60 Queen St
INZ Electrical
Other Crompton jobs at this address, for a different client: Built (CC06117), Demex (CC06519). They are separate jobs with their own CC numbers.
What's new
- 16 Nov 20262 files saved on SharePoint: Invoice IV0025961.pdf, Customer Invoice 1501 1800334180 Qld Government.PDF
- 12 Nov 20263 files saved on SharePoint: Invoice IV0025958.pdf, Customer Invoice 1501 1800334175 Qld Government.PDF, image.png
- 28 Sep 2026, 11:25 amSandy on CC06533 - NMP - INZ Electrical - 60 Queen St (Energex Pit Works): Hi @Y.B Plans folder: Plans - CC06533 Suite: NMP Save work here: NMP > NMP Project location: 60 Queen St Quote: QU-5620 Request type: New Scope: NMP Specific operations: TGS to amend: N/A Client mark-ups/attachments: Any specific files the planner needs to…
- 10 Sep 2026, 6:22 pmRiri D. on CC06533 - INZ Electrical - 60 Queen St: Chelsea team catch up 10-09-26.pdf Invoice 1x TGS CC06533-S1-1C Cable Pit Works
- 24 Aug 2026, 3:37 pmA.A on CC06533 - INZ Electrical - 60 Queen St: @Riri D. GTG
- 24 Aug 2026, 9:59 amA.A on CC06533 - INZ Electrical - 60 Queen St: @Y.B Please amend as attached.CC06533-S1-TGS-Rev00-60 Queen St.pdf
Crompton Concepts prepares the traffic management for INZ Electrical on this project at 60 Queen St, Brisbane City, QLD. No Monday request is open right now; the latest one closed recently; 1 TGS suite on file (S1 Rev B). On the permit boards: 0 permits in force and 0 in progress. Monday holds 2 requests for this job (1 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.
- Client
- INZ Electrical
- Crompton job
- CC06533
- Location
- 60 Queen St, Brisbane City, QLD
- LGA / authority
- City of Brisbane
- Project coordinator
- C.C
- Latest planner · TMD
- —
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- 0 in force · 0 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 49 in 76 folders
What needs attention now
- Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.
PPermits
1 permit line on the Monday permit boards: 0 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| Road Permit Team Declan · BCC Road Permits - Declan | BCC road | Date Specific | Expired Done | 11 Oct 2026 – 11 Nov 2026 | 9 Oct 2026 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
Nothing filed for this yet.
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | NMP | Rev 00 | 6 Oct 2026 | 1 | Noise Management Plan - Cable Pit Works.pdf |
| — | Letter to residents | Rev 00 | 2 Oct 2026 | 1 | CC06519 - Letter to residents - Rev 0.pdf |
| S1 | TGS | Rev B | 20 Aug 2026 | 3 | D260852-C01 - 60 Queen St - Rev B.pdf |
03Requests on Monday
2 requests since 20 Aug 2026: 1 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06533 - NMP - INZ Electrical - 60 Queen St (Energex Pit Works) Urgent | Amendment | NMP | Invoiced Invoiced | 28 Sep 2026 | 30 Sep 2026 | |||
| CC06533 - INZ Electrical - 60 Queen St | New plans | Invoiced Invoiced | 20 Aug 2026 | 25 Aug 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- !! Archived
- CA Name - Email
- CA Name - Phone Number
- CA Email Address
- CA Phone Number
- Projc. Engr. Name - Email
- Projc. Engr. Name - Phone Number
- Site Engr. Name - Email
- Site Engr. Name - Phone Number
- ACCOUNTSaccounts@inzelec.com.au
- PM Stone Kolio0401731181
- PM Email Address
- PM Phone Number
- SM Name - Email
- SM Name - Phone Number
- SM Email Address
- SM Phone Number
- WHS Name - Email
- WHS Name - Phone Number
- WHS Email Address
- WHS Phone Number
Crompton Concepts
- C.CProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 28 Sep 2026, 11:25 am · Sandy · CC06533 - NMP - INZ Electrical - 60 Queen St (Energex Pit Works)
Hi @Y.B Plans folder: Plans - CC06533 Suite: NMP Save work here: NMP > NMP Project location: 60 Queen St Quote: QU-5620 Request type: New Scope: NMP Specific operations: TGS to amend: N/A Client mark-ups/attachments: Any specific files the planner needs to refer to? Quote QU5620.pdf
- 29 Sep 2026, 1:34 pm · Y.B
Hi @C.C @D.B @Riri D., requesting the following info for the NMP: 1. Plant and equipment that will be used for the works. (sample below) 2. Work Schedule (date/time/duration) Thank you!
- 29 Sep 2026, 4:07 pm · Y.B
Hi @C.C @D.B @Riri D., following up on the pending info. I'm ready to finalize the NMP, I only need the info above. Please tag me once the info is available. Thank you!
- 30 Sep 2026, 10:08 am · D.B
@Y.B waiting on client
- 1 Oct 2026, 11:48 am · D.B
Other Equipment * 2 x MR Body Trucks * 1 x Crew Truck with Trailer MM-IMS-SAF-003 Plant Risk Assessment (MML22) reviewed_20261001.pdf
- 1 Oct 2026, 12:09 pm · D.B
INZ Electrical: 11/10 – 15/10 (contingencies: 18/10 – 21/10) * confirming 10:00pm – 5:00am
- 1 Oct 2026, 3:20 pm · Y.B
@D.B Hi @A.A, I've uploaded the NMP for your review. Please let me know if changes are required. Thank you! 1x new NMP Sharepoint - Documents - Rev 00 - All Documents
- 6 Oct 2026, 8:38 am · Christopher Wright
This is GTG @D.B
- 29 Sep 2026, 1:34 pm · Y.B
- 10 Sep 2026, 6:22 pm · Riri D. · CC06533 - INZ Electrical - 60 Queen St
Chelsea team catch up 10-09-26.pdf Invoice 1x TGS CC06533-S1-1C Cable Pit Works
- 6 Oct 2026, 12:18 pm · Riri D.
Invoice IV0025486 sent to client - Re_ WR8369511 & WR8369509 - 60 Queen St, Brisbane (SSMUF & SG6590 & SG3063 recoveries) - BCC Permits Required For Energex Pit Works .eml
- 6 Oct 2026, 12:18 pm · Riri D.
- 24 Aug 2026, 3:37 pm · A.A · CC06533 - INZ Electrical - 60 Queen St
@Riri D. GTG
- 1 Sep 2026, 8:06 pm · Riri D.
Plans sent to client - Re_ WR8369511 & WR8369509 - 60 Queen St, Brisbane (SSMUF & SG6590 & SG3063 recoveries) - BCC Permits Required For Energex Pit Works .eml
- 1 Sep 2026, 8:06 pm · Riri D.
- 24 Aug 2026, 9:59 am · A.A · CC06533 - INZ Electrical - 60 Queen St
@Y.B Please amend as attached.CC06533-S1-TGS-Rev00-60 Queen St.pdf
- 24 Aug 2026, 11:07 am · Y.B
Hi @A.A, TGS has been updated and reuploaded. Thanks!
- 24 Aug 2026, 11:07 am · Y.B
- 20 Aug 2026, 4:53 pm · Riri D. · CC06533 - INZ Electrical - 60 Queen St
Plans folder: Plans - CC06533 Suite: S1 Save work here: TGS > Rev 00 Project location: 60 Queen St Quote: none Request type: New Scope: TGS * Partial lane closure of Burnett Ln: This option is proposed assuming that the works can be safely conducted behind traffic delineation and work vehicles parked in the parking area adjacent to the existing pit. We will have to maintain a minimum 3.3 m lane for safe traffic movement. TC requirements 2 TC and 1 QPS officer is recommended to maintain the safety of workers and public due to the unpredictable nature of the patrons visiting licensed premises within the laneway. * Full Closure of Burnett Ln: If the 3.3 m lane width cannot be maintained a full closure is recommended. TC requirements 2 TC and 2 QPS officer. Client mark-ups/attachments: see attached doc and email thread FW_WR8_1.EML D260852-C01 - 60 Queen St - Rev B.pdf
- 20 Aug 2026, 4:54 pm · Riri D.
@Y.B please teams @A.A if you have any questions/clarifications for the attached markups
- 21 Aug 2026, 1:44 pm · Y.B
Hi @A.A, I've uploaded the TGS for your review. Please let me know if any changes are required. Thank you! 1x New TGS CC06533-S1-1C-Cable Pit Works Sharepoint - Documents - Rev 00 - All Documents
- 20 Aug 2026, 4:54 pm · Riri D.
06Every file and folder
49 files in 76 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|