Marine Parade, Coolangatta
Versatile_PAY UPFRONT
What's new
- 16 Nov 20261 file saved on SharePoint: TMP Project Information Request (1).docx
- 12 Nov 2026, 11:11 amRiri D. on CC06614 - Versatile - Marine Parade, Coolangatta: CONTEXT: This project is being taken over from CF Group / KTQ who is still currently on site completing the early works, Versatile is the builder and will be on site for all construction activities moving forward until the end of the project. Versatile have…
- 12 Nov 20261 file saved on SharePoint: Quote QU5803 - Planning Estimate.pdf
- 11 Nov 20265 files saved on SharePoint: MUSGRAVE ST.pdf, Marine Parade Frontage.png, Re_ CMP Update - Kirra Point Stage 2.pdf, 26280 - Rev 3-Model.pdf and 1 more
Crompton Concepts prepares the traffic management for Versatile on this project at Marine Parade, Coolangatta, QLD. 1 Monday request is open; the most pressing is at the in drafting stage. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- Folder4. Plans - CC06614
- MondayCC06614 - Versatile - Marine Parade, Coolangatta
- Client
- Versatile
- Crompton job
- CC06614
- Location
- Marine Parade, Coolangatta, QLD
- LGA / authority
- City of Gold Coast
- Project coordinator
- Ethan Mathews
- Latest planner · TMD
- J.R · S.B
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- None on the permit boards
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 7 in 17 folders
What needs attention now
- In drafting: CC06614 - Versatile - Marine Parade, Coolangatta. Required by 18 Nov 2026. Planner: J.R · TMD: S.B · Last note (12 Nov 2026, Riri D.): “CONTEXT: This project is being taken over from CF Group / KTQ who is still currently on site completing the early works, Versatile is the builder and will be on site for all…”
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- DOCXTMP Project Information Request (1).docx16 Nov 2026
- PDFMUSGRAVE ST.pdf11 Nov 2026
- PDFRe_ CMP Update - Kirra Point Stage 2.pdf11 Nov 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
Nothing filed for this yet.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
Nothing filed for this yet.
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
No TMP, TGS or report PDFs found in the project folder yet.
03Requests on Monday
1 request since 12 Nov 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06614 - Versatile - Marine Parade, Coolangatta | New plans | In drafting Working on it | 12 Nov 2026 | 18 Nov 2026 | J.R | S.B |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- J.RPlanner
- S.BTMD
- Ethan MathewsProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 12 Nov 2026, 11:11 am · Riri D. · CC06614 - Versatile - Marine Parade, Coolangatta
CONTEXT: This project is being taken over from CF Group / KTQ who is still currently on site completing the early works, Versatile is the builder and will be on site for all construction activities moving forward until the end of the project. Versatile have reviewed the TGS's and methodology that we have used for CF Group / KTQ Group and have adjusted the methodology and requirements slightly as per the new attached site layout docs. I have prepared a quote based off what we believe will cover Versatile for the life of the project (See attached), which includes mainly amendments to the current plans already prepared for CF Group / KTQ, however just altering the methodology slightly and adding Versatiles details to the TGS's, as well as a few new TGS's that will need to be created due to the change in builder and methodology provided. OBJECTIVE: Essentially what is required is to copy and past a new of the listed TGS's from KTQ Group suite (S3) into a new Suite for Versatile Constructions, while amending those TGS's to accommodate the new methodology and then create a few NEW TGS's as per the quote and Site layout mark up. We will also need to prepare a brand new CTMP (Medium) for this project and have it accurate to the new requirements for this project for Versatile with new Site contacts etc. NOTE: I have provided Chris from Versatile with our TMP information request form to fill out to the best of his ability for us to complete the CTMP using which I will follow up in the…
- 16 Nov 2026, 7:03 am · Ethan Mathews
Good Morning Jenesis, the client has filled out the TMP information request word doc for you, please see attached here for your reference when finalizing the CTMP, thank you! TMP Project Information Request (1).docx
- 16 Nov 2026, 7:03 am · Ethan Mathews
06Every file and folder
7 files in 17 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|