150 Charlotte Street, Brisbane
Hutchinson Builders
What's new
- 5 Nov 2026, 8:44 amD.B on CC06600 - Hutchinson Builders - 150 Charlotte St, Brisbane City: PLEASE HAVE THIS ON HOLD UNTIL CLIENT APPROVES
- 4 Nov 2026, 1:39 pmRiri D. on CC06600 - Hutchinson Builders - 150 Charlotte St, Brisbane City: Plans folder: 1. Plans - CC06600 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 150 Charlotte Street, Brisbane Quote: QU5731 Job request form: none Request type: New Scope: Small TMP Risk Traffic Impact Queue Daily Arrangement Traffic…
- 4 Nov 20266 files saved on SharePoint: PLANS - Quote QU5731.pdf, PLANS - Quote QU5731.pdf, Fw 150C - Preliminary TMP Advice.eml, Fw 150C - Preliminary TMP Advice.eml and 2 more
Crompton Concepts prepares the traffic management for Hutchinson Builders on this project at 150 Charlotte St, Brisbane City QLD 4000. 1 Monday request is open; the most pressing is at the in drafting stage; 1 TGS suite on file (S1 Rev 00). Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- Folder1. Plans - CC06600
- MondayCC06600 - Hutchinson Builders - 150 Charlotte St, Brisbane City
- Client
- Hutchinson Builders
- Crompton job
- CC06600
- Location
- 150 Charlotte St, Brisbane City QLD 4000
- LGA / authority
- City of Brisbane
- Project coordinator
- D.B
- Latest planner · TMD
- —
- Monday project status
- New
- Deliverables
- TGS, TMP
- Permits (Monday)
- None on the permit boards
- Last activity
- 5 Nov 2026
- Files on SharePoint
- 9 in 37 folders
What needs attention now
- In drafting: CC06600 - Hutchinson Builders - 150 Charlotte St, Brisbane City. Required by 11 Nov 2026 (overdue). · Last note (5 Nov 2026, D.B): “PLEASE HAVE THIS ON HOLD UNTIL CLIENT APPROVES”
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLFw 150C - Preliminary TMP Advice4 Nov 2026
- EML150C - Preliminary TMP Advice4 Nov 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| S1 | TGS | Rev 00 | 7 Sep 2026 | 1 | Appendix 2 - Site Establishment Plan - R2.pdf |
03Requests on Monday
1 request since 4 Nov 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06600 - Hutchinson Builders - 150 Charlotte St, Brisbane City | New plans | In drafting OH HOLD | 4 Nov 2026 | 11 Nov 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- DecProject coordinator (folder flag)
- D.BProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 5 Nov 2026, 8:44 am · D.B · CC06600 - Hutchinson Builders - 150 Charlotte St, Brisbane City
PLEASE HAVE THIS ON HOLD UNTIL CLIENT APPROVES
- 4 Nov 2026, 1:39 pm · Riri D. · CC06600 - Hutchinson Builders - 150 Charlotte St, Brisbane City
Plans folder: 1. Plans - CC06600 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 150 Charlotte Street, Brisbane Quote: QU5731 Job request form: none Request type: New Scope: Small TMP Risk Traffic Impact Queue Daily Arrangement Traffic Guidance Scheme - Active (Stage 1)Daily Arrangement: * footpath closed (work area) * parking lane closed (work zone) Traffic Guidance Scheme - Aftercare (Stage 1) * footpath open (pedestrian access) * parking lane open (pedestrian access) AWNING REPAIRS (2 MONTHS)Traffic Guidance Scheme - Active (Stage 2)Awning Repairs: * footpath closed (work area) * parking lane closed (work zone) Traffic Guidance Scheme - Aftercare (Stage 2)Awning Repairs: * footpath closed (work area) * parking lane closed (pedestrian access) CRANE LIFTS (DATE SPECIFIC)Traffic Guidance Scheme - Active * footpath closed (work area) * parking lane closed (work area) * 1/2 active traffic lanes closed (work area) PLANS - Quote QU5731.pdf Appendix 2 - Site Establishment Plan - R2.pdf Fw 150C - Preliminary TMP Advice.eml 150C - Preliminary TMP Advice.eml
06Every file and folder
9 files in 37 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|