← All projectsCC06592
Project portal · built 17 Nov 2026, 10:03 am AEST · Recently active

Centenary Lakes Park

Disc Landscapes & Construction

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Disc Landscapes & Construction on this project at 2 Morayfield Road, Brisbane, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 00; 1 TGS suite on file (S1 Rev 00). Every file opens straight from SharePoint.

Client
Disc Landscapes & Construction
Crompton job
CC06592
Location
2 Morayfield Road, Brisbane, QLD
LGA / authority
City of Brisbane
Project coordinator
D.B
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS, TMP
Permits (Monday)
None on the permit boards
Last activity
13 Nov 2026
Files on SharePoint
15 in 14 folders

What needs attention now

  1. Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

1 request since 29 Oct 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06592 - Disc Landscapes & Construction - Centenary Lakes ParkNew plansInvoiced
Invoiced
29 Oct 20261 Jan 1970

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • DeclanProject coordinator (folder flag)
  • D.BProject coordinator (Monday)

Client / site

  • PM Kieran Brown0436456116

05Update log

Monday updates and replies on this project's requests, newest first.

  1. IV0025917 sent to client - Shaz 101126 1x mini tmp 2x 5tgs Invoice IV0025917 from Crompton Concepts for Disc Landscapes & Construction - Centenary Lakes Park.eml

  2. Hi @Permits, Please invoice: IV0025917 Kieranb@disclandscapes.com.au PO014069 - Crompton.pdf

  3. 29 Oct 2026, 5:38 pm · John Paul Ebarsabal · CC06592 - Disc Landscapes & Construction - Centenary Lakes Park

    Hi @Christopher Wright , This Plan is ready for TMD review, Please let me know if we need changes, Thank you! Here's the link of the: TGS for Site active and Aftercare https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... TMP: https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume...

  4. Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS: * TMP:

  5. Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS: * TMP:

  6. Hi Plans folder: 1. Plans - CC06592 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: Centenary Lakes Park Quote: QU5755 Request type: New plans Scope: TGS & TMP SMALL TMP, 1x ACTIVE TGS, 1x AFTERCARE TGS Client mark-ups/attachments: Quote QU5755 (1).pdfMap.pdfPO014069 - Crompton.pdf111814_VP512688_Appendix_A_IFC_Design_Drawings.pdf Fw_ Centenary lakes foot bridge construction - quote request .eml

    • 29 Oct 2026, 10:44 am · Riri D.

      Hi @John Paul Ebarsabal Project scope: "We’ve been awarded a new project for the City of Moreton Bay involving the demolition of the existing footbridge and construction of a new one at Centenary Lakes. As part of the contract, we need a Traffic Guidance Scheme (TGS) and Traffic Management Plan (TMP) covering pedestrian and vehicle movements throughout the works. Chris sent me your contact details as you or your team may be able to assist with this. I’ve attached a marked-up plan showing what I have in mind for the site setup and traffic management. We’ll have a site compound/laydown area for deliveries, with our site toilet and skip bin located there. We’ll also need to use an 8T excavator to install the piles, which will require tracking the machine around the lake to access each side of the bridge. My initial thought is to have a spotter walk with the excavator to manage any…

    • 30 Oct 2026, 11:50 am · Christopher Wright

      Hi @John Paul Ebarsabal The TMP will need to be worked on as this has not been completed yet. @Riri D. Can you allocate a planner to assist @John Paul Ebarsabal with amending this please. There are more issues than what i have provided here.

    • 30 Oct 2026, 12:19 pm · Riri D.

      @Leo Escoton could you please assist @John Paul Ebarsabal regarding the above comments from our TMD Chris? Thanks!

    • 30 Oct 2026, 1:01 pm · Leo Escoton

      Hi @Riri D., @Christopher Wright, and @John Paul Ebarsabal TMP has been amended. Added CTMP as well. Thank you!

    • 30 Oct 2026, 1:20 pm · Christopher Wright

      @Leo Escoto. Thank you @D.B this is GTG

06Every file and folder

15 files in 14 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved