← All projectsCC06584
Project portal · built 17 Nov 2026, 10:03 am AEST · TMD approved

35 Mawarra, Surfers Paradise

All About Plumbing

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for All About Plumbing on this project at 35 Mawarra St, Surfers Paradise, QLD. 1 Monday request is open; the most pressing is at the TMD approved stage; the current CTMP on SharePoint is Rev 00; 1 TGS suite on file (S1 Rev 01). Monday holds 2 requests for this job (1 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
All About Plumbing
Crompton job
CC06584
Location
35 Mawarra St, Surfers Paradise, QLD
LGA / authority
—
Project coordinator
Aisha
Latest planner · TMD
Lenny Salugao · Christopher Wright
Monday project status
New
Deliverables
—
Permits (Monday)
None on the permit boards
Last activity
16 Nov 2026
Files on SharePoint
27 in 15 folders

What needs attention now

  1. TMD approved, ready to issue: CC06584-S1 - Rev 1 - All About Plumbing - 35 Mawarra, Surfers Paradise. Required by 13 Nov 2026 (overdue). Planner: Lenny Salugao · TMD: Christopher Wright · Last note (11 Nov 2026, Riri D.): “2021074-OPW SET-sewer cut out NEW REQUEST.pdf Plans folder: 1. Plans - CC06584 Suite: S1 Save work here: TGS > Rev 01 TMP > Rev 01 Project location: 35 Mawarra, Surfers…”

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 0028 Oct 20261CC06584-CTMP-Rev00.pdf
—TMPRev 0028 Oct 20261CC06584-TMP-Rev00.pdf
—RARev 0028 Oct 20261Risk Assessment - 35 Mawarra Street.pdf
S1TGSRev 0116 Nov 202622021074-OPW SET-sewer cut out NEW REQUEST.pdfCC06584-S1-TGS-R1-All About Plumbing - 35 Mawarra, Surfers Paradise.pdf

03Requests on Monday

2 requests since 26 Oct 2026: 1 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06584-S1 - Rev 1 - All About Plumbing - 35 Mawarra, Surfers ParadiseAmendmentS1Rev 01TMD approved
TMD Approved
11 Nov 202613 Nov 2026Lenny SalugaoChristopher Wright
CC06584 - All About Plumbing - 35 Mawarra, Surfers ParadiseNew plansClosed
Not Proceeding
26 Oct 202628 Oct 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • AishaProject coordinator (folder flag)
  • Lenny SalugaoPlanner
  • Christopher WrightTMD

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 2021074-OPW SET-sewer cut out NEW REQUEST.pdf Plans folder: 1. Plans - CC06584 Suite: S1 Save work here: TGS > Rev 01 TMP > Rev 01 Project location: 35 Mawarra, Surfers Paradise Quote: none Job request form: none Request type: Amendment Scope: TGS

    • 11 Nov 2026, 1:01 pm · Lenny Salugao

      Good day, @Riri D. @Christopher Wright done with the amendment. This is ready for TMD review. 1x CC06584-S1-TGS-R1-All About Plumbing - 35 Mawarra, Surfers Paradise (Verge and Footpath closure with detour) Link: Rev 01 Thanks,

    • 16 Nov 2026, 9:31 am · Christopher Wright

      This is GTG

  2. As per Chris, the client will be changing the design, we are waiting on confirmation of the change

  3. Plans folder: 1. Plans - CC06584 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 35 Mawarra, Surfers Paradise Quote: QU5690 Request type: New Scope: 1xTGS & Mini TMP Client mark-ups/attachments: See attached quote and email thread for reference Quote QU5690.pdf Re_ Civil quote for Surfers paradise project.eml

    • 26 Oct 2026, 1:31 pm · R.R

      Hi @Riri D. @Aisha Waver Upon reviewing the email thread, I noted that no markup has been provided. Could we please request the markup so that we can proceed with the plans and TMP?

    • 26 Oct 2026, 1:41 pm · R.R

      Thanks @Riri D. , I'll proceed now

    • 28 Oct 2026, 11:53 am · R.R

      Hi @Aisha Waver @A.A , Files uploaded for review. Thank you. TGS: Sharepoint - Documents - Rev 00 - All Documents TMP/CTMP: Sharepoint - Documents - Rev 00 - All DocumentsAccount: 1x TGS (includes Detour Analysis, OA) TMP (includes RA)

06Every file and folder

27 files in 15 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved