East End Adelaide CBD Works
Prime Traffic Solutions Pty Ltd
What's new
- 16 Nov 2026, 3:56 pmS.B on CC06611 - Prime Traffic Solutions - East End Adelaide CBD Works: Hi Kenny, Marie and Jenesis, Jurisdiction: South Australia. I've reviewed against AS 1742.3 / AGTTM with the SA DIT workzone requirements, plus City of Adelaide and DIT road ownership. Note that some of these roads are DIT arterials (Dequetteville Tce,…
- 13 Nov 20262 files saved on SharePoint: CC06611-TGS-S1-Rev2-East End Adelaide.pdf, CC06611-TGS-S1-Rev2-East End Adelaide.tcp
- 12 Nov 20262 files saved on SharePoint: CC06611-TGS-S1-Rev0-East End Adelaide, TGS.pdf, CC06611-TGS-S1-Rev0-East End Adelaide, TGS 1, 2, 3, 4, 5, 6.tcp.bak
- 12 Nov 2026, 11:46 amKenny on CC06611 - Prime Traffic Solutions - East End Adelaide CBD Works: Hi Team, The CC06611-S1-Rev0-East End Adelaide, TGS 1, 2, 3, 4, 5 & 6 has already been completed and uploaded to the folder. Please review it at your convenience. 1xCC06611-S1-0B/C Detour Analysis - Pirie St 6x Risk Assessment CC06611-S1-Rev0 (1A/B, 2A/B,…
- 11 Nov 20261 file saved on SharePoint: CC06611-TGS-S1-Rev0-East End Adelaide CBD Works_TGS 1 and 2.tcp.bak
- 10 Nov 2026, 1:56 pmRiri D. on CC06611 - Prime Traffic Solutions - East End Adelaide CBD Works: Plans folder: 1. Plans - CC06611 Suite: S1 Save work here: TGS > Rev 00 Project location: East End Adelaide CBD Works Quote: none Job request form: none Request type: New Scope: TGS TGS guide: Adelaide CBD TGS Explanation Pack 1.pdf Client: Interflow Works…
Crompton Concepts prepares the traffic management for Prime Traffic Solutions Pty Ltd on this project at 155 East Terrace, Adelaide SA 5000. 1 Monday request is open; the most pressing is at the TMD approved stage; 2 TGS suites on file (General no rev, S1 Rev 02). Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- Folder1. Plans - CC06611
- MondayCC06611 - Prime Traffic Solutions - East End Adelaide CBD Works
- Client
- Prime Traffic Solutions Pty Ltd
- Crompton job
- CC06611
- Location
- 155 East Terrace, Adelaide SA 5000
- LGA / authority
- City of Adelaide
- Project coordinator
- Neil Lancaster
- Latest planner · TMD
- J.R, Kenny, Marie Est · Christopher Wright
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- None on the permit boards
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 13 in 15 folders
What needs attention now
- TMD approved, ready to issue: CC06611 - Prime Traffic Solutions - East End Adelaide CBD Works. Required by 12 Nov 2026 (overdue). Planner: J.R, Kenny, Marie Est · TMD: Christopher Wright · Last note (16 Nov 2026, S.B): “Hi Kenny, Marie and Jenesis, Jurisdiction: South Australia. I've reviewed against AS 1742.3 / AGTTM with the SA DIT workzone requirements, plus City of Adelaide and DIT road…”
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFAdelaide CBD TGS Explanation Pack 1.pdf10 Nov 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLUpcoming Adelaide CBD works10 Nov 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| General | TGS | no rev | 10 Nov 2026 | 0 | Adelaide CBD TGS Explanation Pack 1.pdf |
| S1 | TGS | Rev 02 | 13 Nov 2026 | 2 | CC06611-TGS-S1-Rev2-East End Adelaide.pdf |
03Requests on Monday
1 request since 10 Nov 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06611 - Prime Traffic Solutions - East End Adelaide CBD Works | New plans | TMD approved TMD Approved | 10 Nov 2026 | 12 Nov 2026 | J.R, Kenny, Marie Est | Christopher Wright |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- NeilProject coordinator (folder flag)
- J.RPlanner
- KennyPlanner
- Marie EstPlanner
- Christopher WrightTMD
- Neil LancasterProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 3:56 pm · S.B · CC06611 - Prime Traffic Solutions - East End Adelaide CBD Works
Hi Kenny, Marie and Jenesis, Jurisdiction: South Australia. I've reviewed against AS 1742.3 / AGTTM with the SA DIT workzone requirements, plus City of Adelaide and DIT road ownership. Note that some of these roads are DIT arterials (Dequetteville Tce, Fullarton Rd, Wakefield Rd / Bartels Rd). Good work getting all six TGSs out in Prime's format. The cover revision history is clear (Rev 1 additional signage, Rev 2 END ROADWORK signage), street speeds are labelled on every sheet, 1C has the "To run concurrently with INTF-DWG-6026" note Prime asked for, cyclists get LANE CLOSED / SHARE THE ROAD, and 2C/3C have the Adelaide Metro coordination note. Before this goes to Prime / Interflow: 1. SA-specific items * QLD sign codes on SA plans: every legend uses "T5-Q02 Chevron Delineator". The "Q" codes are QLD MUTCD only. Please swap these for the AS 1742.3 equivalent and check the manifests for any other Q-coded signs. * Road authority / DIT: the cover says State Agency "N/A", but TGS 5/6 (Dequetteville Tce), TGS 4 (Fullarton Rd turn bans) and the arterial approaches are DIT roads. Please list DIT as the state agency and note that a DIT road occupancy / working-hours approval is required. TGS 6's right-turn ban into King William St also needs DIT signal changes, which need a note on 6C. * Council: 4D/4E (Dulwich Ave) show "City of Adelaide", but Dulwich Ave / Fullarton Rd looks like City of Burnside (as flagged in the explanation pack). 5C/5D/5E (Kent Town) may also be a different…
- 12 Nov 2026, 11:46 am · Kenny · CC06611 - Prime Traffic Solutions - East End Adelaide CBD Works
Hi Team, The CC06611-S1-Rev0-East End Adelaide, TGS 1, 2, 3, 4, 5 & 6 has already been completed and uploaded to the folder. Please review it at your convenience. 1xCC06611-S1-0B/C Detour Analysis - Pirie St 6x Risk Assessment CC06611-S1-Rev0 (1A/B, 2A/B, 3A/B, 4A/B/, 5A/B, 6A/B,) 1xCC06611-S1-1C/D Pirie Street Sewer Maintenance Works 1xCC06611-S1-2C Bartels Road Sewer Maintenance Works 1xCC06611-S1-3C Wakefield Road Sewer Maintenance Works 1xCC06611-S1-4D/E Dulwitch Ave Sewer Maintenance Works 1xCC06611-S1-5C/D/E Dequetteville Terrace Sewer Maintenance Works 1xCC06611-S1-6C Dequetteville Terrace Sewer Maintenance Works Folder Link: Rev 00Let me know if there is further need Thank you.
- 10 Nov 2026, 1:56 pm · Riri D. · CC06611 - Prime Traffic Solutions - East End Adelaide CBD Works
Plans folder: 1. Plans - CC06611 Suite: S1 Save work here: TGS > Rev 00 Project location: East End Adelaide CBD Works Quote: none Job request form: none Request type: New Scope: TGS TGS guide: Adelaide CBD TGS Explanation Pack 1.pdf Client: Interflow Works Type: Sewer Maintenance Contacts: Name: Jarred Earl Position: Project Manager Phone Number: 0437 652 093 Email: jearl@interflow.com.au Website: interflow.com.au Logo: Email Thread: Upcoming Adelaide CBD works.eml Additional Docs: SINEO+ 450i26110912060.pdf Snippets/Markups: TGS 1- Pirie Street- Pages 4-6 Road Closure West bound traffic. Exclusion zone on mark up below, Please add a note on the northern side of the plan: “To run concurrently with INTF-DWG-6026” TGS 2- Bartels Road/East Terrace- Pg 7-9 Contraflow Exclusion zone on mark up below. TGS 3- East Terrace/Wakefield Road- Pg 10-12 Left Lane Closure Undivided 60km to 40km. Please close the side street East Terrace to not allow traffic to exit left or right onto Wakefield Street. TGS 4- Dulwich Avenue and Fullarton Road Half Road Closure of East Bound Traffic on Dulwich Avenue 13-14. TGS 5- Princes Hwy/ Dequetteville Terrace pg. 15-18 Left Lane Closure North Bound Exculsion zone indicated by red line on mark up below. Lanes will need be taken out before the intersection for adequate Advanced warning. * We can allow traffic to turn left from Bartels Road onto Princes Hwy. TGS 6 Sheet 1 South Bound Lane Clousre/ Turning Lane North bound closure TGS 6 Sheet 2 *Running at…
- 12 Nov 2026, 11:50 am · Kenny
Hi @Christopher Wright , The CC06611-S1-Rev0-East End Adelaide, TGS 1, 2, 3, 4, 5 & 6 has already been completed and uploaded to the folder. Please review it at your convenience. 1xCC06611-S1-0B/C Detour Analysis - Pirie St 6x Risk Assessment CC06611-S1-Rev0 (1A/B, 2A/B, 3A/B, 4A/B/, 5A/B, 6A/B,) 1xCC06611-S1-1C/D Pirie Street Sewer Maintenance Works 1xCC06611-S1-2C Bartels Road Sewer Maintenance Works 1xCC06611-S1-3C Wakefield Road Sewer Maintenance Works 1xCC06611-S1-4D/E Dulwitch Ave Sewer Maintenance Works 1xCC06611-S1-5C/D/E Dequetteville Terrace Sewer Maintenance Works 1xCC06611-S1-6C Dequetteville Terrace Sewer Maintenance Works Folder Link: Rev 00 Let me know if there is further need Thank you.
- 17 Nov 2026, 6:32 am · Christopher Wright
This has been sent to the client
- 12 Nov 2026, 11:50 am · Kenny
06Every file and folder
13 files in 15 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|