← All projectsCC06615
Project portal · built 17 Nov 2026, 10:03 am AEST · TMD review

26 Victoria St, West End

PKM Civil Pty Ltd

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for PKM Civil Pty Ltd on this project at 26 Victoria Street West End, Qld 4101. 1 Monday request is open; the most pressing is at the TMD review stage; 1 TGS suite on file (S1 Rev 00). On the permit boards: 0 permits in force and 1 in progress. Every file opens straight from SharePoint.

Client
PKM Civil Pty Ltd
Crompton job
CC06615
Location
26 Victoria Street West End, Qld 4101
LGA / authority
City of Brisbane
Project coordinator
D.B
Latest planner · TMD
Rudra Khadka · Christopher Wright
Monday project status
New
Deliverables
TGS
Permits (Monday)
0 in force · 1 in progress
Last activity
16 Nov 2026
Files on SharePoint
7 in 37 folders

What needs attention now

  1. Needs TMD review: CC06615 - PKM - 26 Victoria St, West End. Required by 18 Nov 2026. TMD: Christopher Wright · Last note (16 Nov 2026, S.B): “Hi Rudra, Jurisdiction: QLD (Brisbane City Council local road), so I've reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and BCC. Thanks for picking this up. 1C has a clear…”
  2. Permit in progress: CC06615 - PKM - 26 Victoria St, West End (BCC road) is To do.

PPermits

1 permit line on the Monday permit boards: 0 in force, 1 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
CC06615 - PKM - 26 Victoria St, West End
Team Declan · BCC Road Permits - Declan
BCC roadIn progress
To do

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

    Nothing filed for this yet.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
S1TGSRev 0016 Nov 20261CC06615-S1-Rev00-26 Victoria Street,West End.pdf

03Requests on Monday

1 request since 12 Nov 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06615 - PKM - 26 Victoria St, West EndNew plansTMD review
TMD Review
12 Nov 202618 Nov 2026Rudra KhadkaChristopher Wright

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • DeclanProject coordinator (folder flag)
  • Rudra KhadkaPlanner
  • Christopher WrightTMD
  • D.BProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 16 Nov 2026, 3:57 pm · S.B · CC06615 - PKM - 26 Victoria St, West End

    Hi Rudra, Jurisdiction: QLD (Brisbane City Council local road), so I've reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and BCC. Thanks for picking this up. 1C has a clear shuttle setup with STOP HERE WHEN DIRECTED and PREPARE TO STOP on both approaches, 30 m queue lengths, footpath closed with USE OTHER FOOTPATH signs and a TC assisting pedestrians, a min. 3.0 m trafficable lane note, the 7am–4pm no-parking note, and 2C covers the signs after hours. A few fixes, the first being critical: 1. Wrong job number on every title block * The cover and every sheet are numbered "CC05237-S1-0A / 0B / 1A / 1B / 1C / 2A / 2B / 2C", but this job is CC06615 (the file name and the "Refer to TGS CC06615-S1-2C" notes are correct). Please renumber all sheets and the TGS schedule. As it stands, the permit would reference another job's drawings. 2. Aftercare (2C / 2A) has site-active items * 2C still shows "STOP HERE WHEN DIRECTED", "30 m Queue Length" and the queue dimensions copied from 1C. Please remove them so 2C only shows what stays overnight. * 2A "Minimum TGS Assets" says TC (Including Breaks): 3, TC Vehicle: 2. For aftercare these should be 0. 3. Placeholders and copy-paste * 1A and 2A: "TC Vehicle (VMS): TBA", "Truck Mounted Attenuator: TBC", "Lighting Tower: Value". Please replace with N/A or the actual numbers. * 0B Traffic Impact Assessment: "Adopted 30 m queue length on Brisbane Rd". That's from another job. Should be Victoria St. * The notes print as "Min. 3.0m ƚraĸcable lane…"…

    • 16 Nov 2026, 8:01 pm · Rudra Khadka

      Hi Sanju, I have checked and amended the requirement as per above comments , but some of the comments doesn't appear to suit the site adjustment and requirements; Will you please confirm these below points. * The notes print as "Min. 3.0m ƚraĸcable lane…" and "Two-way ƚraĸc…", which is a font/ligature issue. Please retype them so "traffic" prints correctly.: = This is doubled checked and couldn't find any such errors on TGS note. * The client asked for a footpath closure and a 7–4 work zone for a truck, with an excavator loading over the footpath from inside the site. 1C goes further, to a full shuttle flow with 3 TCs (manifest shows 5 x Traffic Controller vs "TC (Including Breaks): 3"). If the 3.0 m remaining lane means a shuttle is genuinely needed, add a line of reasoning to 1A and align the TC count. If the truck fits in the parking lane with two-way traffic kept, a parking-lane…

  2. 12 Nov 2026, 6:28 pm · Riri D. · CC06615 - PKM - 26 Victoria St, West End

    26 Victoria St, West End QLD Looking for assistance how we can do this one, We are demolishing this house and removing the driveway ect, the council side of the property is going to be untouched, although we have an access problem, and would like to have a permit to park our truck outside this address, and load rubbish with an excavator from inside the property but over the footpath and into the trucks parked on the road. So 2 main things, occupying the footpath / closing it off to pedestrians for safety, and a 7-4 no parking where we can park a truck and not have the public parked up here during the day as it gets busy, so im guess that would be a “work zone”. The actual work will only take a few days, up to 2 weeks at most. Plans folder: 1. Plans - CC06615 Suite: S1 Save work here: TGS > Rev 00 Project location: 26 Victoria St, West End Quote: QU5814 Job request form: none Request type: New Scope: TGS Quote QU5814.pdf

    • 13 Nov 2026, 3:39 pm · Rudra Khadka

      Hi, @Y.E FYI: Taking over this allocations. Thank You!

    • 16 Nov 2026, 3:27 pm · Rudra Khadka

      Hi @D.B @Christopher Wright Work is completed and uploaded to link attached below. Kindly, let me know if this requires further changes. Link:Rev 00 Accounts, 2 x TGS ( CC06615-1B & 2B) Thank You!

06Every file and folder

7 files in 37 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved