Please let me know if there is anything else specifically needed for 7.1 and 7.2. I did add the works zone plan as an appendix, together with the road occupancy map and the long-term signage plan. As for the Notification Letter, I already have this prepared and it's included in the CTMP. All documents attached as an appendix were saved in a folder named '_Appendices'. I'll just add the link here as well. Thank you! Links: TGS > Rev 01 TMP > Rev 01Appendices > _Appendices
- 11 Nov 2026, 5:46 pm · C.R
- 10 Nov 2026, 4:42 pm · Rosan Apolinaria · CC06582 - CS Collective - 2389-2391 GCHW Mermaid
IV0025933 - drafted
- 11 Nov 2026, 5:21 pm · Riri D.
Please amend and use quote QU5699
- 12 Nov 2026, 12:34 pm · Rosan Apolinaria
@Riri D. Deleted the invoice IV0025933, new invoice generated from quote- IV0025962
- 16 Nov 2026, 4:32 pm · Riri D.
Invoice IV0025962 sent to client Re_ TMR Approval - 2389_2391 GC Hwy, Mermaid Beach_Onboarding with Crompton Concepts_23.10.2026.eml
- 11 Nov 2026, 5:21 pm · Riri D.
- 3 Nov 2026, 5:13 pm · C.R · CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid
Hi @Aisha, I have covered all of the changes needed. The only missing attachment is the Swept Path Assessment Report and Documentation that Andy asked for. Aside from that, everything else have been updated. This is now for review. Thank you. Accounts: 6xTGS Amendment (Site Layout update) 1xTMP Amendment 1xAdditional Letter to Residents 1xTIA Amendment Links: TGS > Rev 01 TMP > Rev 01
- 4 Nov 2026, 12:45 pm · C.R
Hi @S.B and @Aisha Waver , This is now for review. I've included everything that we have discussed on teams. Both TGS and TMP documents were amended and reuploaded to Sharepoint. Please note that the raw TMP is only 89 pages long. The CTMP reached up to 200 pages due to the attachments in the appendices. If there are other changes needed, please let me know. Thank you! Accounts: As above. Links: TGS > Rev 01 TMP > Rev 01
- 4 Nov 2026, 12:45 pm · C.R
- 2 Nov 2026, 4:34 pm · Riri D. · CC06582-S1 - Rev 1 - CS Collective - 2389-2391 GCHW Mermaid
As discussed on teams, please amend the below: this is the amended site plan for the tower crane. Also on TGS below. This is the demolition phase, so the tower crane/site won't be there. and the trucks and turntable wont be there. Can we please show the demo happening from the empty block next to the building currently sitting on the block? Plans - CC06582 Save here: S1 > Rev 01
- 30 Oct 2026, 1:44 pm · C.R · CC06582 - CS Collective - 2389-2391 GCHW Mermaid
Hi @Aisha Waver and @Christopher, This is now for review. Please note that the signage setup considers all stages of work and assures that it covers each operation on site. Long-term signage plan is at the last page of the TGS for better understanding. Thanks! Accounts: 6xTGS (CC06582-S1-1F to 6E) 1xRisk Assessment Report 1xTraffic Impact Assessment Report 1xWorkzone Plan 1xRoad and Footpath Occupancy Plan 1xLong-Term Signage Plan 1xFull TMP (CC06582-S1-Rev00) Links: TGS > Rev 00 TMP > Rev 00
- 30 Oct 2026, 1:56 pm · Christopher Wright
This appears to be GTG @Aisha Waver
- 30 Oct 2026, 1:56 pm · Christopher Wright
- 23 Oct 2026, 3:35 pm · Riri D. · CC06582 - CS Collective - 2389-2391 GCHW Mermaid
Plans folder: Plans - CC06582 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 2389-2391 GCHW Mermaid Quote: QU5699 Request type: New Scope: TGS & TMP Client mark-ups/attachments: see attached quote andn job request form for reference. Thank you! Mermaid_Site_Plan_Marked_Up (1).pdf Job Request_Watermarked.pdf Quote QU5699.pdf TMR Approval - 2389_2391 GC Hwy, Mermaid Beach.eml
- 26 Oct 2026, 2:29 pm · Riri D.
@C.R TMP reference Alfreds_Lane_TMP_Updated_Contacts.docx
- 27 Oct 2026, 1:14 pm · C.R
Hi @Riri D. and @Aisha Waver, Can you please confirm if this is for Hutchinson Builders or if this is for CS Collective? I've gone through all the documents and there is no mention of Hutchies in any of it. Also, can you give me the contact details of their project manager or any contact info that is a direct representative of the client? For your response. Thank you!
- 27 Oct 2026, 1:26 pm · Aisha Waver
CS collective is the Developer who we have pretty much been dealing with directly. But I have double checked. I am not sure where we got Hutchies. Scott is from Smico
- 27 Oct 2026, 1:27 pm · Aisha Waver
Luke is the contact we have been talking to directly - Luke luke@cscollective.com.au - 0410805231
- 27 Oct 2026, 2:31 pm · C.R
Noted on this! Thanks, @Aisha.
- 27 Oct 2026, 3:40 pm · Aisha Waver
@C.R please see the attached email - Re_ TMR Approval - 2389_2391 GC Hwy, Mermaid Beach.eml Things might need to change as they are planning to implement a turn table at the back of the property to help things and keep rtaffic going entry and exit nose in nose out
- 26 Oct 2026, 2:29 pm · Riri D.
- 23 Oct 2026, 3:34 pm · Sandy · CC06582 - CS Collective - 2389-2391 GCHW Mermaid
Hi Plans folder: Plans - CC06582 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 2389-2391 GCHW Mermaid Quote: QU5699 / QU5737 Request type: New plans Scope: TGS & TMP Client mark-ups/attachments: