33 Park Rd, Milton

Hutchinson Builders

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Hutchinson Builders on this project at 15–17 Douglas Street, Milton QLD 4064. 1 Monday request is open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 01). Every file opens straight from SharePoint.

Client
Hutchinson Builders
Crompton job
CC06605
Location
15–17 Douglas Street, Milton QLD 4064
LGA / authority
City of Brisbane
Project coordinator
Mackenzy Moller
Latest planner · TMD
P.P · Christopher Wright
Monday project status
New
Deliverables
TGS, TMP
Permits (Monday)
None on the permit boards
Last activity
17 Nov 2026
Files on SharePoint
23 in 39 folders

What needs attention now

  1. Urgent Review comments to action: CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road). Required by 10 Nov 2026 (overdue). Planner: P.P · TMD: Christopher Wright · Last note (17 Nov 2026, P.P): “@Mackenzy Moller Internal revisions made as per Sanju. Please note that client request concrete trucks to reverse out of site into traffic is not feasible due to LOS F conditions.…”

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 0117 Nov 20262CC06605-CTMP-Rev01- 33 Park Rd, Milton.pdf
—TMPRev 0117 Nov 20262CC06605-TMP-Rev01.pdf
—RARev 0117 Nov 20262CC06605-RA.pdf
—TIARev 0117 Nov 20262CC06605-TIA.pdf
GeneralWorkzone planRev 0012 Nov 20261CC06605-WZ Plan- Rev 00- 15-18 Douglas St, Milton.pdf
S1TGSRev 0117 Nov 20262CC06605-S1-TGS-Rev01- 15-17 Douglas St, Milton.pdfCC06605-S1-TGS-Rev01- 33 Park Rd, Milton.pdf

03Requests on Monday

1 request since 6 Nov 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road) UrgentNew plansReview amendments
Internal Amendments
6 Nov 202610 Nov 2026P.PChristopher Wright

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • MaccaProject coordinator (folder flag)
  • P.PPlanner
  • Christopher WrightTMD
  • Mackenzy MollerProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. @Mackenzy Moller Internal revisions made as per Sanju. Please note that client request concrete trucks to reverse out of site into traffic is not feasible due to LOS F conditions. Trucks will need to nose into the closure area then reverse onto pump from within closure and then nose out into traffic when sufficient gaps exist. Information regarding specific positioning of concrete pumps was not given so I have made assumptions on where they should go. TMP: Rev 01 TGS: Rev 01

    • 17 Nov 2026, 8:13 am · Mackenzy Moller

      Okay thank you, can this please be TMD reviewed this morning @Christopher Wright @Riri D. @S.B

  2. Hi Patrick, Jurisdiction: QLD (Brisbane City Council local roads), so I've reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and BCC requirements. Nice, thorough set. All 10 site-active / detour / aftercare scenarios are covered for both frontages, the client's work-zone extents are picked up (Rev 1 note "Client amendments to work zone extent on all site active TGS's"), 7B–9B have the one-way detours with ROAD CLOSED AHEAD / DETOUR / END DETOUR, and 10B aftercare shows the advance signs covered. A few things to fix before it goes back to Mackenzy: 1. Client name and email are wrong on every sheet * All title blocks and the cover read "Hutchison Builders" and "brad.clark@hutchisonbuilders.com.au". It should be Hutchinson. As written, the email would bounce. Please fix it in the TGS template and the CTMP. 2. Concrete pours: trucks reversing * The client form says "hopper is north facing, trucks to reverse out". I can't find any reversing note on 7B, 8B or 9B. Please add the agitator reversing movement and who controls it (TC holding traffic and pedestrians on the footpath/ped route while the truck reverses, plus a spotter behind the truck), and show the pump/agitator positions. 3. Speed signs * Every sheet header says "Road Speed: 40 km/hr", but each sheet carries both END ROADWORK 50 and END ROADWORK 40 plates, plus "40 / REDUCE SPEED" on all approaches. If Douglas St is already posted 40, the 40 REDUCE SPEED signs on that approach are redundant and should come off. If Park…

  3. @Mackenzy Moller @Riri D. TGS amendments complete as per client markups. Outllook servers are down in the United States at the time of typing this so I can't currently send/receive emails. If they are functioning before my day ends I will email them to you. I've tried to upload the pdf's to here as well as sharepoint links in the meantime. TGS Saved Here: Rev 01 TMP Saved here: Rev 01 CC06605-S1-TGS-Rev01- 15-17 Douglas St, Milton.pdf CC06605-CTMP-Rev01- 15-17 Douglas St, Milton.pdf

  4. 12 Nov 2026, 12:00 pm · Mackenzy Moller · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)

    @Riri D. @P.P Please confirm if the Amendments are being worked on as we speak and the ETA on when they will be completed CC06605-S1-TGS-Rev00- 15-17 Douglas St, Milton - HB MARKUP.pdf

    • 12 Nov 2026, 2:42 pm · Mackenzy Moller

      @P.P @Riri D. could you please confirm if these amendments are being actioned and an ETA oh when i will be able to send back to client

    • 13 Nov 2026, 12:44 am · P.P

      @Mackenzy Moller I will have these done today. In case you are unaware I am on the other side of the world so I do not work Australian hours.

  5. @Riri D. @Mackenzy Moller TMP is complete. Site contact added to TGS's as well. All items have been emailed to Mark with both of you and the Operations account CC'd

  6. TMP completion is pending client contact info and project dates/timeline. Document can be fully complete tomorrow if information is provided overnight.

    • 11 Nov 2026, 8:09 am · Mackenzy Moller

      ct Overview Project title: 33 Park Rd, Milton - Retail Expansion Project description and scope of works:* Description of what is being constructed * Number of floors (above and below ground) * Type of development (residential / commercial) 33 Park Rd, Milton - Retail Expansion – commercial Site details Site Address (including street number) 33 Park Rd, Milton - Retail Expansion Project dates:* Commencement date * Expected completion date Unsure at this point Proposed operational days / times: Mon – fri Key contacts Project Manager* Name * Email * Phone no. Dan Harrison 0412 573 089 daniel.harrison@hutchies.com.au Site Manager* Name * Email * Phone no. Brad Clark Brad.clark@hutchinsonbuilders.com.au 0434 019 122 Traffic Management Traffic Control Company (Implementing): Crompton Concepts Long-Term Signage No required Site Sheds and Bins Internal Raft Pours - how many - how often - Number…

  7. TGS sent to client Park Rd Milton Project .eml

  8. @Riri D. 10x TGS complete and sent to Mark Bryers as per instructions. TMP is pending TGS design approval and client information from Project Information Request Form. Currently no contacts or project dates/timelines have been provided. ETA for TMP is still currently late this week. Rev 00

    • 10 Nov 2026, 2:50 pm · Riri D.

      @P.P Site manager will be the following Brad Clark Brad.clark@hutchinsonbuilders.com.au 0434 019 122 Please use the following details for TMP, Mark has confirmed this is all we will require, How long would it take to have the TMP done, also 1 amendment for TGS on page 12 need to add another TC Project Overview Project title: 33 Park Rd, Milton - Retail Expansion Project description and scope of works:* Description of what is being constructed * Number of floors (above and below ground) * Type of development (residential / commercial) 33 Park Rd, Milton - Retail Expansion – commercial Site details Site Address (including street number) 33 Park Rd, Milton - Retail Expansion Project dates:* Commencement date * Expected completion date Unsure at this point Proposed operational days / times: Mon – fri Key contacts Project Manager* Name * Email * Phone no. Dan Harrison0412 573…

  9. TGS's in progress, ETA tuesday. TMP pending TGS completion. ETA late next week

  10. Plans folder: 1. Plans - CC06605 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 15–17 Douglas Street, Milton Quote: QU5667 Job request form: Request type: New Scope: TGS & TMP * TC requirements for the following setups:* Douglas St footpath closure (ped’s diverted to shoulder) * Park Rd footpath closure (ped’s diverted to shoulder) Combined Douglas St & Park Rd footpath closure (ped’s diverted to shoulder) Douglas St footpath & shoulder closure (ped’s diverted to opposite side of the st) Park Rd footpath & shoulder closure (ped’s diverted to opposite side of the st) Combined Douglas St & Park Rd footpath & shoulder closure (ped’s diverted to opposite side of the st) Douglas St East bound lane closure Park Rd Nth bound lane closure Combined Douglas St E bound & Park Rd N bound lane closure Quote QU5667.pdf Fw_ Park rd - Check over .eml

06Every file and folder

23 files in 39 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved