← All projectsCC06583
Project portal · built 17 Nov 2026, 10:03 am AEST · Review amendments

Bruce Highway Tulley

HEH Civil

Crompton Concepts prepares the traffic management for HEH Civil on this project at Bruce Highway, Tulley, QLD. 1 Monday request is open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 00; 2 TGS suites on file (S1 Rev 00, S2 Rev 00). Monday holds 2 requests for this job (1 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
HEH Civil
Crompton job
CC06583
Location
Bruce Highway, Tulley, QLD
LGA / authority
—
Project coordinator
Neil
Latest planner · TMD
—
Monday project status
New
Deliverables
—
Permits (Monday)
None on the permit boards
Last activity
16 Nov 2026
Files on SharePoint
314 in 33 folders

What needs attention now

  1. Review comments to action: CC06583 - HEH Civil - Bruce Highway Tulley. Required by 29 Oct 2026 (overdue). Planner: R.R, Y.B, KB.R · TMD: A.A · Last note (26 Oct 2026, D.B): “Hi @Y.B can you please be planner for the intersection -17.918222, 145.945314 & @R.R can you please be the planner for the highway -18.160990, 145.931860”

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

    Nothing filed for this yet.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

2 requests since 26 Oct 2026: 1 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06583 - HEH Civil - Bruce Highway Tulley (TMP only)AmendmentInvoiced
Invoiced
27 Oct 202629 Oct 2026
CC06583 - HEH Civil - Bruce Highway TulleyNew plansReview amendments
Working on it
26 Oct 202629 Oct 2026R.R, Y.B, KB.RA.A

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • NeilProject coordinator (folder flag)
  • R.RPlanner
  • Y.BPlanner
  • KB.RPlanner
  • A.ATMD

05Update log

Monday updates and replies on this project's requests, newest first.

  1. IV0025983 sent to client - Shaz 161126 Re_ Updated RFQ - Bruce Highway Tulley.eml

  2. Hi @A.A @D.B @Christopher Wright, I have tentatively completed the OA, RA, TMP and three Departure Request Forms based on our discussions and identified TTM requirements. As advised, unavailable information has been marked as TBA. The following items remain pending: * Clause 9 Shuttle Flow: Confirm the Departure Approval Request requirements under Annexure MRTS02.1 Clause 9, including the need to demonstrate that no suitable alternatives are available. The current restriction is weekdays, 9:00 am–3:00 pm, maximum 4 hours per day. * Speed Management Systems: Obtain RPM's technical data for the radar speed signs, ANPR cameras and 9 Smart VMS boards with cameras (3 at intersection approaches and 6 at work-area approaches). * ANPR Data and Privacy: Confirm how number plate data will be captured, stored and displayed, including privacy requirements. Discussions with RPM are ongoing. * VMS Message Wording: Confirm the proposed wording and obtain TMR approval. Matt referred to a QUT/Griffith study favouring short reminder messages over scare tactics. * Flashing Road Studs: The arrangement is included in the TMP. TMR innovation approval, acceptance of the stud type and colour, and the RPEQ risk assessment remain outstanding. The remaining task on my end is to incorporate the TTM setup figures into the TMP for each TGS once Reina and Ykath provide the finalised drawings tomorrow. I will update the TMP accordingly and notify everyone once completed. The tentative TMP, OA, RA, three…

    • 9 Nov 2026, 12:22 pm · KB.R

      Hi @A.A, as discussed, I've uploaded the CTMP complete with the figures for each TTM setup, and other relevant files for this allocation. It is now available for review. Thanks!

  3. 27 Oct 2026, 12:32 pm · Riri D. · CC06583 - HEH Civil - Bruce Highway Tulley (TMP only)

    Plans folder: 2. Plans - CC06583 Suite: 3. TMP Save work here: TMP > 3. TMP Project location: Bruce Highway Tulley Quote: none Request type: New TMP @D.B will share the rest of the details

    • 27 Oct 2026, 2:38 pm · KB.R

      Hi @D.B, waiting for you regarding our confirmations for HEH Civil. Let me know if you are available for a call.

    • 4 Nov 2026, 11:54 am · KB.R

      Hi @D.B @Christopher Wright @A.A, I've tentatively completed the TMP, RA, and OA with all the of the details available to me. Discussions still follow what @A.A has advised for the TTM setups for each. This is still not following the client's comments @D.B has sent over. I also have placeholders for each figure in the discussions as the S1 and S2 TGS is still not complete as of posting this message. Will update everything once finalised. Pending meeting with @A.A and @Christopher Wright to discuss the amendments proposed by the client.

  4. 26 Oct 2026, 1:34 pm · D.B · CC06583 - HEH Civil - Bruce Highway Tulley

    Hi @Y.B can you please be planner for the intersection -17.918222, 145.945314 & @R.R can you please be the planner for the highway -18.160990, 145.931860

    • 26 Oct 2026, 1:36 pm · D.B

      any questions please let me know.

    • 26 Oct 2026, 1:37 pm · D.B

      the deadline is Thursday please. If you need help I can assign you a trainee.

    • 26 Oct 2026, 1:43 pm · D.B

      MATTHEW BELLINA Project Engineer P: 07 2102 4247 M: 0491 829 384 E: matthew.bellina@hehcivil.au A: 29A Enterprise Street, Richlands, Queensland, 4077

    • 26 Oct 2026, 4:11 pm · Y.B

      Hi @D.B, just wanted to confirm whether we also need to prepare a full TMP and if it's required by Thursday as well.

    • 26 Oct 2026, 4:13 pm · D.B

      Hi @Y.B TMP will be required, but ill get another planner action this tomorrow.

    • 27 Oct 2026, 12:25 pm · D.B

      Hi @KB.R are you able to work with @Y.B & @R.R to create the Large TMP please.

    • 27 Oct 2026, 12:26 pm · R.R

      Hi @D.B , I';ve already started with location -18.160990, 145.931860. I believe TMP hasn't been started yet

    • 27 Oct 2026, 12:29 pm · KB.R

      Hi @D.B, I can work with them. I'll confirm with them first about their progress.

    • 27 Oct 2026, 2:40 pm · Y.B

      Hi @D.B , waiting for your response on Teams. We have several questions regarding the plan. Thank you!

    • 2 Nov 2026, 8:17 pm · R.R

      Hi @A.A , 4x TGS for SP2 uploaded for your review; remaining plans to follow. Thank you Link: Sharepoint - Documents - 2. S2 - SP 2 Highway - All Documents

  5. 26 Oct 2026, 1:32 pm · D.B · CC06583 - HEH Civil - Bruce Highway Tulley

    Hi Planners, Please see below. 2 Job locations for this project. Bruce Highway Tulley I need 1 planner for Intersection: (Use for the work area: 529463-1000-DRG-Combined(Rev7)) -17.918222, 145.945314 The below rules for the above (MRTS02) (location is in project info) I need 1 planner for highway: (Use for the work area: 30034132-PKG4A-IFC-signed) -18.160990, 145.931860 The below rules for the above (MRTS02) (location is in project info)

06Every file and folder

314 files in 33 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved